查询词典 outlet water
- 与 outlet water 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
A method and apparatus for water degasification and distillation in an apparatus having a container (10) for a reservoir of water to be degassed and distilled, a boiler (12) adjoining the container and having a feed water conduit (22) connecting the container and boiler, a coiled tube condenser (27) within the container immersed in the water therein, the condenser coil having a vertically disposed longitudinal axis, a second conduit (24) in the boiler connecting the space above the water level therein to the inlet of the condenser so that steam flows from the boiler to the condenser, an outlet (29) on the condenser extending through a container wall for discharging the condensed steam as degassed distilled water, a heater (13) in the boiler for heating the water therein, a motor driven stirrer (101) axially of the coiled tube condenser and an ozone generating device (120) in the boiler for purifying the steam.
一种用于水脱气和蒸馏的方法和设备,该设备包括一容器(10),该容器有一用于盛放待被脱气和蒸馏的水的贮池;还包括一与所述容器相连接的、其供水管(22)连接容器和沸腾器的沸腾器(12);一在所述容器内、浸在其内的水中的线圈式管状冷凝器(27),该冷凝器线圈有一竖直放置的纵向轴线;一在沸腾器内连接其内的水面上的空间与冷凝器的入口以使蒸气从沸腾器流至冷凝器的第二管道(24);一在冷凝器上延伸穿过容器壁将经脱气和蒸馏的水作为已冷凝的蒸气排出的出口(29);一在沸腾器内用于加热其内的水的加热器(13);一与线圈式管状冷凝器同轴的马达驱动搅拌器(101)以及一在沸腾器内纯化蒸气的臭氧发生器(120)。
-
It is showed that the negative pressure increased with the lengthening of pipe outlet (ranging from 177 to 227 mm), and the siphonage and washing effect were enhanced. The water consumption reduced from 6 L to 5 L and the amount of sewage water decreased, when adjusting the length of pipe outlet to be the best value (227 mm).
结果表明,虹吸管出口段长度为177~227mm时,虹吸过程的负压值随长度增加而升高,虹吸作用随之增强、冲洗性能趋好;长度达227mm时,可使坐便器用水量从6L降至5L,所排污水量随之减少。
-
Vessel is isolated from air, is filled with running cooling water, and at one side it communicates with pump which is connected with pipeline, and at other side it communicates with outlet pipe 6 having its end located below pump which ensures running of cooling water as through syphon from pump to outlet pipe and into surrounding water basin without consuming any outside energy.
船只是孤立的,从空气,充满运行的冷却水,并在一方,它沟通与泵这是与管道,并在其他方面,它沟通与出水管6月底,其位于下面的泵,确保运行的冷却水作为通过虹吸从泵出水管和到周围水流域没有消费任何外来能源。
-
The invention belongs to the fluid measuring technical field and relates to an oil, gas and water three-phase oil well continuous gauging device, which comprises a high-efficient gas-liquid separator; the high-efficient gas-liquid separator is connected with an oil, gas and water three-phase inflowing port; a gas phase outlet of the oil, gas and water three-phase inflowing port is connected with a gas phase measuring pipeline; a gas path temperature sensor, a gas path pressure sensor and a gas path endocone flowmeter with high-frequency differential pressure transmitter are arranged on the gas phase measuring pipeline; a liquid phase outlet of the high-efficient gas-liquid separator is connected with a liquid phase measuring pipeline; a liquid path Coriolis mass flowmeter and a liquid path endocone flowmeter are arranged on the liquid phase measuring pipeline; and the cross section of the pipeline for mounting the liquid path Coriolis mass flowmeter is more than the cross section of the pipeline for mounting the liquid path endocone flowmeter.
本发明属于流体测量技术领域,涉及一种油、气、水三相油井连续计量装置,包括高效气液分离器,高效气液分离器与油、气、水三相流入口相连,其气相出口与气相测量管路相连,在气相测量管路上装有气路温度传感器、气路压力传感器、带有高频差压变送器的气路内锥流量计;高效气液分离器的液相出口与液相测量管路相连,在液相测量管路上装有液路科氏质量流量计和液路内锥流量计,安装液路科氏质量流量计的管路的截面积大于安装液路内锥流量计的管路的截面积。
-
In this paper, the 3-D finite element relocating mesh method is used to calculate the temperature field and the thermal creep stress field of spillway dam and mid level outlet dam in certain roller compacted concrete gravity dam, sensitivity analysis have been down with different parameters, such as placing temperature, the location of cooling pipe, cooling temperature, time for water supply, ascended-layer of concrete, intermissive time and different placing time, and the commendatory construction scheme have been put forward in such analysis; according by the test result on the two scheme of concrete aggregate combination (basalt as coarse aggregate and limestone as fine aggregate, basalt as coarse aggregate and basalt as fine aggregate), simulation analysis on temperature field and thermal creep stress field of the commendatory construction scheme have been down, and analysis have also been down on temperature field and thermal stress field of the two different aggregate combination, the result indicates that the spillway dam and mid level outlet dam which adopted these two aggregate combination can both satisfy the require of design crack resistance in concrete, furthermore limestone as fine is better than basalt as fine aggregate; the effect of summer water storage and winter water storage on the temperature field and thermal stress field have been analyzed, comparing with winter water storage, in summer water storage scheme the maximum tensile stress at abnormal concrete in upstream fill is decreased by 0.1~0.3MPa and there are no evidence change of the maximum tensile stress at other parts, which indicate that summer water storage is avail for the crack resistance of upstream fill; according to the simulation calculating result and comparing temperature simulation calculating results and temperature controlling measures of some similarity projects both completed and construction, synthesis appraise have been carried to the design temperature controlling measures of dam, and the temperature controlling measures of this project have been brought forward, all these have great reference value on the design of temperature controlling measures and the optimization of the construction scheme.
本文采用三维有限元浮动网格法仿真计算程序,对某碾压混凝土重力坝的溢流坝段和中孔坝段分别进行了三维有限元温度场和温度徐变应力仿真计算分析,对浇筑温度、冷却水管的布置方式、冷却水温、通水时间、浇筑升程和间歇时间、不同开始浇筑日期等参数进行了敏感性分析,在此基础上提出了推荐的施工方案;根据两种骨料方案(玄武岩粗骨料+灰岩细骨料方案;玄武岩粗骨料+玄武岩细骨料方案)的混凝土性能试验研究成果,对推荐的施工方案进行了温度场和温度徐变应力仿真计算,并对比分析了两种不同骨料情况下的温度场和温度应力,结果表明溢流坝段及中孔坝段采用上述两种骨料均能满足混凝土的抗裂设计要求,且灰岩细骨料优于玄武岩细骨料;计算分析了夏季蓄水和冬季蓄水对坝体温度场和温度应力的影响,夏季蓄水方案与冬季蓄水方案相比,坝体上游变态混凝土区域最大拉应力小0.1~0.3MPa,其他部位最大拉应力无明显变化,夏季蓄水对坝体上游面混凝土的抗裂有利;根据仿真计算成果并通过比较国内一些已建和在建的类似工程的温度仿真计算成果及采取的温控措施,对大坝的设计温控措施进行了综合评价,并提出了该工程的温控措施,对温控设计和优化施工方案具有重要参考价值。
-
In the invention, the water outlet of a circulating pump is connected with the water inlet of a solar energy collector; a water check valve is arranged on a water circulating pipe between the water outlet of the circulating pump and the water inlet of the solar energy collector; the water outlet of the solar energy collector and the water outlet of a water supply pump are connected with the water inlet of a heating coil; the water inlet of the circulating pump and the water inlet of a drain pump are connected with the outer outlet of the heating coil; the water inlet of the water supply pump is connected with the water outlet of a water storage tank; and the water outlet of the drain pump is connected with the water inlet of the water storage tank.
本发明的循环水泵的出水口与太阳能集热器的入水口连接,水止回阀设置在循环水泵的出水口与太阳能集热器的入水口之间的水循环管路上,太阳能集热器的出水口和补水泵的出水口都与加热盘管的入水口连接,循环水泵的入水口和泄水泵的入水口都与加热盘管的出水口连接,补水泵的入水口与储水箱的出水口连接,泄水泵的出水口与储水箱的入水口连接。
-
Traditional technology: oil separation coagulation-flotation and bio-chemistry no longer meets the requirement of outlet water quality and the sewage integration discharge standard with the development of production technology; so many people are engaging in exploring new technologies to treat oil-containing sewage.
随着生产工艺的发展、出水水质要求的提高以及污水综合排放标准的日益严格,处理含油废水的隔油-絮凝气浮-生化&老三套&工艺急需改进,人们正在致力于研究新的含油废水处理技术。
-
First, by the allocation of irrigation water directly into the ditch outlet Xiaqi, achieve no water loss, greatly improve the utilization of water; are two irrigation systems, replace the pipe with water furrow, not square, and the right to re-use, reducing the irrigation investment; Three is the use of the gate with the outlet opening to adjust a constant and accurate control of flow into the trench plot, for different soil and different groove specifications Xiaqi can greatly improve irrigation uniformity; four gates are porous pipe irrigation system for the flow tubes, and the blind to cross the flow tube as compared to the wall can reduce the work under stress, and reduce the damage to the opportunity to prolong the service life of thin-walled tube; are five gates to facilitate the installation of irrigation systems, pipes, and, upon request, to fight孔安outlet assembly to ensure the accuracy of positioning with the outlet.
一是灌溉水经配水口直接进入沟畦,实现无输水损失,极大地提高了水的利用率;二是管灌溉系统代替配水垄沟,不占地,且右重复使用,降低了灌溉投资;三是利用配水口的闸板开度来调节准确恒定地控制进入沟畦的流量,适用于不同土质和规格不同的沟畦,可大大提高灌水均匀度;四是闸管灌溉系统为多孔出流管,与等过流量的盲管相比,可降低管壁承受的工作压力,并减少受损机会,从而延长薄壁管的使用寿命;五是闸管灌溉系统安装方便,并可根据要求打孔安装配水口,确保配水口定位的准确性。
-
The research results show that the steam inlet pressure and water inlet temperature are the main factors which affect the lifting-pressure performance; the steam injector have the characteristics of self-adaptive outlet pressure and constant outlet flow rate; the theoretical maximum lifting-pressure coefficient calculated could be high as 14 and the experimental value is 3.0, which could be high as 1.5 even if the water inlet temperature is high as 95℃. The noise of steam injector could be induced from 80db to 50db.
研究出该升压技术具有定流量特性、出口压力具有自适应特性,计算得出的理论极限升压能力的升压系数可达14,实验得出的最大升压能力为进口蒸汽压力的3倍,进口水温达到95℃时其升压能力还可达到1.5倍,噪音从目前的80db减少为50db。
-
ABSTRACT : The effects of handling the salty acid red B colorant outlet water by electrochemical method and the influence of handling process in different PH, different current intensity, different electrolyse time and in different pole distance are researched on.
利用电化学法对高含盐的酸性红B染料废水进行了处理研究,考察了溶液pH、电流强度、电解时间及其不同极间距对处理结果的影响。
- 推荐网络例句
-
Do you know, i need you to come back
你知道吗,我需要你回来
-
Yang yinshu、Wang xiangsheng、Li decang,The first discovery of haemaphysalis conicinna.
1〕 杨银书,王祥生,李德昌。安徽省首次发现嗜群血蜱。
-
Chapter Three: Type classification of DE structure in Sino-Tibetan languages.
第三章汉藏语&的&字结构的类型划分。