查询词典 off base
- 与 off base 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
After that, the issue, which should be solved in the picture additive process, is discussed in detail. On the base of analyzing digital television signal data construction, TBC processes is put forward to apply in each group signal. Effective data taken off from the key signal is also solved. And the choice and insertion is used to protect assistant data.
接着,详细讨论了在图像叠加过程中应解决的问题,在分析了数字电视信号数据结构的基础上,提出了对各路信号进行TBC处理的方法,同时解决了对键信号进行有效数据提取的问题,并通过选择插入的方式对辅助数据进行了保护。
-
The collector in dynatron of smooth Ou photosensitive or blast off extremely direct receive laden resistor to be able to satisfy lesser laden requirement; to be in of dynatron of smooth Ou photosensitive blast off extremely add dynatron enlarge drive, the push-pull type circuit that through two photoelectricity coupler makes and feedbacking through increasing photosensitive dynatron base, reach stronger laden capacity already, increased the interference rejection capacity of power interface, the outputs power inadequacy weakness that overcame smooth Ou, raise the switch rate of smooth Ou again, overcame the distributinging capacitance as a result of existence of smooth Ou oneself, cause an effect to transmitting speed.
在光耦光敏三极管的集电极或发射极直接接负载电阻即可满足较小的负载要求;在光耦光敏三极管的发射极加三极管放大驱动,通过两只光电耦合器构成的推挽式电路以及通过增加光敏三极管基极正反馈,既达到较强的负载能力,提高了功率接口的抗干扰能力,克服了光耦的输出功率不足的缺点,又提高光耦的开关速度,克服了由于光耦自身存在的分布电容,对传输速度造成影响。
-
First chapter is the summary, mainly introduced the project basic survey; Second chapter for the dam site hydrology characteristic, introduced the Hubei -01 key project in the basin specially is nearby the dam site hydrometeorology survey; Third chapter for the key position and the storehouse district terrain geology condition, introduced explained the dam site specially is nearby the dam spool thread terrain geology condition; Fourth chapter for the key position building shaping and the hydrology computation, including determined key position the project rank, the building shaping, adjusts Hong to calculate, blows off the bottom hole cross section size drawing up with initially to draw up the key position scheme of arrangement; Fifth chapter draws up for the size with the dam body arrangement, including the shaping, the Liang section plane determination, the dam body dam base guards against infiltrates the draining water facility the arrangement and the dam body plane arrangement and the stress stable analysis computation; Sixth chapter for the flood discharge design, mainly is the top of dam detailing and the downriver disappears can design; Seventh chapter for blows off the building the design, mainly is to imports the building the detailing strobe arrangement and Kong Shen and the exportation disappears can the design; Eighth chapter pilots the system and the power plant workshop design for the power plant, mainly is directs the system and the power plant workshop design to the power plant; Ninth chapter is ground processing, including ground excavating, the cleaning up, solidifies the grouting, the curtain is in the milk and all that some processing measure.
第一章为综述,主要介绍了工程的基本概况;第二章为坝址水文特性,介绍了鄂-01枢纽工程所在流域特别是坝址附近的水文气象概况;第三章为枢纽及库区地形地质条件,介绍说明了坝址特别是坝轴线附近的地形地质条件;第四章为枢纽建筑物的选型及水文计算,包括确定枢纽的工程等级,建筑物选型,调洪演算,放空底孔断面尺寸的拟定和初步拟定枢纽布置方案;第五章为拱坝尺寸拟定和坝体布置,包括拱坝的选型、拱冠梁剖面的确定、坝体坝基防渗排水设施的布置及坝体的平面布置和应力稳定分析计算;第六章为泄洪的设计,主要是坝顶的细部设计和下游消能设计;第七章为放空建筑物的设计,主要是对进口建筑物的细部设计闸门布置及孔身和出口消能的设计;第八章为电站引水系统及电站厂房设计,主要是对电站引系统和电站厂房的设计;第九章为地基处理,包括地基的开挖,清理,固结灌浆,帷幕灌浆以及其他一些处理措施。
-
45 The marauders sweep into the last remaining protoss expansion, with the probes desperately trying to chase off the attackers. Many probes get picked off by the marauders as they're kited away from the base.
17:45 大势已去,掠夺者一路扫荡至神族最后的分基地,成群的侦查兵绝望地冲向入侵者以图拼死一搏,结果大量侦查兵被掠夺者无情地消灭。
-
The marauders sweep into the last remaining protoss expansion, with the probes desperately trying to chase off the attackers. Many probes get picked off by the marauders as they're kited away from the base.
18:23 – Cooper大势已去,劫掠者一路冲杀至星灵最后的分基地,成群的探测器绝望地冲向入侵者妄想作垂死的挣扎,结果被劫掠者风筝到全军覆没
-
The marauders sweep into the last remaining protoss expansion, with the probes desperately trying to chase off the attackers. Many probes get picked off by the marauders as they're kited away from the base.
17:45 –大势已去,掠夺者一路扫荡至异能者最后的分基地,成群的侦查兵绝望地冲向入侵者以图拼死一搏,结果大量侦查兵被掠夺者无情地消灭。
-
In-mold labeling products practical, low-loss, screen printing, modulo, percentages, external standard products do not exist off ink, labelling will not be the subject of culter, off, breaks, and has a crush-resistant, waterproof, and oil, odoror, high friction and resistance to acid-base, cooling and heat-resistant features that make labels in special cases, not be damaged easily and theinterior, and so on.
模内贴标产品实用性强,损耗低,比较丝印、模外标产品,不会存在掉油墨、标签不会翘标、掉标、破损、兼具有耐挤压、防水、防油、防发霉、耐摩擦、耐酸碱、可冷却和耐热功能,使标签在特殊情况下不易损坏和受渍等作用。
-
Plus, being lefty at 1st base, advantage on the pick off position if runner on-base, as pitcher, Southpaws are in high demand.
此外,正在左手在第一基地,优势就挑选了亚军的位置,如果基地,作为投手,左撇子是有很高的需求。
-
You can camp atthe base and pick off enemies from the enemy base or kill the rushers.
您可以营地atthe基地,并且从敌人的基地,敌人或杀死rushers。
-
He sprang up, grabbed Bobby Abreu by the shoulders and sprinted off, the first player to break off the line. Jeter hung a left around first base and bounded into fair territory.
M; y&}6 Jwww.wangfans.com 他跳起来,抓住阿伯优的肩膀后帅先快速跑进场,在一垒垒包附近晃了一下,然后连跑带跳地到他美好的防区就定位,在洋基季后赛第一战开赛前,有这麼一段短暂的时刻里只有基特在球场中。
- 推荐网络例句
-
The split between the two groups can hardly be papered over.
这两个团体间的分歧难以掩饰。
-
This approach not only encourages a greater number of responses, but minimizes the likelihood of stale groupthink.
这种做法不仅鼓励了更多的反应,而且减少跟风的可能性。
-
The new PS20 solar power tower collected sunlight through mirrors known as "heliostats" to produce steam that is converted into electricity by a turbine in Sanlucar la Mayor, Spain, Wednesday.
聚光:照片上是建在西班牙桑路卡拉马尤城的一座新型PS20塔式太阳能电站。被称为&日光反射装置&的镜子将太阳光反射到主塔,然后用聚集的热量产生蒸汽进而通过涡轮机转化为电力