英语人>网络例句>nuclear power plant 相关的网络例句
nuclear power plant相关的网络例句

查询词典 nuclear power plant

与 nuclear power plant 相关的网络例句 [注:此内容来源于网络,仅供参考]

The history of nuclear power development, the status of the third generation commercial nuclear power plant, the progress in the forth generation power system study, and the development prospect of controlled thermal nuclear fusion reactor are introduced in this paper.

回顾了核能发电技术的发展历程,介绍了第三代商用核电机组的发展目标和第四代核能利用系统的研发进展,以及可控热核聚变反应堆的发展前景。

Based on several studies concerned in the personality analysis and evaluation of nuclear power plant operators, a procedure and method of this research are identified and discussed to draw a fairly comprehensive picture of an operator's personality and to use personality data as predictors of a nuclear power plant operator performance.

基于国内外有关心理特质定量研究,提出了一套完整的程序和方法,来获取核电厂操纵员全面的心理特质定量数据及利用这些定量数据来评价操纵员的行为。

Qinshan nuclear power plant is the first nuclear power plant in China,it is very important for the nuclear power development in China.

秦山核电厂是我国自主建造的第一座核电厂,它对我国核电事业的发展有着重要的作用。

Pressurizer is an important componentin nuclear power plant, whose weight and dimension influence the weight, volume and arrangement of nuclear power plant.

稳压器是核动力装置中的重要设备,它的重量和尺寸是影响核动力装置重量体积及布置的重要因素。

This thesis uses DEA to compare the WANO's performance indicators among three nuclear power plants in Taiwan. We take the past 7 years'(1997-2003) data of 3 plants, there are 21 DMUs totally. Due to the importance of the nuclear power plant safety performance , we adopt the output estimation by assuming the input as a constant; Five outputs parameters such as unit capability factor, unplaned automatic scrams are chosen to proceed the comparison and get the relative efficiency. We also collect the WANO performance indicators data of the same type nuclear power plants as Taiwan in the United State during 1999-2003 to proceed the same comparison with the domestic three nuclear power plants , in order to understand the relative efficiency between two groups.

本文系利用数据包络分析法,针对台湾地区三座核能电厂之世界核能协会绩效指标的实绩进行实证比较,研究对象是以这三座电厂过去七年(1997--2003)来的实绩比较,每一年度为一个评估单位,共有21个DMUs,由於核能电厂安全绩效之重要性甚高,故本研究纯粹以产出项为考量的绩效评比方式,故将投入项设为常数;产出项则选取机组容量因数、非计划自动急停次数等五项参数,进行评比求出其相对效率;另外也收集了1999—2003年美国同型电厂之WANO绩效指标实绩进行比较,以了解国本国三座核能电厂相较於美国电厂之相对效率为何?

Chinese Nuclear Industry 23rd Construction Corporation(CNI23), as a synthetic equipment-installing company of Chinese nuclear industry system, was founded in 1958. Its main businesses are nuclear power engineering, nuclear engineering and national defense industry projects. It undertakes all the tasks of mainlands installation of nuclear facilities, and it also has gained the main contractor status of the domestic nuclear power plant projects and the market of nuclear engineering equipment installation.

中国核工业第二三建设公司作为我国核工业系统的综合性设备安装公司,自1958年成立以来以核电工程、核工程和国防军工工程建设为主营业务,承担了国内大部分核设施的安装施工任务,奠定了国内核电站工程、核工程设备安装市场的主要承包商地位。

The steam generator is one of main equipment of nuclear steam supply system of nuclear power plant. Monitoring U tube leakage rate of steam generator is necessary for keeping safe and economic operation of nuclear power plant.

蒸汽发生器是压水堆核电站核蒸汽供应系统的主要设备之一,对蒸汽发生器传热管进行泄漏监测关系到核电站的安全和经济运行。

Serialization and mass construction of nuclear power plants; active absorption of the third generation nuclear power technology; promotion of inland nuclear power construction; development of fast breeder nuclear power plant; and establishment of nuclear fuel cycle system.

指出了我国核电可持续发展的几个重要问题,即核电发展要实现系列化规模化;积极消化吸收第三代核电技术;大力推进内陆核电站的建设;开发快中子增殖堆核电站,构建核燃料循环体系等。

After detailed analyse the main accident of primary loop of nuclear power plant, and refer to accident operation procedure of the nuclear power plant, the thesis raise the abnormal guide operation of steam generator heat transfer tube rupture accident.

本论文在详细分析了核动力装置一回路系统主要事故的基础上,参照核电厂的事故处理规程,提出了蒸汽发生器传热管破裂事故的处理规程。

Simulation on steam system of the secondary loop of nuclear power plant is an important part of research of real-time, whole range, whole functional simulation of nuclear power plant.

核动力装置二回路蒸汽系统仿真是核动力装置实时、全范围、全功能仿真机研制工作的重要组成部分。

第1/13页 1 2 3 4 5 6 7 8 9 ... > 尾页
推荐网络例句

By the time of its fall, most of the prisoners were writers who had written against the corruptions of the government.

到它被攻陷的时候,里面多数的犯人是写了反对政府贪污文章的作家。

The most obvious variation to ovum morphological character was that the color was changed from light green to sepiaceous in embryonic development, and all the ovums were almost hatched after 96h.

在胚胎发育过程中卵的形态特征最明显的变化是颜色从淡绿到深褐色,卵在发育96h后卵基本全部孵化。

There was a conflict between plebs and patricians in ancient Rome in 494BC.

在公元前494年,罗马发生了一次平民反对贵族的斗争。