英语人>网络例句>pedestal rock 相关的网络例句
pedestal rock相关的网络例句

查询词典 pedestal rock

与 pedestal rock 相关的网络例句 [注:此内容来源于网络,仅供参考]

The study provided 2 kinds of finish systems which were pouring and anchoring rock-wool panel respectively. In general, galvanizing steel-meshwork using machine anchor can use all kinds of Rock-wool panel made in China. The interface mortar used in Rock-wool can prevent worker's hand from hurting and improve the water-proof capability and bonding intensity of rock-wool panel. The low-heat conductivity of polystyrene foaming granule paste improved the integer and anti-crack of system. The 2 kinds of rock-wool system all can resolve the current rock-wool panel applied difficulty in outer-wall external thermal insulation. The rock-wool external thermal insulation which has very nice fire-proof capability can apply any kinds of builds, especially high-rise buildings.

研究提出了现浇和锚固岩棉板2种涂料饰面构造做法,其中采用机械锚固热镀锌钢网施工可充分利用国产各类型岩棉板;岩棉板的界面砂浆处理可起到防止岩棉纤维扎手、增强岩棉板的防水性能和提高岩棉板与找平层的粘结强度的作用;聚苯颗粒的低导热系数过渡层提高了系统的整体性和抗裂性。2种构造做法经试验和工程试点证明均可解决目前国内岩棉难以应用在外墙外保温系统中的技术问题,具有优异防火性能的岩棉外保温系统可应用于任何类型的建筑中,在高层建筑和防火要求高的建筑中其优势更为明显。

In engineering application, we think that the rock laboratory experiments may simulate and reshow rock bursts considering the conditions of coupled static-dynamic loads and rock burst and their comparison. Energy demand of rock burst occurring is revealed through analyzing energy transition of rock failure process under coupled static-dynamic loads. At the same time, the rule of energy utilization under coupled static-dynamic loads is discovered; the measures for rock cracking by utilizing high stress condition in deep rock mass and energy utilization improving are found.

在工程应用方面,将动静组合载荷下岩石受力条件和岩石发生岩爆的条件及两者发生的现象进行了对比,认为室内动静组合加载试验可以模拟再现现场发生的岩爆,并通过分析动静组合载荷下岩石破坏过程中能量的转化来揭示岩石发生岩爆的能量要求,而且发现了动静组合加载能量利用的规律,找到提高能量利用率的措施和利用深部岩体受力状况来致裂岩石的手段。

Reasonable pedestal damp trims the function of wave height of force, rock and pedestal displacement than can rising to reduce base.

合理的支座阻尼比可以起到降低基底剪力、晃动波高和支座位移的功能。

According to the change regularity of deformation modulus, combining with the rock mass structure characteristic of region studied, using interpolation method, the deformation modulus of rock mass in 36# adit can be deduced. The average vertical deformation modulus of rock mass during 0-70 zone is 39Gpa, and the horizontal deformation modulus of rock mass is 51. 3GPa in nature stress state and 50.8GPa in engineering load state. The average vertical deformation modulus of rock mass during 70-140 zone is 32. 2Gpa, and the horizontal deformation modulus of rock mass is 41GPa in nature stress state and 42. 6GPa in engineering load state. It will be a good reference of engineering design and evaluation.

9根据节理岩体变形模量变化规律,结合研究区岩体的结构特点,采用插值的方法对36号平硐岩体进行变形模量的推测,得到0-70段岩体的平均铅直向的变形模量为39GPa,水平向的变形模量:天然应力状态下为51.3GPa,工程荷载作用下为50.8GPa;70-140段岩体的平均铅直向的变形模量为32.2GPa,平向的变形模量:天然应力状态下为41GPa,工程荷载作用下为42.6GPa,这为工程设计、评程设计、评价等提供了必要的参考。

The main environment geological question is: The earth"s crust where the faultage and earthquake are active is unstable; collapse , landslide, mud-rock flow and soil erosion ; The underground karst subsides, seepage question; Basic rock expand, expend and compress soil body, the salt deposit corrode out of shape and groundwater"s corrodent harm; The soft soil question of basin; The soft rock body, cracked rock and the weathering rock are relatively poor stability; High and cold regional highways and railways" frozen soils freeze and melt calamity problem; The around rock of tunnel are unstable because of the coal seam gas, spring water, underground developed area; Project cutting slopes, constructed abandon soil and reservoir, lake"s ecology geological environmental protection issue; Thedangerous shoal of the channel % submerged reef question; The problem of rebuilding channel project and dock etc.; And the problem of unstable ground and groundwater corrosivity during building airport; At the same time, with the international big pathways" implementation and completions of constructions, adjusting the cities and counties" constructions , the crowd occupy changing , the cultivated land distribute changing and the adjustments of structure, will cause local environmental geological issues outstanding; According to multiple statistical analysis , value calculate and integrated appraise result, in the northwest and southwest of Yunnan, the traffic relatively low density, traffic engineering is relatively weak impact on environment, It is the area where a environme

主要的环境地质问题是:活动性断裂、地震带的地壳不稳定;崩塌、滑坡、泥石流及水土流失;地下岩溶塌陷、渗漏问题;基础岩体膨胀、胀缩土体、含盐层侵蚀变形和地下水的腐蚀危害;盆地软土问题;软弱岩体、碎裂、风化岩体稳定性较差;高寒地带公路、铁路建设的冻土冻融灾害问题;煤层瓦斯、涌水、地下采空区等隧道围岩不稳定问题;工程切坡、施工弃土及水库、湖泊生态地质环境保护问题;航道险滩、暗礁问题;渠化工程、码头等库岸再造问题;以及机场建设中的不稳定地基及地下水腐蚀性问题;同时,随着大通道建设的实施和完成,城镇建设的调整、人群居落的变化和耕地分布及结构的调整组合,都可能造成局部环境地质问题的突出等等。经多元统计分析数值计算、综合评价结果,滇西北、滇西南地区交通密度较低,交通工程对环境的影响程度较弱,是环境地质状况好的区域;有主要高原湖泊分布区的,包括昆明、个旧、文山的滇东南区域,环境地质状况较好;大姚、楚雄、篙明及会泽、昭通一镇雄的区域,即滇中北部中生界红层和滇东北岩溶区,环境地质状况中等;而包括保山、德宏、大理、临沧的滇西地区及景东一墨江以东、双柏一石屏一河口以西及东川一寻甸一曲靖地段的滇中一滇东地区,环境地质状况较差。云南国际大通道建设涉及全省区域,如何利用地质环境、实现可持续发展,就必须依赖于国际大通道建设与地质环境之间良性关系的建立。应本着对区域地质环境客观存在的科学认识原则、建设过程中环境效益优先的可持续发展原则、法制性原则、对大通道建设中环境地质的因地制宜及其可防治性原则。并且从组织管理、不同类型大通道、不同环境地质问题类型等方面,提出了对策措施。最后,提出了建立国际大通道建设与环境地质良性关系的宏观建议。

The comparative investigation of the characteristics of deformation and AE were conducted and the results are presented as followed: 1. The characteristics of rock AE are correlated to the strength, joints, cracks, and the size and hardness of crystalline grain. 2. The sequence of AE can be divided into four phases: beginning phase, tempestuousness phase, drop phase and dreariness phase. The loss and the duration of the phases are correlated to the rock character and flaws in the rock. 3. The AE rate characteristics are not almost concordant with the AE energy rate. 4. Besides the homogeneity, the strength of rock contributes the activity of AE. The higher the strength is, the lower the activity is. 5. There is a dreariness phase before the failure of most kinds of rock. 6. Whether the precursor is obvious is correlated to rock the character, and the precursor of AE rate is more apparent than the precursor of AE energy rate comparatively.

通过对比研究这六种不同岩石的变形和声发射特征发现,岩石声发射受到岩石强度、节理裂隙和晶粒软硬大小等的影响;岩石声发射过程存在初始区、剧烈区、下降区和沉寂区,各个阶段是否存在及持续时间与岩石强度、内部缺陷等有关;岩石的声发射事件率特征与能量率特征并不完全一致;岩石的声发射活性除了受其均匀性影响外,还受到岩石的强度影响,强度越小,声发射活性越强;大多数岩石破坏前存在一声发射沉寂区;岩石的破坏前兆是否明显跟岩性有关,相比较而言,岩石破坏时的声发射率前兆比声发射能量率前兆更为明显一些。

The study provided 2 kinds of finish systems which were pouring and anchoring rock-wool panel respectively. In general, galvanizing steel-meshwork using machine anchor can use all kinds of Rock-wool panel made in China. The interface mortar used in Rock-wool can prevent worker's hand from hurting and improve the water-proof capability and bonding intensity of rock-wool panel. The low-heat conductivity of polystyrene foaming granule paste improved the integer and anti-crack of system. The 2 kinds of rock-wool system all can resolve the current rock-wool panel applied difficulty in outer-wall external thermal insulation.

研究提出了现浇和锚固岩棉板2种涂料饰面构造做法,其中采用机械锚固热镀锌钢网施工可充分利用国产各类型岩棉板;岩棉板的界面砂浆处理可起到防止岩棉纤维扎手、增强岩棉板的防水性能和提高岩棉板与找平层的粘结强度的作用;聚苯颗粒的低导热系数过渡层提高了系统的整体性和抗裂性。2种构造做法经试验和工程试点证明均可解决目前国内岩棉难以应用在外墙外保温系统中的技术问题,具有优异防火性能的岩棉外保温系统可应用于任何类型的建筑中,在高层建筑和防火要求高的建筑中其优势更为明显。

This text pressed an on trial pedestal each zero partses to carry on a detailed calculation and the school pit to the liquid in introducing the background of the topic research and the foundation of the meaning:Pass to draw up towards experimenting the pedestal system principle diagram, explain the work principle of the system and manipulate a method;Pass the calculation to the system pressure,discharge, choose the oil pump,pipeline and valve door;Pass the calculation to deliver the calories to system, make sure the physical volume of the fuel tank and choose heating apparatus with spread a hot machine;Pass to spread a design of move the system to the pump station, choose to keep the strength that the gear cone wheel gear spread to move to combine a school to check stalk.

本文在介绍课题研究的背景及意义的基础上,对液压试验台各零部件进行了详细的计算和校核:通过对试验台系统原理图的拟订,说明了系统的工作原理和操纵方法;通过对系统压力、流量的计算,选择了油泵、油管和阀门;通过对系统发热量的计算,确定了油箱的体积并选择了加热器和散热器;通过对泵站传动系统的设计,选择了直齿圆锥齿轮传动并校核了轴的强度。

Through in the practice feeling about divulgement, vibration and synthesis operational performance of the pump and life of the key components and the pedestal and intact operating horary inside contact in whole set, try to look for one kind of reasonable and economical corrosion resisting stainless steel material of the pedestal and pump body,in the hope prolonging ZA200-315A and HC200-250A type stainless steels acid resisting pump whole set operation life.

通过实践摸索泵的泄漏、振动及泵综合使用性能和关键部件的寿命、底座寿命与整机完好运行时间的内在联系,试图寻找一种合理经济的耐腐蚀不锈钢底座及泵身材质,以期延长ZA200—315A型及HC200—250A型不锈钢耐酸泵的整机运行寿命。

This grinding machine processes the way adoption correspond type to whet to pare the way, the work piece install at turn round the work on the stage, turn round with the work pedestal, the emery wheel turns round at the same time, the path of the emery wheel to enter to depend turn round the work pedestal to follow the X direction moves the realization, top of bearings bore and top end face process good after, process with same emery wheel underneath of bearings bore and under carry the noodles, the work piece install once, with guarantee the accuracy.

此磨床的加工方式采用切入式磨削方式,工件安装在回转工作台上,随工作台回转,同时砂轮回转,砂轮的径向进给靠回转工作台沿 X 方向位移实现,上面的轴承孔及上端面加工好后,用同一砂轮加工下面的轴承孔及下端面,工件一次安装,以保证精度。

第2/500页 首页 < 1 2 3 4 5 6 7 8 9 ... > 尾页
相关中文对照歌词
Rock N' Roll
I Wanna Rock (Interstate Trafficking Remix)
Robot Rock
Rock Wit It
Just Like Me
I Rock, Therefore I Am
I Wanna Rock
Rock The Shocker
Planet Rock 2K (Down South Mix)
Planet Rock 2K (Original Version)
推荐网络例句

A carrier gas such as nitrogen is directed through line 20 and valve 22 to connect with line 26 and mix with the gas sample.

如氮气之类的载体通过管线20和阀22引入,与管线26相通,与气体样品混合。

But for the most part, knaves and parasites had the command of his fortune

然而支配他的家产的大多是恶棍和寄生虫。

For he that is now called a prophet, in time past was called a seer.

他们就往天主的人所住的城里去了。