查询词典 mud pie
- 与 mud pie 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
For oil drilling, oil and gas wells in the circulation rotary drilling mud to increase agent, cooling the bit, cutting away material from the debris, lubricating the drill pipe, closed hole wall, oil and gas pressure control to prevent the oil from the spray.
用于石油钻探,油气井旋转钻探中的环流泥浆加重剂,冷却钻头,带走切削下来的碎屑物,润滑钻杆,封闭孔壁,控制油气压力,防止油井自喷。
-
The results of the study showed that it was advisabled that the red mud insteaded clunch to be covering material.
试验结果表明:处理后的赤泥和脱附液赤泥在垃圾填埋场做覆盖层代替粘土是可行的。
-
One, go up in existing foundation, farther perfect craft and equipment make oil be with colza raw material exemple, a lot of more current medium or small oily factory did not provide the facility that humeral mud makes the same score in special purify colza, and the other clear miscellaneous equipment that covers suitably to it.
一、在现有基础上,进一步完善工艺与设备以菜籽原料制油为例,目前很多中小型油厂都没有配备专门的去除菜籽中平肩泥的设备,以及与之相配套的其他清杂设备。
-
She smashed a chamberlain just as she smashed a flask or a comfit box, and she made filth of him, reduced him to a heap of mud at a street corner.
娜娜听到过关于乔治的好消息,他现在处在康复期,他在丰岱特与他母亲在一起。
-
A concertgoer rolled around in the mud during the All Points West music festival at Liberty State Park in Jersey City, N.J., Sunday.
泥打滚:上周日,在美国新泽西州自由州立公园内举行的All Points West音乐节上,一名音乐迷在泥浆中打滚。
-
Introduced are specialities,structures and parameters of some newly developed well logging tools used by eminent well logging companies in the past few years,such as the new 3-D electrode-type logging tool,the new asymmetrical array induction logging tool,the new micro-resistivity pad tool,the oil-based mud imaging tool,the novel through-casing resistivity tool,the formation tester with an oval pad,the ArmadaTM sampling system and the ConneX perforating system.
介绍了国外测井公司近年来推出的电缆测井新技术以及新型或改进型测井仪器的特点、结构组成及工作参数。主要包括:新型3D电极电阻率测井仪器、新型阵列感应测井仪器、新型微电阻率极板仪器、油基泥浆成像仪器、低污染流体采样技术、新一代油管传送流体采样系统、具有椭圆形极板的地层压力测试仪器和ConneX射孔系统。
-
They stem at the site of a knife brick repair brick wood, I just pick mud coolie, they are right, I get upset.
他们在工地上干的是用刀砖葺砖的活,我只是个挑泥浆的小工,他们都对我冷嘲热讽。
-
This would have been no serious hindrance on a week - day ; they would have clicked through it in their high pattens and boots quite unconcerned ; but on this day of vanity , this sun s - day , when flesh went forth to coquet with flesh while hypocritically affecting business with spiritual things ; on this occasion for wearing their white stockings and thin shoes , and their pink , white , and lilac gowns , on which every mud spot would be visible , the pool was an awkward impediment . they could hear the church - bell calling - as yet nearly a mile off
在平常的日子里,这并不是什么大不了的障碍她们都是穿的高底木头套鞋和靴子,可以满不在乎地从水中趟过去但是这天是礼拜天,是她们抛头露面的日子,她们口头说的是去进行精神上的陶冶,而实际上是去进行肉体征服肉体的谈情说爱这个时候她们都会穿上白色的袜子和轻俏的鞋,有的穿粉红的连衣裙,有的穿白色的连衣裙,有的穿淡紫色的连衣裙,只要上面溅上了一点儿泥都能被人看见这片水塘把她们挡住了,叫她们犯了难。
-
The main environment geological question is: The earth"s crust where the faultage and earthquake are active is unstable; collapse , landslide, mud-rock flow and soil erosion ; The underground karst subsides, seepage question; Basic rock expand, expend and compress soil body, the salt deposit corrode out of shape and groundwater"s corrodent harm; The soft soil question of basin; The soft rock body, cracked rock and the weathering rock are relatively poor stability; High and cold regional highways and railways" frozen soils freeze and melt calamity problem; The around rock of tunnel are unstable because of the coal seam gas, spring water, underground developed area; Project cutting slopes, constructed abandon soil and reservoir, lake"s ecology geological environmental protection issue; Thedangerous shoal of the channel % submerged reef question; The problem of rebuilding channel project and dock etc.; And the problem of unstable ground and groundwater corrosivity during building airport; At the same time, with the international big pathways" implementation and completions of constructions, adjusting the cities and counties" constructions , the crowd occupy changing , the cultivated land distribute changing and the adjustments of structure, will cause local environmental geological issues outstanding; According to multiple statistical analysis , value calculate and integrated appraise result, in the northwest and southwest of Yunnan, the traffic relatively low density, traffic engineering is relatively weak impact on environment, It is the area where a environme
主要的环境地质问题是:活动性断裂、地震带的地壳不稳定;崩塌、滑坡、泥石流及水土流失;地下岩溶塌陷、渗漏问题;基础岩体膨胀、胀缩土体、含盐层侵蚀变形和地下水的腐蚀危害;盆地软土问题;软弱岩体、碎裂、风化岩体稳定性较差;高寒地带公路、铁路建设的冻土冻融灾害问题;煤层瓦斯、涌水、地下采空区等隧道围岩不稳定问题;工程切坡、施工弃土及水库、湖泊生态地质环境保护问题;航道险滩、暗礁问题;渠化工程、码头等库岸再造问题;以及机场建设中的不稳定地基及地下水腐蚀性问题;同时,随着大通道建设的实施和完成,城镇建设的调整、人群居落的变化和耕地分布及结构的调整组合,都可能造成局部环境地质问题的突出等等。经多元统计分析数值计算、综合评价结果,滇西北、滇西南地区交通密度较低,交通工程对环境的影响程度较弱,是环境地质状况好的区域;有主要高原湖泊分布区的,包括昆明、个旧、文山的滇东南区域,环境地质状况较好;大姚、楚雄、篙明及会泽、昭通一镇雄的区域,即滇中北部中生界红层和滇东北岩溶区,环境地质状况中等;而包括保山、德宏、大理、临沧的滇西地区及景东一墨江以东、双柏一石屏一河口以西及东川一寻甸一曲靖地段的滇中一滇东地区,环境地质状况较差。云南国际大通道建设涉及全省区域,如何利用地质环境、实现可持续发展,就必须依赖于国际大通道建设与地质环境之间良性关系的建立。应本着对区域地质环境客观存在的科学认识原则、建设过程中环境效益优先的可持续发展原则、法制性原则、对大通道建设中环境地质的因地制宜及其可防治性原则。并且从组织管理、不同类型大通道、不同环境地质问题类型等方面,提出了对策措施。最后,提出了建立国际大通道建设与环境地质良性关系的宏观建议。
-
Julian lives in a small mud house, it has a corrugated iron roof and the doors and windows have wooden frames.
它的屋顶是瓦楞铁,门框和窗棱都是木头的。
- 相关中文对照歌词
- Monsters Of Mud
- The Mud Shark
- Mud Digger
- Picha Pie
- Kickin' Up Mud
- Mud
- Gas And Mud
- Vicinity Of Obscenity
- Key Lime Pie
- Helicopter
- 推荐网络例句
-
He paid $5,000 for this cupcake.
他我这个纸杯蛋糕花了5000美元。
-
I mean, if you want to, that is
我的意思是,如果你们想吃的话。
-
In addition to his fee, he would be awarded an unaltered clone of himself.
除了费用,他将获得一个不作任何改造的克隆体。