英语人>网络例句>ore 相关的网络例句
ore相关的网络例句
与 ore 相关的网络例句 [注:此内容来源于网络,仅供参考]

The mineral processing simulation software aims to realize the simulation calculation of different ore dressing process and is a powerful tool for design and optimization of ore dressing process.

选矿流程模拟软件旨在实现各种选矿过程的模拟计算,以作为选矿过程设计与优化的强有力工具。

At the first stage, gold concentrate is produced by ore dressing. We can produce 5 tons of gold every year by daily dressing 4550 tons of ore.

首先我们从采矿石中选出金精矿,公司选矿能力为每天4550吨,矿产金年产量为5吨。

The ore-dressing production process is a complex industry process, and cost control deals with many technique indices, so the cost control of ore- dressing production process is difficult to be implemented by the routine approaches.

目前国内许多选矿企业的主要产品价格已与国际市场价格接近,如何降低生产成本,提高市场竞争力,这是关系到选矿企业兴衰的重大问题。

In addition, the industrial chain has developed from single mining and ore dressing into integration of exploration, mining and ore dressing.

全球矿业持续经历了几年的疯狂繁荣,以至于这一行业越来越高度集中,产业链亦从单一的矿山采选发展到探采选一体化。

In some cases, when the ore dressing machinery factory the size of large ore blocks is also a great degree, in order to reduce the paragraphs broken ratio, or the product in order to get a finer granularity, can also be broken processes, Sec.

在个别情况下,当选矿机械厂的规模很大,原矿块度也很大,为了减少各段破碎比,或者为了得到更细的产品粒度,也可用四段破碎流程。

The result shows clearly that a production management was controlled thus the indexes of ore loss and dilution ratio were reduced and the ore dressing recovery percentage was raised and eco...

试验结果表明:通过生产过程管理控制,降低了采矿贫化率和采矿损失率,提高了选矿回收率,增加了矿山企业的经济效益

Mt Keith ore dressing plant is casting antenatal 5 years not exceptional also, the ore dressing plant is average of nickel reclaim rate just 60%.

Mt Keith选矿厂在投产前5年也不例外,选矿厂平均镍的回收率刚好60%。

Gold metallogenesis in the level of ore belt, ore deposit and orebody are controlled by multi-order tectonic system resulted from orogenesis.

金矿床成矿作用从矿带、矿床到矿体甚至矿脉均受到不同级别的构造变形控制。

In order to cut down the cost and pursue economy of scale, every enterprise chartered big vessels to transport a great deal of iron ore when ordering. However, the massive stock occurred because it far more overpast the demand of steel enterprises throughput. Next, the volumes stock bring on abundant cost of stockpile, since it can not be distributed in time due to limited capacity of transportation. Furthermore, there is a big pressure to railway authority to distribute the iron ore.

钢铁企业订购铁矿石时,为降低成本、追求规模效益,一般采取大船进行海运运输,而一次的运量可能大大超过了企业近期的生产能力,大量的库存便产生了;其次,如此大量的矿石集中到港,无法通过疏运能力的"瓶颈",在港口堆场堆存又产生了大量的堆存费用;此外,大批量的疏运对铁路部门也产生了压力。

In order to find new pegmatite Nb-Ta ore-deposit, it is very important practical-significances to ascertain the host structure characteristics and the relations between the tectonic epochs and ore-forming.

通过查明矿床的容矿构造特征以及构造期次与成矿的关系,对寻找新的铌钽伟晶岩矿床具有重要的实践意义。

第19/228页 首页 < ... 15 16 17 18 19 20 21 22 23 ... > 尾页
相关中文对照歌词
Oré
Pronto
Praise Ye Jah
Ego
Iron Ore Betty
Kurenai
Full Attention
City Lights
69
I'm Holding You
推荐网络例句

Listen,point and check your answers.

听,指出并且检查你的答案。

Warming needle is one of effective treatment methods for knee arthralgia aggravated by cold,and it is simple,safety,so it should be developed in clinical acupuncture and moxibustion extensively.

但以本院科针灸门诊在2005年1月—2006年6月期间共收治膝痛患者100余例,经过临床的诊断后,其中施以温针治疗的48例,疗效显著,报道如下。1临床资料本组病例48

Some known methods of remnant pump detection and automatic laser shut-down use communications, such as an OSC.

一些已知的残余泵浦检测和自动激光关断的方法利用诸如OSC的通信。