查询词典 one point set
- 与 one point set 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Thesis and mainly discuss the following problems:What we mainly discussed in the second chapter as follows:(1) S1,S2 are sets of symmetric orth-symmetric matrices;(2) S1,S2 are sets of bisymmetric matrices;(3) S1,S2 are sets of anti-symmetric orth-anti-symmetric matrices;(4) S1,S2 are sets of bi-anti-symmetric matrices;(5) S1 is the set of symmetric orth-symmetric matrices, S2 is the set of anti-symmetric orth-anti-symmetric matrices;(6) S1 is the set of bisymmetric matrices, S2 is the set of bi-anti-symmetric matrices;(7) S1 is the set of anti-symmetric orth-anti-symmetric matrices, S2 is the set of symmetric orth-symmetric matrices;(8) S1 is the set of bi-anti-symmetric matrices, S2 is the set of bisymmetricmatrices;On the base of studying the basic properties of the matrices, the expression of solutions and some numerical examples are presented.
本文第二章将主要就上述问题讨论如下几种情况: 1.S_1,S_2为对称正交对称矩阵; 2.S_1,S_2为双对称矩阵; 3.S_1,S_2为反对称正交反对称矩阵; 4.S_1,S_2为双反对称矩阵; 5.S_1为对称正交对称矩阵,S_2为反对称正交反对称矩阵; 6.S_1为双对称矩阵,S_2为双反对称矩阵; 7.S_1为反对称正交反对称矩阵,S_2为对称正交对称矩阵; 8.S_1为双反对称矩阵,S_2为双对称矩阵。
-
Armour rods (to be installed in suspension clamps) Parallel clamps Sub-Total, items 4.1-4.7 OTHER HARDWARE Counterweights for jumper or suspension insulator strings, including necessary device for attachement 50 kg 100 kg Sub-total, item 5.1 – 5.3 SPARES Insulator Units Type U160 Type U210BS Hardware for Conductor ACSR-BISON Complete set of hardware and fittings for suspension string Complete set of hardware and fittings for tension string Complete set of hardware and fittings for jumper string Complete set of hardware and fittings for transposition string Extra suspension clamps Extra tension clamps Extra tension joints Extra repair sleeves Extra vibration dampers Extra armour rods Extra spacers: for span for jumper alternatively spacer dampers Hardware for Earthwire 7 No. 6 AWG Complete suspension set Complete tension set Vibration dampers, Stockbridge type Extra tension clamps Extra tension joints Extra vibration dampers Extra parallel clamps Extra armour rods Hardware for Earthwire 7 No. 6 AWG Complete suspension set Complete tension set Vibration dampers, Stockbridge type Extra tension clamps Extra tension joints Extra vibration dampers Extra parallel clamps Extra armour rods Sub-Total, items 6.1-6.4 Sub-total, Items 1.4, 2.7, 3.8, 4.8, 5.4 and 6.5 Transfer to Summary, Schedule AS-1
装甲棒 平行夹具小计,项目4月1号至4月7号其他硬件重物跳线或中止绝缘子串,包括必要的设备attachement 50公斤 100公斤小计,项目5月1号至5月3号备件绝缘子单位型U160 类型U210BS 硬件导体钢芯铝绞线,拜森一套完整的硬件和配件的暂停字符串一套完整的硬件和配件的紧张字符串一套完整的硬件和配件的跳投字符串一套完整的硬件和配件的转字符串额外的悬浮夹额外的紧张局势夹额外的紧张关节额外的修理袖子额外的振动阻尼器额外的装甲棒额外的间隔:为跨度跳线或者间隔减震器硬件Earthwire 7特设工作组第6号完整的悬挂设定一套完整的紧张局势振动阻尼器,斯托克型额外的紧张局势夹额外的紧张关节额外的振动阻尼器额外的平行夹具额外的装甲棒硬件Earthwire 7特设工作组第6号完整的悬挂设定一套完整的紧张局势振动阻尼器,斯托克型额外的紧张局势夹额外的紧张关节额外的振动阻尼器额外的平行夹具额外的装甲棒小计,项目6月1号至6月4号小计,项目1.4 , 2.7 , 3.8 , 4.8 , 5.4和6.5 (换乘摘要,附表1 仅供参考
-
According to the principle of the diameter of a circle corresponding to the right angle and the principle of short side for little angle in right triangle, projecting the initially-chosen point to the hyper-planes of the linear equation group in which every linear equation can be regarded as a hyper-plane and the projection points can be obtained. The initially-chosen point, and one arbitrary projection point, and the solution point are all on the surface of the relative hyper-geometry ball, therein-to, there is a projection point which is nearest to the solution point and it can be regarded as the next iterative initially-chosen point, so the solution problem of the linear equation group can be changed as an iterative problem of approaching the solution on the surface of a hyper-geometry ball.
根据直径对应的圆周角足直角以及直角三角形中短边对小角的原理进一步知道,当将初始点向线性方程组中各个方程所代表的超平面上投影得到投影点时,初始点和其任何一个投影点及方程组的解点都将位于一个相应的超球面上,其中必定存在一个投影点离问题解点的距离最短,即把该点作为下一次迭代的初始点,从而可将线性方程组求解的问题变成球面上逼近解点的迭代问题。
-
The research is carried on from four aspects. One is, based on answering the above open problem on a finite dimensional Euclidean space by means of partially ordered theory, to research the existence of solutions, global error bounds of proximal solutions and sensitivity of parametric unique solutions and present a class of variable-parameter three-step iterative algorithms for generalized set-valued variational inclusion problems by using - resolvent operator of set-valued mapping.Two is to consider the convexity, closedness and boundedness of the solution set of general set-valued variational inclusion problems and the sensitivity of the parametric solution set by means of graphical convergence theory. Three is to discuss directly the existence of solutions by using analytical methods for set-valued mixed quasi-variational-like inequalities and suggest a class of direct variable-parameter three-stepiterative algorithms for solving generalized set-valued variational inclusions.
研究分有三个方面:一是借助于偏序理论在有限维欧氏空间中解决了上述公开问题,在此基础上利用集值映射的η-预解算子,研究了广义集值变分包含问题解的存在性、逼近解的全局误差界、参数唯一解的灵敏性,并提出了一类变参数三步迭代算法;二是借助于图收敛理论研究了一般集值变分包含问题解集的凸性、闭性和有界性以及参数解集的灵敏性;三是用分析的方法直接讨论了集值混合拟类变分不等式问题解的存在性并提出了一类求解广义集值变分包含问题的直接变参数三步迭代算法。
-
Thence in a southeasterly direction to Corner Point No. CP14 (X = 484 330, Y = 683 415); thence in a. northeasterly direction to Corner Point No. CP15 (X = 484 390, Y = 683 490); thence in a southeasterly direction to Corner Point No. CP16 (X = 484 415, Y = 683 470); thence in a southwesterly direction to Corner Point No. CP17 (X = 484 355, Y = 683 395); thence in a southeasterly direction to Corner Point No. CP18 (X = 484 430, Y = 683 335); thence in a southeasterly direction to Corner Point No. CP1, the point of beginning.
从该点起向东南延伸至隅角点CP14(X = 484 330,Y = 683 415);从该点起向东北延伸至隅角点CP15(X = 484 390,Y = 683 490);从该点起向东南延伸至隅角点CP16(X = 484 415,Y = 683 470);从该点起向西南延伸至隅角点CP17(X = 484 355,Y = 683 395);从该点起向东南延伸至隅角点CP18(X = 484 430,Y = 683 335);从该点起向东南延伸至隅角点CP1。
-
Given a planar point set,the moving least squaremethod is adopted to denoise and resample it so that the resulting point set is with low noise and uniform sampling density.Then the reliable signed distance field of the preprocessed point set is constructed by using the Level Set method.Finally,an algebraic B-spline function is adopted to fit the signed distance field by solving a linear equation system.
首先给定一个表示封闭曲线、可能带有噪音且分布不均匀的平面点云,采用移动最小平方(moving least square,简称MLS)方法对点云去噪、重采样,得到一个低噪音、分布均匀的"线状"点云,再通过Level Set方法建立该"线状"点云的离散几何距离场,最后用一个代数B-样条函数光顺拟合该离散距离场,代数函数的零点集即为重建曲线。
-
Hua Yan chants suggestion , wants to avoid having contracted glycuresis , should achieve to the full "four partial ": Know one point much , be that the knowledge to glycuresis knows one point much , gets rid of the glycuresis taking precautions against initiatively; Stop being asked the non-staple food controlling the general quantity of heat absorbing , eating vegetable much , stopping eating staple food , high heat to need to stop eating also by one point,; Move one point much , be going often, to keep certain motion amounts , make the body not to such an extent as to be too fat; Loosening one point , psychologically upset is able to strengthen insulin resistance further , urge glycuresis to happen , good psychology has taking precautions against an effect actively to glycuresis.
华燕吟建议,要避免患上糖尿病,应尽量做到&四个一点&:多懂一点,即对糖尿病的知识多懂一点,积极主动地去预防糖尿病;少吃一点,要控制摄取的总热量,多吃蔬菜,少吃主食,高热量的副食也要少吃;多动一点,要经常保持一定的运动量,使身体不至于过胖;放松一点,心理不平衡会进一步加强胰岛素抵抗,促使糖尿病发生,好的心态对糖尿病有积极的预防作用。
-
Company has 8 sets Vertical Machining Center, 1 set Horizontal Machining Center, 6 sets NC lathe, 1 set O.D. Grinding machine, 1 set Plane Grinding machine, 3 sets EDM, 1 set CMM, 1 set universal tool microscope, 1 set cutter aligner, 1 set roughness instrument, etc., much of equipments are the most advanced in domestic.
主要 设备有:加工中心9台(最大加工范围800mm)、数控车床6台(最大加工直径360mm)、外圆磨、平面磨、慢走丝线切割机、快走丝线切割机,电火花成形机、三维坐标测量仪、万能工具显微镜,精密对刀仪、粗糙度仪等。
-
OSB production line,Particleboard production line,MDF production line,HDF production line,Plywood complete set of Equipment,Composite panels complete set of Equipment,HF Bending wood complete set of Equipment,Blockboard production line,Artificial board cover complete set of Equipment,Bamboo Filaments floor complete set of Equipment,Bamboo board complete set of Equipment,Bamboo mat complete set of Equipment, Composite pallet board tray machine.
复合板生产线、胶合板成套设备、刨花板OSB成套设备、细木工板成套设备、贴面成套设备、纤维板成套设备、竹地板成套设备、模压托盘设备。
-
Resistance to Earth magic by an amount equal to your skill in Earth and lasts one hour per point of skill. 1 point resistance per point of skill 2 points resistance per point of skill 3 points resistance per point of skill 4 points resistance per point of skill P
每提高一个土魔法等级可以增加1点防御值每提高一个土魔法等级可以增加2点防御值每提高一个土魔法等级可以增加3点防御值每提高一个土魔法等级可以增加4点防御值 P
- 相关中文对照歌词
- Set It Off
- Set It Off
- Stress Reliever
- No Point
- Set It Off
- Fuego
- Set It Off
- Set Me Free
- Set It Off
- Getting To The Point
- 推荐网络例句
-
The dissecting of samples in group2 were difficult. The root of pulmonary artery and ascending aorta failed to be unfolded because fibrous tissue was tough, right and left fibrous trigone were too firm to be solved by hand. Cardiac muscle fibers couldn't be stripped along myofibrillar trajectory since they were prone to break because of their friability.
组2的心脏解剖困难,表现为纤维组织坚韧,游离肺动脉非常困难;徒手无法松解左、右纤维三角,肺动脉和主动脉根部的游离非常困难;心肌纤维坚硬、质脆,解剖时容易断离成碎块,无法沿纤维走行方向剥离。
-
We have battled against the odds in a province that has become increasingly violent.
我们对在一个争夺日益激烈省的可能性。
-
MILAN - The team has left for the States at 10.15am CET from Terminal 1, Milan Malpensa airport. The Rossoneri will land in New York at 12.50am local time (6.50pm CET), after a nine-hour flight.
米兰—球队在上午10:15从米兰马尔朋萨机场第一登机口登机,出发前往美国,预计于纽约时间上午12:50降落(意大利时间下午6:50),飞行时间大约9个小时。