查询词典 on the beam
- 与 on the beam 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The distribution and the variation of the pre-stressed effective quantities in the cross section of the beam are comprehensively analyzed by the FEA along with the variation of the span numbers, span length and linear rigidity ratio of beam to column, wherefore the effect factors and the specific conclusions of lateral restraints on the pre-stressed formation in the concrete beam are drawn.
本文以竖向支承构件有一定侧向刚度的预应力混凝土框架结构为研究对象,分析了框架梁受到柱的侧向约束时的受力机理,并运用有限元数值模拟计算方法全面分析了随着梁柱线刚度比、跨度、跨数等诸多因素的变化,框架梁中预应力有效量的分布和变化情况,得到了侧向约束对框架梁建立预压应力的影响因素和具体结论。
-
This device is characterised by that its beam-splitter unit is the above described one, the first focusing elements (24) are placed at two opposite sides as seen from the direction of the beam arriving to the semitransparent reflective surfaces of the optical beam-splitter unit (22) i.e. from the receiving direction (5) and the common optical axis (23) of the first focusing elements (24) is at right angles to the receiving direction; outside the first focusing elements (24) on both sides a mirror is placed in front of each eye, and the semitransparent reflective surfaces of these mirrors enclose an angle delta 45 DEG +-15 DEG with the above mentioned optical axis (23), and the intersection line of these reflective surfaces is parallel to the mirror crossing intersection line (4) of the semitransparent reflective surfaces.
该双目图像显示装置的特征是其光学分束器单元是所述的单元,从到达光学分束器单元(22)的半透明反射面的光束方向看,即从接收方向(5)看,第一调焦元件(24)放置在相对的两侧,并且第一调焦元件(24)的共同光轴(23)垂直于接收方向;在位于两侧的第一调焦元件(24)的外面反射镜放置在每一只眼睛的前面,并且这些反射镜的半透明反射面与所述共同的光轴(23)围成夹角δ45°±15°,并且这些反射面的交线平行于半透明反射面的交叉反射镜交线(4)。
-
First of all, the paper carried out test study on four two-spanned model members of FSMRCWB, including three 1/2-scaled two-storeyed models and one 1/3-scaled three-storeyed model. The paper analyzed the test results, including analysis on mechanical property of the composite wall beam under vertical loads, and failure mode, deformation capacity, aseismic performance under horizontal loads and constant vertical loads. Secondly, the nonlinear property of concrete is studed and the nonlinear models of FSMRCSS is builded by ANSYS. Last, The paper studies the result of ANSYS, which mainly includes the loading-displace curve of FSMRCSS under horizontal loads and constant vertical loads, the mechanics of arch under vertical loads lonely and under horizontal loads and constant vertical loads respectively, and status of the distribution and changing of vertical stress and cross shear on the surface of the suporting beam, and the influence of span ratio and hole.All in all, the caculating results are in good agreement with the test results.
本文首先进行了三个1/2比例的两跨两层和一个1/3比例的两跨三层的框支密肋复合墙梁的模型试验,分析了框支密肋复合墙梁在竖向荷载作用下的受力性能,以及在竖向荷载与水平低周反复荷载共同作用下的受力性能、变形性能、滞回性能、耗能系数及破坏形态;其次,研究了混凝土的非线性特性,建立了框支密肋复合墙梁非线性有限元模型,并借助大型通用有限元软件ANSYS进行计算;再则,进行了非线性有限元结果分析,主要研究框支密肋复合墙梁在竖向荷载与水平地震力共同作用下的荷载位移曲线,分析在竖向荷载单独作用下和在竖向荷载与水平地震力共同作用下墙梁的拱作用,托梁顶面的竖向应力和横向剪应力分布及变化情况,并讨论跨度比、洞口对墙梁拱作用和托梁顶面的竖向应力的影响。
-
The innovations of the thesis have been shown in several aspects as follows: put forward the transfer mechanism model of the landslide thrust on basis of the soil arching theory, and according to the model the formula about how to compute the thrust acting on the pile and the maximum pile spacing have been deduced. Set up the displacement model about the interaction of the pile and landslide, and their relatively displacement can be taken into consideration when computing the pile, thus the limitation of supposing the distribution of landslide thrust has been avoided, at the same time, the applied condition of the model and the computing procedure have been given. Bring forward the improved computing method of the anti-sliding pile with prestressed cable, which has been verified rational and applicable, making the method more perfectly in theory. Through the study on the mechanical model of the foundation beam with prestressed cable, put up the limit design idea of the structure, and the realization procedure of the idea has been given and programmed with the finite element, which leads to a new thinking for the safe and rational design of the foundation beam with prestressed anchor cable.
本论文的创新之处在于,用土拱理论建立了滑坡推力在抗滑桩与坡体之间的传递机制模型,并由此得到了作用于抗滑桩上的滑坡推力计算式以及最大桩间距的确定条件式;建立了抗滑桩与滑坡体相互作用的位移模型,该模型能考虑桩与坡体相互作用过程中二者相对位移的影响,避免了人为假设滑坡推力分布形式的缺陷,给出了其适用条件和计算过程;提出了预应力锚索抗滑桩的改进计算方法,使得预应力锚索抗滑桩的计算理论更加完善,通过实例验证了该方法的适用性和合理性;在预应力锚索地梁力学计算模型研究的基础上,提出了预应力锚索地梁极限状态设计的新思想,给出了该设计方法的实现途径并编制了有限元计算程序,为锚索地梁合理而安全的设计提供了一种新思路。
-
The composite beam is a component comprised the steel beam and the concrete flange plate on the steel beam.
组合梁是钢梁和其上混凝土翼板共同抗弯的一种构件。
-
Considering the influence of other loads and uncertain factors, the follows should be taken into account if the bridge erecting mode is continue to be used.(1) Strengthen beams of steel structure with orbits, especially second half part of the Bere Beam;(2) Altering the space between crossties and increasing the support in the mid of station weight beam both can enlarge the decentralization function of the load carrying on the trunk beam, but usually the latter way is more effective. When the latter way is chosen, the stiffness of the support should be diminished correspondingly. Furthermore, adjusting the height of the support would help a lot in dispersing load.
考虑到其它载荷的影响以及不可预测因素,如继续使用该类架桥方式,应做以下考虑:(1)增加钢架梁与轨道的支撑,特别是在贝雷梁的后半部分;(2)增大荷载作用在箱梁上的分散系数,可适当改变枕木间距,亦可在配重梁的中部增加支撑,后者效果会更有效,当考虑增加支撑时,同时要降低支撑的刚度,支撑如能简单地调整高度,将会对分散载荷起到非常大的帮助。
-
In the end, Based on the conception that the simple beam at ultimate rotates rigidly around the plastic hinge in the midspan when the beam fails because of bending, the formula for calculating the stress in the external tendons and the ultimate anti-bending capacity of the beam in the cases of different deviators have been developed.
最后,基于抗弯承载力极限状态下的简支梁可视为梁体绕跨中等曲率塑性铰发生刚性转动的假设,推导了在各种转向块布置情况下求体外预应力筋的变形和梁的跨中挠度,进而求得梁的极限弯矩的简化公式。
-
By analysis and comparison on the design of two beam-arch combination system bridges, this paper reflects the decisive influence of stiffness ratios of arch to beam in this kind of bridge design directly, and analyzes different design methods of these two bridge on arch rib tie bolt, and other key points for these two kinds of bindges.
本文通过对两座拱梁组合体系桥梁设计的比较和分析,直观地反映了此类桥梁设计中拱梁刚度比的决定性影响;同时分析了两桥在拱肋、系杆等细节的不同设计方法。
-
The welding distortions of the main beam and side beam of expansion and contraction beam are predicted and analysed based on the welding distortion calculation method of relative shrinkage volume.
采用基于相对收缩体积的焊接变形理论计算方法,对伸缩缝梁的中梁和边梁结构的焊接变形分别进行了预测、分析,并对实梁的焊接变形量进行了测试。
-
GHz ridge-loaded helical groove slow wave structure with a 20kV electron beam are given and the investigations of the effect of the ridge dimensions and electron beam parameters on the small signal gain are carried out. It is indicated from the calculation results that this type of structure is suitable for use as s SWS of high power, high gain but narrow passband millimeter TWT, of which the 3dB gain bandwidth is 3.4%. In order to increase the bandwidth, the reduction of the ridge gap or the increase of the electron beam current in an allowable range may be useful.
GHz的脊棱加载慢波结构的具体尺寸,并对此结构中小信号增益随脊尺寸的变化情况及电子注参数对其影响进行了研究,计算结果表明:此结构适宜于作为高增益窄带毫米波大功率行波管的慢波线,其3dB增益带宽为3.4%,为了展宽其工作带宽,可以适当减小间隙宽度,也可在一定范围内提高电子注电流。
- 推荐网络例句
-
With Death guitarist Schuldiner adopting vocal duties, the band made a major impact on the scene.
随着死亡的吉他手Schuldiner接受主唱的职务,乐队在现实中树立了重要的影响。
-
But he could still end up breakfasting on Swiss-government issue muesli because all six are accused of nicking around 45 million pounds they should have paid to FIFA.
不过他最后仍有可能沦为瑞士政府&议事餐桌&上的一道早餐,因为这所有六个人都被指控把本应支付给国际足联的大约4500万英镑骗了个精光。
-
Closes the eye, the deep breathing, all no longer are the dreams as if......
关闭眼睛,深呼吸,一切不再是梦想,犹如。。。。。。