查询词典 overall design
- 与 overall design 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Finally, the design of latest twister is discussed based on axiomatic design. The overall scheme of the latest twister is given through zigzagging decomposition.
最后,在前述对公理设计的扩展性研究成果的指导下,进行新型捻线机的设计。
-
With respect to the burner design a "self-stabilizing combustion technology incorporating double primary air channel" developed jointly by HBC and Qinghua University has been adopted. This item of technology was awarded a China National Golden Prize for outstanding creative and inventive patents. The marked flame stability at low loads and excellent overall performance provided by the above-cited technology have advanced the design of high-capacity anthracite-fired boilers to a new level.
特别是在燃烧器设计中,采用了哈锅与清华大学联合开发研制的,并获得国家创造发明专利金奖的&双一次风通道自稳式燃烧器&,该燃烧器具有明显的低负荷稳燃特性和优良的综合性能,使大型无烟煤锅炉的设计达到了一个新水平。
-
The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.
上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。
-
The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.
内昆铁路水溪沟大桥,中心里程为DK608+393.00,该桥的设计方案有三个,通过技术、经济比较,采用4×32m预应力混凝土简支梁桥方案,桥梁全长149.5m,I级单线铁路,设计时速为120km/h,设计荷载为中活载。上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。
-
Main content including transfer and unit machine characteristic, development present situation and its direction, mill the Red East -75 tractors gear boxes body localization plane engine bed mechanism, headstock and this transfer and unit machine overall plan design, and to this engine bed unit clamp design.
主要内容包括组合机床的特点、发展现状及其方向,铣东方红%26mdash;75拖拉机变速箱体定位平面机床的机械结构、主轴箱及该组合机床总体方案设计,并对该机床专用夹具设计。
-
Body in accordance with the designer's own design ideas, from the part of the overall detailed design of the computer mouse and the realization of the idea of the process, as well as some of the designers thinking more in-depth (mainly focusing on how to make the computer mouse maze to find a more rapid end).
正文按照设计者本人的设计思路,从整体到部分详细地阐述了电脑鼠设计的构思和实现的过程,以及设计者的一些更为深入的思考(主要围绕如何使电脑鼠更为快速的找到迷宫终点)。
-
Longitudinal and transversal crossbeams play a significant role in connecting towers and making united action of overall structure in Three Gorges Project vertical ship lift. A reinforcement design for these beams is an important step in the design of civil structure of the towers.
三峡垂直升船机塔柱纵、横向联系梁在塔柱连接以及整体结构联合受力中起着非常关键的作用,梁的配筋设计是塔柱土建结构配筋设计的重要环节。
-
The system of drive are all driven by stepping motors.the machine system design includes every free degrees,computation of drive and transmission system .the third and four degree of freedom are performed by the feed screw having the spline of ball bearing which is design specially for robot .with the textual study,it can be believe the user will have an overall understanding to the way of thinking and steps of the machine system.
在机械系统设计上,对每个自由度驱动、传动系统进行了计算与校核,其中第三四自由度有专为机器人设计的带滚珠花键的丝杠来实现。通过本文的学习,相信使用者会对它的机械系统设计的步骤和方法有一定的了解。
-
The system of drive are all driven by stepping motors.the machine system design includes every free degrees,computation of drive and transmission system .the third and four degree of freedom are performed by the feed screw having the spline of ball bearing which is design specially for robot .with the textual study,it can be believe the user will have an overall understanding to the way of thinking and steps of the machine system.
在机械系统设计上,对每个自由度驱动、传动系统进行了计算与校核,其中第三四自由度有专为机器人设计的带滚珠花键的丝杠来实现。通过本文的学习,相信使用者会对它的机械系统设计的步骤和方法有一定的了解。关键词 SCARA机器人,谐波减速器,机械系统,丝杠
-
The presentation introduces conditions, features and difficulties in the recovery project of Shanghai Metro Line 4, by stating cons and pros of overall proposal of recovery design, the safeness of support and bracing structure for hyper deep foundation, influence of mid-river cofferdam on existing sound tunnel and hyper deep foundation, structural design selection for connection section of the mined tunnel, water-proofing option for hyper deep foundation in confined aquifer soil.
报告介绍了上海地铁4号线修复工程建设条件、特点和难点,陈述了对修复设计总体方案取舍、超深基坑支护结构安全度、江中围堰对完好隧道及超深基坑的影响、暗挖连接段的结构设计方案选择、处于承压含水层中的超深基坑的结构防水等内容。
- 推荐网络例句
-
In the negative and interrogative forms, of course, this is identical to the non-emphatic forms.
。但是,在否定句或疑问句里,这种带有"do"的方法表达的效果却没有什么强调的意思。
-
Go down on one's knees;kneel down
屈膝跪下。。。下跪祈祷
-
Nusa lembongan : Bali's sister island, coral and sand beaches, crystal clear water, surfing.
Nusa Dua :豪华度假村,冲浪和潜水,沙滩,水晶般晶莹剔透的水,网络冲浪。