查询词典 nuclear power
- 与 nuclear power 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The control rod drive mechanism housing of nuclear power plant is installed on the reactor pressure vessel head by welding and interference fit.
核电站主设备控制棒驱动机构管座是通过焊接和过盈配合共同作用安装在压力容器顶盖上。
-
By applying the method from the ERICA (Environmental Risk from Ionising Contaminants: Assessment and Management) project, the authors are to make some prediction and assessment of radiological impact on the marine organisms near Yangjiang Nuclear Power Plant.
本文使用ERICA项目中推荐的辐射影响评价方法,对阳江核电厂运行后对附近海域中海洋生物的辐射影响进行预测和评价。
-
Two important directions in the development of proton linacs are high current proton linacs (mainly applied in nuclear power field) and compact proton linacs.
当前质子直线加速器发展的两个重要方向是强流质子直线加速器和小型质子直线加速器。前者主要用于核能领域,后者主要用于质子治疗。
-
Tems at nuclear power station,its partial functions are implemented in the KIT(centralized data acquisition and processing)system.
RIC系统是核电站的重要测控系统之一,其部分功能是在KIT系统中实现的。
-
The main research activities of the Department cover the general layout of hydro projects, hydraulics of spillways for high dams, energy dissipation and river bed or bank erosions, flow induced vibration, cavitation and air entrainment, river ice, hydraulic transient flow simulation and control on hydropower project, pumped storage project and long distance water transfer project, optimization of thermal/nuclear power plant and other industrial cooling systems, investigation of the fundamental theory of stratified/mixing flow and its applications, studies on fluid mechanics and thermodynamics of large scale cooling towers, hydraulic field observations for existing projects, development of instrumentation for physical model tests and field observations.
研究领域主要为水利水电枢纽总体布置、高坝泄洪建筑物水力学、消能防冲、流激振动、空化与空蚀、崩岸水力学与岸坡保护、河冰问题、水电站引水系统中的水力瞬变及调压井水力学研究、跨流域调水工程中的规划及水力控制数值仿真、冷却水的工程水力热力问题研究、环境水力学、火电厂水工模型试验与数值模拟研究、火电厂取排水局部泥沙冲淤试验、模型和原体监测仪器的研制和开发、以及过水现场原体监测。
-
S ., last year consumed some 12,700 short tons of processed natural uranium ore ( in the form of the oxide known as yellow cake , or U 3 O 8). It is estimated that by 1985, When nuclear power is scheduled to account for perhaps a fourth of the total U .
据估算,到1985年,核电预定达到美国总装机容量的1/4时,新鲜核燃料的消耗率会达到至少每年55,000美吨黄饼(假如有些使用过的核电料还能以再处理过的铀和钚的形式重新使用的话);最多每年62,000美吨黄饼。
-
When the nuclear power plant closes, where shall we put the radwaste?
核电站关闭的时候,我们要把核废料放哪儿?
-
Nuclear power plant thermal efficiency improvement, the design of the plant will become very complicated and complex systems must easier fault.
核能电厂的建厂投资成本非常大,任何设备发生故障,均会使电厂无法发电,将会对电力公司带来较大的财务损失。
-
HTRSC is not only helpful to the design, operation and training of the HTR 10, its construction method is also useful to the simulation system design of other types of nuclear power plaints.
目前世界上对高温气冷堆的工程仿真系统的研究还处于初始阶段,有关其动态特性和控制设计也没有完整成熟的资料可供借鉴。
-
According to the production example of cover flange forging used for one of mega-kilowatt nuclear power station reactor pressure vessel, focusing on the features of reactor pressure vessel forging, the influence factors control of important procedure in production quality is important.
以某百万千瓦级核电站反应堆压力容器顶盖法兰锻件的生产为例,针对锻件的特点,控制生产中重要工序的质量影响因素,过程控制中应注意的问题和避免出现质量问题的关键。
- 推荐网络例句
-
Singer Leona Lewis and former Led Zeppelin guitarist Jimmy Page emerged as the bus transformed into a grass-covered carnival float, and the pair combined for a rendition of "Whole Lotta Love".
歌手leona刘易斯和前率领的飞艇的吉他手吉米页出现巴士转化为基层所涵盖的嘉年华花车,和一双合并为一移交&整个lotta爱&。
-
This is Kate, and that's Erin.
这是凯特,那个是爱朗。
-
Articulate the aims, objectives and key aspects of a strategic business plan.
明确的宗旨,目标和重点战略业务计划。