英语人>网络例句>on the water 相关的网络例句
on the water相关的网络例句

查询词典 on the water

与 on the water 相关的网络例句 [注:此内容来源于网络,仅供参考]

A little after Noon I found the Sea very calm, and the Tyde ebb'd so far out, that I could come within a Quarter of a Mile of the Ship; and here I found a fresh renewing of my Grief, for I saw evidently, that if we had kept on board, we had been all safe, that is to say, we had all got safe on Shore, and I had not been so miserable as to be left entirely destitute of all Comfort and Company, as I now was; this forc'd Tears from my Eyes again, but as there was little Relief in that, I resolv'd, if possible, to get to the Ship, so I pull'd off my Clothes, for the Weather was hot to Extremity, and took the Water, but when I came to the Ship, my Difficulty was still greater to know how to get on board, for as she lay a ground, and high out of the Water, there was nothing within my Reach to lay hold of; I swam round her twice, and the second Time I spy'd a small Piece of a Rope, which I wonder'd I did not see at first, hang down by the Fore-Chains so low, as that with great Difficulty I got hold of it, and by the help of that Rope, got up into the Forecastle of the Ship; here I found that the Ship was bulg'd, and had a great deal of Water in her Hold, but that she lay so on the Side of a Bank of hard Sand, or rather Earth, that her Stern lay lifted up upon the Bank, and her Head low almost to the Water; by this Means all her Quarter was free, and all that was in that Part was dry; for you may be sure my first Work was to search and to see what was spoil'd and what was free; and first I found that all the Ship's Provisions were dry and untouch'd by the Water, and being very well dispos'd to eat, I went to the Bread-room and fill'd my Pockets with Bisket, and eat it as I went about other things, for I had no time to lose; I also found some Rum in the great Cabbin, of which I took a large Dram, and which I had indeed need enough of to spirit me for what was before me: Now I wanted nothing but a Boat to furnish my self with many things which I forsaw would be very necessary to me.

午后不久,海面风平浪静,潮水也已远远退去。我只要走下海岸,泅上几十米,即可到达大船。这时,我心里不禁又难过起来。因为我想到,倘若昨天我们全船的人不下小艇,仍然留在大船上,大家必定会平安无事。这时就可安抵陆地;我也不会像现在这样,孤苦伶仃孑然一身了。而现在,我既无乐趣,又无伴侣。想到这里,我忍不住流下泪来。可是,现在悲伤于事无济,我即决定只要可能就先上船去。当时,天气炎热,我便脱掉衣服,跳下水去。可是,当我泅到船边时,却没法上去,因为船已搁浅,故离水面很高;我两臂所及,没有任何可以抓住的东西。我绕船游了两圈,忽然发现一根很短的绳子。我惊异自己先前竟没有看见这根绳子。那绳子从船头上挂下来,绳头接近水面;我毫不费力地抓住绳子往上攀登,进入了船上的前舱。上去后发现船已漏水,舱底进满了水。因为船搁浅在一片坚硬的沙滩上,船尾上翘,船头几乎都浸在水里,所以船的后半截没有进水。可以想像,我急于要查看一下哪些东西已损坏,哪些东西还完好无损。首先,我发现船上的粮食都还干燥无恙。这时,我当然先要吃些东西,就走到面包房去,把饼干装满了自己的衣袋,同时边吃边干其他活儿,因为我必须抓紧时间才行。我又在大舱里找到了一些甘蔗酒,就喝了一大杯。此时此刻,我极需喝点酒提提神。我这时只想有一只小船,把我认为将来需要的东西,统统运到岸上去。

Our study regarded Pear and Aids Apricot tree which be used to develop afforestation by water-harvesting in Semi-arid Region on Loess Plateaus as experience forest. In the case of water-retaining agent, we study the physical effect of water-retaining agent on soil water shifting balance and water use efficiency through soil-water-atmosphere conium system.

本研究以黄土半干旱区集水造林的杏树和梨树为试验林分,采取以保水剂为中心的综合保水技术,运用土壤—植物—大气连续体理论和土壤物理学理论,系统地研究了保水剂对土壤水分动态及其利用效率的影响,得到如下主要结论: 1。

At length I spy'd a little Cove on the right Shore of the Creek, to which with great Pain and Difficulty I guided my Raft, and at last got so near, as that, reaching Ground with my Oar, I could thrust her directly in, but here I had like to have dipt all my Cargo in the Sea again; for that Shore lying pretty steep, that is to say sloping, there was no Place to land, but where one End of my Float, if it run on Shore, would lie so high, and the other sink lower as before, that it would endanger my Cargo again: All that I could do, was to wait 'till the Tide was at highest, keeping the Raft with my Oar like an Anchor to hold the Side of it fast to the Shore, near a flat Piece of Ground, which I expected the Water would flow over; and so it did: As soon as I found Water enough, for my Raft drew about a Foot of Water, I thrust her on upon that flat Piece of Ground, and there fasten'd or mor'd her by sticking my two broken Oars into the Ground; one on one Side near one End, and one on the other Side near the other End; and thus I lay 'till the Water ebb'd away, and left my Raft and all my Cargo safe on Shore.

最后,我终于在小河的右岸发现一个小湾。我费尽艰辛,好不容易把木排驶到最浅的地方。我用桨抵住河底,尽力把木排撑进去。可是,在这里,我几乎又一次险些把货物全都倒翻在水里。这一带河岸又陡又直,找不到可以登岸的地方。如果木排一头搁浅在岸上,另一头必定会像前次那样向下倾斜,结果货物又有滑向水里的危险。这时,我只好用桨作锚,把木排一边固定在一片靠近河岸的平坦的沙滩上,以等待潮水涨高,漫过沙滩再说。后来,潮水果然继续上涨,漫上沙滩,等水涨得够高了,我就把木排撑过去,因为木排吃水有一尺多深。到了那儿,我用两支断桨插入沙滩里,前后各一支,把木排停泊好,单等潮水退去,就可把木排和货物品平安安地留在岸上了。

The subject is based on the study forward position of water resources management of LIAONING province, and use the developed tendency and succeeded experience of world water resources for reference, take theory of sustainable development as guiding ideologue, adopt systematic project, protection of ecosystem and environment and theory of economy forecast engage in composite analyze, dynamicevaluate and forecast analyze, forecast developed tendency of water resources supplement and demand of LIAONING province, put forward water resources rational disposition, economize on water, the prevention and control of water pollution and strength water resources protection etc.

本课题立足于辽宁省水资源管理研究前沿,借鉴了国内外水资源发展趋势和成功经验,以可持续发展的理论为指导,运用系统工程、生态环境保护理论和经济预测理论进行综合分析、动态评价,进而预测辽宁省水资源供需发展态势,提出了辽宁省水资源合理配置、节约用水、水污染防治和增强水资源保护等措施,为辽宁省抗旱、节水和水资源优化配置提供决策依据。

The paper through the mechanism which produces to the asphalt road surface water harm carries on the induction to summarize, as well as the different type bituminous mixture water stability has carried on a series of contrasts experiment to several kind of different aggregates and the asphalt adherency, has analyzed the aggregate and the asphalt adherency and the bituminous mixture water stability; Meanwhile moves the water action mechanism take the pavement structure in as the key point, in the basis room experiments to the design half rigid base bituminous mixture test sample carries on washes out the experiment, the observation test sample and washes out when the number of times increase along with the time variation the basic unit wash load situation, has analyzed the water to the bituminous pavement various structures level damage rule; To immerses under the condition using the ANASYS finite element software the bituminous pavement structure level the stress to carry on the analysis computation, and analyzed the bituminous pavement according to the computed result to produce the unboiled water harm the rule, further to understand the structure level produced the unboiled water harm the rule.

本论文通过对沥青路面水损害产生的机理进行归纳总结,对几种不同集料和沥青的粘附性以及采用不同抗剥落措施的沥青混合料的水稳性进行了一系列对比试验,分析了集料与沥青的粘附性及沥青混合料的水稳定性,并对水稳性试验进行了评价;同时以路面结构中的动水作用机理为重点,依据室内试验对设计的半刚性基层沥青混合料组合试件进行冲刷试验,观察试件随时间变化和冲刷次数增加时基层的冲刷量情况,分析了水对沥青路面结构层的损坏规律;利用ANSYS有限元软件对浸水前后沥青路面层底应力进行分析计算,并根据计算结果分析了沥青路面产生水损害的规律,进一步了解结构层产生水损害的规律。

In this paper, the 3-D finite element relocating mesh method is used to calculate the temperature field and the thermal creep stress field of spillway dam and mid level outlet dam in certain roller compacted concrete gravity dam, sensitivity analysis have been down with different parameters, such as placing temperature, the location of cooling pipe, cooling temperature, time for water supply, ascended-layer of concrete, intermissive time and different placing time, and the commendatory construction scheme have been put forward in such analysis; according by the test result on the two scheme of concrete aggregate combination (basalt as coarse aggregate and limestone as fine aggregate, basalt as coarse aggregate and basalt as fine aggregate), simulation analysis on temperature field and thermal creep stress field of the commendatory construction scheme have been down, and analysis have also been down on temperature field and thermal stress field of the two different aggregate combination, the result indicates that the spillway dam and mid level outlet dam which adopted these two aggregate combination can both satisfy the require of design crack resistance in concrete, furthermore limestone as fine is better than basalt as fine aggregate; the effect of summer water storage and winter water storage on the temperature field and thermal stress field have been analyzed, comparing with winter water storage, in summer water storage scheme the maximum tensile stress at abnormal concrete in upstream fill is decreased by 0.1~0.3MPa and there are no evidence change of the maximum tensile stress at other parts, which indicate that summer water storage is avail for the crack resistance of upstream fill; according to the simulation calculating result and comparing temperature simulation calculating results and temperature controlling measures of some similarity projects both completed and construction, synthesis appraise have been carried to the design temperature controlling measures of dam, and the temperature controlling measures of this project have been brought forward, all these have great reference value on the design of temperature controlling measures and the optimization of the construction scheme.

本文采用三维有限元浮动网格法仿真计算程序,对某碾压混凝土重力坝的溢流坝段和中孔坝段分别进行了三维有限元温度场和温度徐变应力仿真计算分析,对浇筑温度、冷却水管的布置方式、冷却水温、通水时间、浇筑升程和间歇时间、不同开始浇筑日期等参数进行了敏感性分析,在此基础上提出了推荐的施工方案;根据两种骨料方案(玄武岩粗骨料+灰岩细骨料方案;玄武岩粗骨料+玄武岩细骨料方案)的混凝土性能试验研究成果,对推荐的施工方案进行了温度场和温度徐变应力仿真计算,并对比分析了两种不同骨料情况下的温度场和温度应力,结果表明溢流坝段及中孔坝段采用上述两种骨料均能满足混凝土的抗裂设计要求,且灰岩细骨料优于玄武岩细骨料;计算分析了夏季蓄水和冬季蓄水对坝体温度场和温度应力的影响,夏季蓄水方案与冬季蓄水方案相比,坝体上游变态混凝土区域最大拉应力小0.1~0.3MPa,其他部位最大拉应力无明显变化,夏季蓄水对坝体上游面混凝土的抗裂有利;根据仿真计算成果并通过比较国内一些已建和在建的类似工程的温度仿真计算成果及采取的温控措施,对大坝的设计温控措施进行了综合评价,并提出了该工程的温控措施,对温控设计和优化施工方案具有重要参考价值。

Through the tests on gas driving water and water driving gas, the flow law of gas and water was real-time observed. Mainly based on the test of water driving gas as an example, the development of molding coal sample and NMR triaxial osmoscope was demonstrated. The experiment process of water driving gas and parameters were demonstrated. NMRI images of molding sample in horizontal cross-section along the driving direction were obtained by NMRI instrument. The results from images were analyzed and compared. Some novel laws were obtained as the following:(1) the leading edge of water driving has inconsistency. This certified the important previous conclusion that the storage of methane mainly was absorbed in inner surface of pore from NMRI technique;(2) the existence of dominant driving pathway was tested and the way kept almost fixed. The pathway is apt to exist in the edge of coal samples where pore and fracture fully develop;(3) the variation of water flow determines the transport velocity of leading edge of water driving and it has lag effect;(4) the effectiveness of the first driving is better than the second driving;and (5) the subsequence of water driving gas are from trunk fractures to branch fractures, then to branch pores.

主要以水驱气NMRI试验为例,详细介绍了核磁共振三轴渗透仪和型煤试件的研制,并重点阐述了水驱气试验过程和相关参数,利用NMRI技术实时观测得到了不同时间沿驱替方向型煤试件水平剖面的NMRI成像图,最后对试验结果进行了比较分析,揭示了一些新的规律认识:(1)水驱替前缘具有不一致性,从NMRI试验角度验证了前人甲烷类气体赋存形式主要以吸附在孔隙内表面为主的重要结论;(2)煤试件存在优势驱替路径,且这种优势路径在驱替过程中基本保持不变,水驱气的优势驱替路径易产生在煤试件边缘,即煤孔隙裂隙发育区;(3)水驱流量变化决定了水驱前缘的运移速度,且对水驱气效果具有滞后效应;(4)水驱气初次驱替效果好于二次驱替效果;(5)水驱替气的顺序为:主要大裂隙—周边裂隙—周边孔隙。

The steam acts upon the surface of the water in the receiver, which surface only being heated by the steam, it does not condense, but the steam gravitates or presses with an elastic quality like air, and still increasing its elasticity or spring, until it counterpoises, or rather exceeds, the weight of the column of water in the force pipe, which then it will necessarily drive up that pipe; the steam then takes some time to recover its power, but it will at last discharge the water out at the top of the pipe You may see on the outside of the receiver how the water goes out, as well as if it were transparent; for, so far as the steam is contained within the vessel, it is dry without, and so hot as scarcely to endure the least touch of the hand; but so far as the water is inside the vessel, it will be cold and wet on the outside, where any water has fallen on it; which cold and moisture vanish as fast as the steam takes the place of the water in its descent.

&&蒸汽行为后,水面在接收端,而只是表面被加热水蒸汽,它不浓密,但相互依赖蒸汽或印刷机具有弹性质量一样的空气,并仍在增加其弹性,或春天,直到它网,而超过重量栏水警队管道,然后它一定会推到管;蒸汽则需要一段时间来恢复其权力,但它会在最后排放水出顶管,你可以看到外面的接收机如何当然水,以及如果它的透明度;,目前为止由于蒸汽载船,它是未经干燥,所以作为热几乎要忍受至少触摸的手;但到目前为止,由于水内的船只,将寒冷和潮湿对外面,那里没有水落下;其中寒冷和水分消失快蒸汽需地方水在其后裔。

Jiangxi Provincial Water Resources Department Director of SUN Xiao-shan traveled to the shore of Poyang Lake is located in Xingzi County, Jiangxi Province, Poyang Lake Water Environment Monitoring Center held a forum to seriously listen to Provincial Hydrological Bureau and the Poyang Lake Hydrographic Office person in charge on a comprehensive work program to carry out the Poyang Lake water quality monitoring reports, etc., and discussions with relevant experts to listen to opinions and suggestions, but also by boat in-depth Pan Yang Lake, examining Duchang County hydrological stations, hydrological stations, and Tong Yam DUCHANG COUNTY Kornhill hydrological station, a cordial call on the fighting in the first line of grass-roots hydrological workers to understand the grass-roots hydrological conditions and water quality monitoring of workers and staff to carry out work of a comprehensive program of work on the elaboration of a comprehensive monitoring of water quality of Poyang Lake launched to promote the Poyang Lake water and water environment protection.

9 17,江西省水利厅主任孙晓山奔波于鄱阳湖滨,是在星子县,位于江西省,鄱阳湖水环境监测中心召开座谈会,认真听取省水文局和鄱阳湖水文局负责人就一项全面的工作计划,开展鄱阳湖水质监测报告等,并与有关专家讨论,听取意见和建议,而且还乘船深入Pan杨拉珂,研究都昌县水文站,水文站,与棠荫都昌县康山水文站,就在基层第一线战斗的基层水文职工亲切看望,了解基层水文条件和水的质量监测和工人工作人员进行了一对鄱阳湖水质量综合监测制定一项全面的工作方案开展工作,促进鄱阳湖水资源和水环境的保护。07.9.24

When a sudden power failure or accident or normal pump stops when the pump stops, the valve inlet water velocity to reduce stress Agency, the valve plate also fall, when its velocity is zero (that is, inlet flow rate is zero Department), large valve plate because of its own gravity and rapidly turn off (time 3s ~ 5s), the majority of water to prevent backflow, when the valve before and after the formation of a water pressure, water stress, on the one hand through the small valve at the bottom of the three slot for pressure relief vent pressure. 4 water stress from the bypass tube into the cavity patch up the control room (this process for the suction pressure chamber that can effectively absorb the energy of water), when water stress on cavity than inferior vena cava, the pressure of water promote the diaphragm down mobile , the current cavity pressure of water being squeezed out all the small valve plate slowly drop back to standby status, the process time to ease closure adjustable (3s ~ 150s), then the valve has been fully closed, watertight.

当突然停电或事故停泵或正常停泵时,阀门进水口处压力水流速降低,大阀板也随之下降,当其流速为零时,大阀板由于自身重力而迅速关闭(时间3s~5s),可防止大部分水倒流,此时阀门前后形成一种水压差,压力水一方面通过小阀板底部的三条泄压槽进行泄压。4)压力水从旁通管进入膜片控制室上腔(此过程为吸压腔,能有效吸收一部分水能量),当上腔压力水大于下腔时,压力水推动膜片往下移动,当下腔压力水全部被挤出来时,小阀板缓缓下降,恢复到待机状态,此过程中缓闭时间可调节(3s~150s),届时阀板已全部关闭,滴水不漏。

第37/100页 首页 < ... 33 34 35 36 37 38 39 40 41 ... > 尾页
相关中文对照歌词
Turn On The Water
Candle On The Water
Walking On The Water
Stone On The Water
Spirit On The Water
Walk On The Water
Rock Me On The Water
Stars On The Water
Fire On The Water
Walk On The Water
推荐网络例句

Singer Leona Lewis and former Led Zeppelin guitarist Jimmy Page emerged as the bus transformed into a grass-covered carnival float, and the pair combined for a rendition of "Whole Lotta Love".

歌手leona刘易斯和前率领的飞艇的吉他手吉米页出现巴士转化为基层所涵盖的嘉年华花车,和一双合并为一移交&整个lotta爱&。

This is Kate, and that's Erin.

这是凯特,那个是爱朗。

Articulate the aims, objectives and key aspects of a strategic business plan.

明确的宗旨,目标和重点战略业务计划。