英语人>网络例句>on the road to 相关的网络例句
on the road to相关的网络例句

查询词典 on the road to

与 on the road to 相关的网络例句 [注:此内容来源于网络,仅供参考]

The adoption of stone matrix asphalt SMA-16 ,with SBS modified bitumen ,in the pavement course on Shen-Da Freeway rebuilding is one important decision based on scientific experiment and characteristics of shenda highway rebuilding itself .It is not only suit heavy traffic and difference in temperature variety the factor of etc. environment request road, but also to road usage function for anticatalyst and durability with enduring all having very big exaltation, guaranteeing the road.

沈阳至大连高速公路改扩建工程路面表面层采用沥青玛蹄脂碎石混合料SMA- 16型(简称SMA - 16 ),沥青采用SBS改性沥青,是在科学试验的基础上,结合沈大路自身的特点所做的重大决策;它不仅适合沈大路交通量大、温差变化大等环境因素对路面的要求,而且对路面的抗滑性和耐久性均有很大的提高,保证了路面的使用功能。

Since the existing vehicle driving simulator is lack of incarnating the contents of road sign and Highway Code, the road sense instruction system based on knowledge base is put forward and the detailed road sense database is composed; a simple and practical UI is constituted to make the bald booklore put more road sense into the process of virtual driving.

针对目前汽车驾驶模拟器存在的道路标识、标线及交通法规知识内容体现不足的问题,提出了一种基于知识库的汽车驾驶知识学习系统框架,构建了详细的驾驶知识数据库;建立了简单实用的用户界面,将枯燥的书本知识变得简单生动;同时,将知识库知识与虚拟驾驶模拟器融合,使驾驶知识融入虚拟驾驶全过程。

However, on reaching the Bovril Gate, we found that people were queueing out into the Fulham Road. Twenty minutes later, we had just managed to get past the Fulham Road pavement and onto the cobbles of the much-loved entrance to our beloved Shed terrace.

但是,到达Bovril门的时候,我们发现人们已经排起了很长的队了。20分钟后,我们才刚刚通过Fulham Road看台大门走上鹅卵石铺成的,亲爱的Shed看台的入口通道。

On the future scope and practical perspective to the interpretation of each : she is part of West Second Avenue line east, south Taopu Road, Woo Road north, east, Link, Chilian Mountain Road, Woo intersections.

站在未来的广度,以实际的眼光来逐一诠释:她地处环西线二大道以东,桃浦路以南,金鼎路以北,外环线以东,祁连山路、金鼎路口。

In our country, the development of road transportation is mainly simple scalar expansion of low level, The growth of factor productivity contribute small to the economy increase, and the mainly character is: The development of road passenger transport and road freight is mainly the expansion of quantitatively and scalely;the development of road transportation depends on the infrastructure's high devote and market demand increase; technical is draggle and energy consumption is high, the Structural upgrade of industry is slow.

在我国,道路运输业的增长以低水平的简单数量扩张为主,要素生产率提高对增长的贡献度较小,具体表现为:道路客货运输服务的发展以数量和规模的扩大为主;道路运输业的发展仍然依赖于基础设施建设的高投入和市场需求的扩大;技术水平较低,能耗高,产业结构升级步伐缓慢。

The present situation in flood-control and waterlog-drain are analyzed, and the present problems are pointed out.2 The causes and characteristics of the floods in Linyi are summarized, and the flood-control project and the waterlog-drain system in Linyi are also introduced.3 On the basis of summarizing the reconnaissance data of engineering geology, the engineering geology conditions of flood-control projects in the city of Linyi are studied, including the floodway project ,the hinge project, the Ge-Jiu Road Bridge project, the No.327 national highway road bridge project, the E-Huang Road Bridge project, and the Xiaogezhuang's chief inverted siphon project in the project of "Bifurcating the Su River to the Beng River".4 Seepage FEM analyses are carried out on the flood-control projects of Yi River, Beng River and Xiaosu River, respectively.

总结了临沂市洪灾成因及洪水特性,介绍了临沂市城市防洪工程和排涝工程。 3、在综合工程地质勘察资料基础上,分析了临沂市城市防洪工程的工程地质条件,包括:"分涑入祊"分洪道工程地质条件分析、"分涑入祊"枢纽工程地质条件分析、"分涑入祊"葛九公路桥工程地质条件分析、"分涑入祊"327国道公路桥工程地质条件分析、"分涑入祊"鹅黄公路桥工程地质条件分析、"分涑入祊"小葛庄总干倒虹吸工程地质条件分析。

In this field, Christian et proposed a Island method in 2005, it is a k nearest neighbor query method of moving objects based on road network,but this method has three flaws which are k nearest neighbor query in constrained road network,traffic-jam exploration and optimize of Island's radius. This article has studied k nearest neighbor query of moving objects based on road network in view of above three aspects ,and proposed the Island+ method, which has made the improvement to the memory structure and trajectory preservation of neighbor objects.

在这一领域,Christian等人在2005年提出了Island方法,它是一种基于路网的移动对象k近邻查询方法,但是这种方法存在以下不足的地方,第一,该方法对路网没有任何限制条件;第二,没有给出明确的数据存储结构;第三,区域半径一致,效率不高。

Per square meter price 5000-5500 yuan project are: Youth Road, Chaoyang District, located in the State of the United States and the First City, Huafang prone city, youth exchange district, located in Chaoyang Road shopping district of Huatang CASA, Huidong four subway stations on the eastern side of No. 29 Jianguo Road, West Road姚家园mouth water Gimhae嘉苑, Jiuxianqiao the ZAMA, basically can be used to buy two-bedroom 500,000 yuan.

价格为每平方米5000-5500元的项目有:青年路,朝阳区,位于该国的美国和第一城,华纺易城,青年交流区,位于朝阳路的华堂购物区小武器,四惠东地铁站东侧的建国路29号,姚家园路西口的水金海嘉苑,酒仙桥在Zama ,基本上可以用来购买两居室50万元。

If we say that the proposition in 2006 essay "Man and the Road" study point to focus on as individuals and as the object of "Road" dialectical relationship between the 2007 composition of the proposition "Sky" focuses on the mental space to explore 2008 essay topics were focused on the excavation of the inner world, then in 2009 the title of the essay is focused on people with a symbiotic blend of the trend of the times.

如果说,2006年的命题作文&人与路&考察点侧重于作为个体的人和作为客体的&路&之间的关系辩证,2007年的命题作文&怀想天空&侧重于探究人的精神空间,2008年的作文题目侧重于人的内心世界的挖掘的话,那么2009年的作文题目则是侧重于人与时代潮流的交融共生。

The present situation in flood-control and waterlog-drain are analyzed, and the present problems are pointed out.2 The causes and characteristics of the floods in Linyi are summarized, and the flood-control project and the waterlog-drain system in Linyi are also introduced.3 On the basis of summarizing the reconnaissance data of engineering geology, the engineering geology conditions of flood-control projects in the city of Linyi are studied, including the floodway project ,the hinge project, the Ge-Jiu Road Bridge project, the No.327 national highway road bridge project, the E-Huang Road Bridge project, and the Xiaogezhuang's chief inverted siphon project in the project of "Bifurcating the Su River to the Beng River".4 Seepage FEM analyses are carried out on the flood-control projects of Yi River, Beng River and Xiaosu River, respectively.

总结了临沂市洪灾成因及洪水特性,介绍了临沂市城市防洪工程和排涝工程。 3、在综合工程地质勘察资料基础上,分析了临沂市城市防洪工程的工程地质条件,包括:&分涑入祊&分洪道工程地质条件分析、&分涑入祊&枢纽工程地质条件分析、&分涑入祊&葛九公路桥工程地质条件分析、&分涑入祊&327国道公路桥工程地质条件分析、&分涑入祊&鹅黄公路桥工程地质条件分析、&分涑入祊&小葛庄总干倒虹吸工程地质条件分析。

第68/100页 首页 < ... 64 65 66 67 68 69 70 71 72 ... > 尾页
相关中文对照歌词
On The Road To Findout
On The Road To Mandalay
Are You On The Road To Lovin' Me Again
Neon Angels On The Road To Ruin
推荐网络例句

Breath, muscle contraction of the buttocks; arch body, as far as possible to hold his head, right leg straight towards the ceiling (peg-leg knee in order to avoid muscle tension).

呼气,收缩臀部肌肉;拱起身体,尽量抬起头来,右腿伸直朝向天花板(膝微屈,以避免肌肉紧张)。

The cost of moving grain food products was unchanged from May, but year over year are up 8%.

粮食产品的运输费用与5月份相比没有变化,但却比去年同期高8%。

However, to get a true quote, you will need to provide detailed personal and financial information.

然而,要让一个真正的引用,你需要提供详细的个人和财务信息。