英语人>网络例句>ore bridge 相关的网络例句
ore bridge相关的网络例句

查询词典 ore bridge

与 ore bridge 相关的网络例句 [注:此内容来源于网络,仅供参考]

Vehicle-bridge vibration system can be divided into two subsystems at the interface of wheel and bridge, one for the bridge and the other for the vehicle. The vehicle-bridge coupling relationship, including the geometrical compatibility condition and the static equilibrium condition between vehicle and bridge, is established.

将整个车桥系统在车轮和桥梁接触处划分为车辆、桥梁两个子系统,通过车轮和桥梁接触点处位移协调条件和力的平衡条件建立了车-桥系统动力方程。

The different methods for establishing the equations of vehicle-bridge system are summarized and assessed. The vehicle-bridge coupling relationship, including the geometrical compatibility condition and the static equilibrium condition at the interface of wheel/rail, is established. The forces on the vehicles, which coming from bridge deflection and track irregularity, and those on the bridge, which coming from vehicle deflection, are given. Then, the governing equations of vehicle-bridge system are setup.

提出了车桥系统运动方程求解的分离迭代技术和相应的数值解法:对建立车桥系统方程的各种不同方法进行归纳与总结;详细建立了车桥耦合关系,即轮轨接触点处的几何相容条件和静力平衡条件;给出了由于桥梁位移和轨道不平顺而引起的作用在车辆上的轮轨力,以及由于车辆位移引起的作用在桥梁上的轮轨力。

This paper applies a software ANSYS to calculate the bridge of Kazi gulf in three-dimensional entity model, compute the left bridge under the initial and the gravity before gather together, carry on left bridge and the whole bridge'mode analyses, finally analyze the left bridge under artificial seismic waves.

本文应用大型有限元软件ANSYS 对卡子湾大桥三维实体模型进行分析,计算左桥合拢前在预应力和重力组合作用下的应力状况,进行左桥和整桥的模态分析,最后分析左桥在人工地震波作用下的动力时程反应。

Given two bridge-builders, a man and a woman, given a certain bridge to be built, and given as always the unchangeable laws of mechanics in accordance with which this special bridge and all other bridges must be built, it is simply inconceivable that the preliminary instruction given to the two bridge-builders should differ in quantity, quality, or method of presentation because while the bridge is building one will wear knickerbockers and the other a rainy-day skirt.

假定分别有男女两位桥梁建造者,要去建造指定的一座桥,在建造这一独特的桥及其它一般的桥的力学规律总是不变的情况下,简直不可想象,男女建造者所受的基本教育应有所不同;更不可想象,只是因为在施工时,一个穿灯笼裤,另一个穿防雨裙,而必须让他们在质量、数量及教学方法上接受不同的教育。

I make "419 roads " going to , passing round north tetracylie sees the "Beijing National Stadium" time be probably 17:40 since traffic control , possessions run by all passing round of the "Beijing National Stadium" north bus,this moment the tetranuclear people of north is not many ,"the intelligent bridge circles in the air from safety" to "strengthening neither having many person bridge " inside, because of but the personnel has controlled face to face ,"the intelligent bridge circles in the air to "strengthening only when the people who holds a ticket can enter secondary safety" bridge " area, Entering mansion , our thereby having stood for one in a nearest fault street overline bridge will be, what all fails to see basically.

还是决定去鸟巢附近看看,由于交通管制,所有走鸟巢北边的公交全绕行,我做419过去的,绕行北四环看到鸟巢大概是17:40,这时候北四环人还不是很多,从安慧桥到健翔桥里面也没什么人,但是对人员也管制了,只有持证的人可以进入安慧桥到健翔桥区域从而进入场馆,我在最近的一个天桥站了一会,基本什么都看不到

For the steel truss girder with abroad \\\"bridge crane bar assembled Law,\\\" the level of technology and equipment as a result of the limited duration of its long, far from being able to meet China\\\s bridge construction project as requested in the analysis of large-span suspension bridge mountain girder erection difficulties under the premise that after the election raised more than Aizhai Bridge \\\"self-cross-cable crane swing shift\\\" program to set up the main truss, which is mountainous suspension bridge girder erecting another major innovation.

对于钢桁梁,用国外的"桥面吊机杆件拼装法",由于工艺和设备水平所限其工期长,远不能满足中国桥梁建设工期的要求,在分析山区大跨悬索桥主梁架设困难的前提下,经过多方案比选提出矮寨大桥"自行式跨缆吊机荡移"架设主桁方案,这是山区悬索桥主梁架设的又一个重大的创新。

Hou Kong area inside the formation transportation road and bridge network, Shantou Bay Bridge, Stone Bridge, the bridge Hou Kong, such as 5 cross the bridge crossing the river, the Shenzhen-Shantou Expressway in the eastern section of this starting point, to wear 324 national territory and, Nanbin Lu, Lei Guang Road, Pu River Road, East Road, as well as Australia, and other trunk roads criss-crossing River Road, the whole region to achieve concrete Every Village Road.

濠江区境内路桥交通形成网络,汕头海湾大桥、石大桥、濠江大桥等5座大桥跨海过江,深汕高速公路东段在此起点,324国道穿境而过,南滨路、磊广公路、河浦大道、澳东公路以及河中路等主干道纵横交错,全区实现村村通水泥公路。

Broken Bridge of Miaoli original completion in 1907, the bridge with red brick structure which was the arch construction, the bridge deck from the ground 50 meters, the highest mountain railway bridge, was Taiwan's biggest railway bridge, Which was known as the best railway in the art in that time.

苗栗断桥原来完工於1907年,桥身用红砖块搭建而成的拱形建筑,桥面距地面有50公尺,是山线铁路中最高的桥梁,为当时台湾铁路最大的拱桥,在当时还被称为台湾铁路中的艺术极品。

For the steel truss girder with abroad \\\"bridge crane bar assembled Law,\\\" the level of technology and equipment as a result of the limited duration of its long, far from being able to meet China\\\s bridge construction project as requested in the analysis of large-span suspension bridge mountain girder erection difficulties under the premise that after the election raised more than Aizhai Bridge \\\"self-cross-cable crane swing shift\\\" program to set up the main truss, which is mountainous suspension bridge girder erecting another major innovation.

对于钢桁梁,用国外的&桥面吊机杆件拼装法&,由于工艺和设备水平所限其工期长,远不能满足中国桥梁建设工期的要求,在分析山区大跨悬索桥主梁架设困难的前提下,经过多方案比选提出矮寨大桥&自行式跨缆吊机荡移&架设主桁方案,这是山区悬索桥主梁架设的又一个重大的创新。

Xianju Bridge cents at Nim Xianju rural village, 20, from the county seat, is the largest wooden Taishun span arch bridge, but also Danyan arcade-style wooden bridge, around a green mountains and blue waters, just next to the bridge Xianju a new cement A bridge connected the county seat of the district roads, although a little Sha Fengjing, but to enjoy together, not really a new hi Yan Jiu.

仙居桥美分,至稔仙居县农村, 20岁,来自县城,是全球最大的木制泰顺跨径拱桥,而且还Danyan街机风格的木制桥梁,围绕着绿色群山和蓝色大海,旁边的一个新的桥梁仙居水泥桥连接县城区道路,虽然有点沙枫泾,但享受在一起,不是一个真正的新的高科技闫久。

第6/500页 首页 < ... 2 3 4 5 6 7 8 9 10 ... > 尾页
相关中文对照歌词
Oré
Pronto
Praise Ye Jah
Ego
London Bridge Is Falling Down
Iron Ore Betty
Kurenai
Full Attention
City Lights
69
推荐网络例句

Listen,point and check your answers.

听,指出并且检查你的答案。

Warming needle is one of effective treatment methods for knee arthralgia aggravated by cold,and it is simple,safety,so it should be developed in clinical acupuncture and moxibustion extensively.

但以本院科针灸门诊在2005年1月—2006年6月期间共收治膝痛患者100余例,经过临床的诊断后,其中施以温针治疗的48例,疗效显著,报道如下。1临床资料本组病例48

Some known methods of remnant pump detection and automatic laser shut-down use communications, such as an OSC.

一些已知的残余泵浦检测和自动激光关断的方法利用诸如OSC的通信。