英语人>网络例句>overcoating 相关的网络例句
overcoating相关的网络例句

查询词典 overcoating

与 overcoating 相关的网络例句 [注:此内容来源于网络,仅供参考]

Overcoating time Min:16 hours at 23℃;Max: 7 days.

重涂时间最小:16小时(23°C),最大:7天。

Overcoating time Min:24 hours at 23℃;Max: 7 days.

重涂时间最短:24小时(23℃);最长:7天。

Overcoating time Min: 16 hours,Max:2 days, at 23℃73.4

涂装时间 23度条件下,最小16小时,最大2天

Overcoating time Min: 16 hours at 23℃(73.4 ℉)?Max: 7 days

重涂时间最短:23℃时,16小时-最长:7天

Quartz overcoating protects the optics from the environment and allows cleaning without damage to their refective surface.

石英镀膜的光学器件可以防止环境对光学器件的损害,并且清洁时不破坏光学件的反射率。

Before overcoating thoroughly clean the surface exposed in contaminated environment by high pressure fresh water hosing and allow to dry.

若漆膜在使用期间暴露于污染环境,在涂漆前,须用高压淡水冲洗表面,任其自干。

Surface modification of up-conversion luminescence by overcoating with carboxyl groups and its characterization;2. The effects of concentration and adding methods of acrylic acid on the content of carboxyl groups on the magnetic microspheres surface were studied.

利用双层表面活性剂改性的Fe3O4磁流体为种子,通过乳液聚合法考察了苯乙烯或苯乙烯-丙烯酸对Fe3O4磁流体的包覆情况,并考察了丙烯酸浓度及加入时间对磁性微球表面羧基含量的影响。

Before overcoating, the surfaces exposed in polluted environment must be thoroughly cleaned by high pressure fresh water.

如重涂前施工表面受过污染,须用高压淡水冲净表面,任其自干后,再进行重涂。

Walls with mould should be washed with bleaching solution, followed by fresh water. Allow the surface to dry before overcoating.

若墙面霉菌滋生,须用漂白粉溶液清洗干净,彻底清除霉菌,并用清水冲洗干净,待表面干燥后,才可涂漆。

Followed by fresh water. Allow the surface to dry before overcoating.

净,彻底清除霉菌,并用清水冲洗干净,待表面干燥以后,方可涂漆。

第1/2页 1 2 > 尾页
推荐网络例句

As she looked at Warrington's manly face, and dark, melancholy eyes, she had settled in her mind that he must have been the victim of an unhappy attachment.

每逢看到沃林顿那刚毅的脸,那乌黑、忧郁的眼睛,她便会相信,他一定作过不幸的爱情的受害者。

Maybe they'll disappear into a pothole.

也许他们将在壶穴里消失

But because of its youthful corporate culture—most people are hustled out of the door in their mid-40s—it had no one to send.

但是因为该公司年轻的企业文化——大多数员工在40来岁的时候都被请出公司——一时间没有好的人选。