英语人>网络例句>ore bridge 相关的网络例句
ore bridge相关的网络例句

查询词典 ore bridge

与 ore bridge 相关的网络例句 [注:此内容来源于网络,仅供参考]

Should it be found necessary for the Contractor to move one or more loads of Constructional Plant,machinery or pre一constructed units or parts of units of work over part of a highway or bridge,the moving whereof is likely to damage any highway or bridge unless special protection or strengthening is carried out,then the Contractor shall before moving the load on to such highway or bridge give notice to the Engineer or Engineers Representative of the weight and other particulars of the load to be moved and his proposals for protecting or strengthening the said highway or bridge.

30.2如承包人必须经部分公路或桥梁一次或多次运送建筑设备、机械或工程预制件或预制部件,如不采取特殊保护和加固措施,此种运送很可能损坏公路或桥梁,承包人运送货物通过此公路或桥梁前必须通知工程师或工程师代表,告之运送货物的重量及其他具体情况,以及其拟对上述公路或桥梁采取的保护和加固措施。

Should it be found necessary for the Contractor to move one or more loads of Constructional Plant, machinery or pre-constructed units or parts of units of work over part of a highway or bridge, the moving whereof is likely to damage any highway or bridge unless special protection or strengtheningis carried out, then the Contractor shall before moving the load on to such highway or bridge give notice to the Engineer or Engineer's Representative of the weight and other particulars of the load to be moved and his proposals for protecting or strengthening the said highway or bridge.

30.2 如承包人必需经部分公路或桥梁一次或多次运送建筑设备、机械或工程预制件或预制部件,如不采取特殊保护和加固措施,此种运送很可能损坏公路或桥梁,承包人运送货物通过此公路或桥梁前必须通知工程师或工程师代表,告之运送货物的重量及其他具体情况,以及其拟对上述公路或桥梁采取的保护和加固措施。

Should-it be found necessary for the Contractor to move one or more loads of Constructional Plant , machinery or pre-constructed units or parts of units of work over part of a highway or bridge , the moving whereof is likely to damage any highway or bridge unless special protection or strengthening is carried out , then the Contractor shall before moving the load on to such highway or bridge give notice to the Engineer or Engineer's Representative of the weight and other particulars of the load to be moved and his proposals for protecting or strengthening the said highway or bridge .

如承包人必须经部分公路或桥梁一次或多次运送建筑设备、机械或工程预制件或预制部件,如不采取特殊保护和加固措施,此种运送很可能损坏公路或桥梁,承包人运送货物通过此公路或桥梁前必须通知工程师或工程师代表,告之运送货物的重量及其他具体情况,以及其拟对上述公路或桥梁采取的保护和加固措施。

2Should it be found necessary for the Contractor to move one or more loads of Constructional Plant, machinery or pre-constructed units or parts of units of work over part of a highway or bridge, the moving whereof is likely to damage any highway or bridge unless special protection or strengthening is carried out, then the Contractor shall before moving the load on to such highway or bridge give notice to the Engineer or Engineer's Representative of the weight and other particulars of the load to be moved and his proposals for protecting or strengthening the said highway or bridge.

30.2 如承包人必需经部分公路或桥梁一次或多次运送建筑设备、机械或工程预制件或预制部件,如不采取特殊保护和加固措施,此种运送很可能损坏公路或桥梁,承包人运送货物通过此公路或桥梁前必须通知工程师或工程师代表,告之运送货物的重量及其他具体情况,以及其拟对上述公路或桥梁采取的保护和加固措施。

Recently, another concept for measuring the bridge frequencies, referred to as the indirect approach was proposed. The main idea of the indirect approach is to extract the bridge frequencies indirectly from the dynamic response recorded for a vehicle during its passage over the bridge, rather than from that recorded for the bridge.

最近,一种被称为桥梁频率间接量测法的新概念被提出,此一量测法之主轴为,间接地由车辆於通过桥梁期间之动力反应中撷取桥梁频率,而不是由桥体的动力反应中撷取之。

Guangzhou on July 2 Shijiaowei held Luoxi Bridge special maintenance expert appraisal programme will reinforce the three issues of "full proof": First, there are some diseases and Luoxi Bridge may need to repair or reinforced; Second, to take the necessary traffic control measures passage Luoxi Bridge traffic control; Third, it is necessary to speed up the Luoxi bridge building.

广州市交委于7月2日召开了洛溪大桥专项维修加固方案专家论证会,对三个问题进行了&充分论证&:一是洛溪桥存在一些病害和隐患,需要维修或加固;二是需要采取必要的交通管制措施,控制通行洛溪桥的交通量;三是要加快洛溪新桥的建设。

On the basis of construction practice,the project of erecting a prefabricated highway steel bridge on an existing bridge to temporarily strengthen the dangerous bridge to ensure the safe passage of special vehicles is proposed in the paper,with the specific structural forms of the steel bridge,and its inlet and outlet designed.

以实例为背景,为保障特种车辆通行,提出了在原桥上架设装配式公路钢桥的临时加固危桥方案。

Ethnic style bridge sub-hundred strong, large and medium-sized bridges in the country's largest gradient Jiang Jian斜桥, silver jade lion雕栏build bridges, the Rainbow Bridge飞架the air, the moon隽秀elegant bridge ...... a single seat style a bridge, into the classical style and modern style, with macro macro纤纤Daguan silk in one show, Duyun result as a "bridge museum."

民族风格浓郁的百子古桥、全国大中型桥梁中斜度最大的剑江斜桥、玉砌雕栏的银狮桥、凌空飞架的彩虹桥、清雅隽秀的月亮桥……一座座风格独具的桥梁,融古典情调与现代风格、宏宏大观与纤纤绢秀于一体,都匀因之被誉为&桥梁博物馆&。

According to the construction course and finished dead state of the inclined tower cable-stayed bridge without back stay at Tongling Road in Hefei and combining the modern theory and method of the bridge construction control mentioned in this paper, established a space model by large-scale general finite element software ANSYS. It can obtain some valuable result by emulating analysis of the bridge which is under the construction course and finished dead state. It can provide an instruction for the Tongling Road bridge with the result and construction job site monitoring data.

文中根据合肥市铜陵路预应力混凝土无背索斜塔斜拉桥的具体施工过程和成桥状态,结合文中介绍的现代桥梁施工控制理论和方法,运用大型通用有限元软件ANSYS建立了三维空间模型,对该桥进行了施工过程和成桥状态下的结构仿真模拟分析,将模拟计算结果与施工现场振动频率法索力测试数据和分析结果相结合,为铜陵路无背索斜塔斜拉桥拉索张拉施工提供指导,及时调控,确保了该桥在成桥后线形美观,受力性能满足要求。

Based on the differences between the design value and the survey of the bridge deck elevation in constructing the pre-stressed and so on working condition, the model parameters are identified by ANN, and the beam camber of different sections are given. The results demonstrated that the ANN is efficient and the theoretical results fit well with that of forecasting the beam camber in construction.In this thesis, aim to the beam axis shape be exactitude for design, the internal force of the beam be appeased by design request, the concept of modem cybernetics is applied, At the same time, the effecting parameter has collected. The paper build the ANN model in predicting the beam camber an construction and discuss indetail the extraction of inputting nodes information when quoting the fundamental principle of ANN model and introducing research process of the improved BNN. According to them, ANN is applied in the construction control of prestressed concrete continuous bridge. It is successful for used in the No. 4 bridge of Xiangfan bridge over-crossing Hanriver brideg. To predict the construction camber of by ANN method is useful and effective.

本文以大桥成桥线形满足设计要求和成桥内力控制在设计容许范围内为目的,运用现代控制理论的思想,引用神经网络基本原理,详细介绍BP神经网络的研究过程,从而建立预应力混凝土连续梁桥施工预拱度的神经网络模型,并详细讨论了模型的神经网络结点信息的提取,在工程实例的基础上进行了数值计武汉理工大学硕士学位论文算,数值表明,将神经网络应用于预应力混凝土连续梁桥施工控制,获得了满意的结果,在预应力混凝土连续梁桥施工控制技术研究方面,具有方便有效、精度高的优点,具有良好的应用前景。

第18/500页 首页 < ... 14 15 16 17 18 19 20 21 22 ... > 尾页
相关中文对照歌词
Oré
Pronto
Praise Ye Jah
Ego
London Bridge Is Falling Down
Iron Ore Betty
Kurenai
Full Attention
City Lights
69
推荐网络例句

Listen,point and check your answers.

听,指出并且检查你的答案。

Warming needle is one of effective treatment methods for knee arthralgia aggravated by cold,and it is simple,safety,so it should be developed in clinical acupuncture and moxibustion extensively.

但以本院科针灸门诊在2005年1月—2006年6月期间共收治膝痛患者100余例,经过临床的诊断后,其中施以温针治疗的48例,疗效显著,报道如下。1临床资料本组病例48

Some known methods of remnant pump detection and automatic laser shut-down use communications, such as an OSC.

一些已知的残余泵浦检测和自动激光关断的方法利用诸如OSC的通信。