查询词典 monitor system
- 与 monitor system 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Through the effective test point arrangement, the gaging instrument embedment and the observation, establishes the reliable monitor system, guarantees this project the security and the stability.
通过有效的监测点的布置,量测仪表的埋设与观测,建立可靠的监测体系,确保该工程的安全与稳定。
-
This paper illustrates the hardware structure and software design of the temperature monitor system.
同时给出了温度监控系统的硬件结构和软件设计。
-
Memory Improve Master is an intellectualized and easy-to-use application designed to optimize and monitor system memory.
记忆提高大师是一个智能化和易于使用的应用而设计的优化和监控系统的软件体。
-
Through lucubrating the CAN protocol, establishs the application layer protocol of CAN aiming the Monitor System.
通过深入研究CAN协议,针对本系统完成了CAN应用层协议的制定;对本监测系统子模块的电路原理和功能进行了深入浅出的分析,完成了系统的各功能模块的试验。
-
In order to solve the frost heave and thaw settlement, the model tests were made in Tibetan Plateau. Two kinds of model were designed to horizontal drain structure embankment and the ventilation embankment in suit. The effect of horizontal plastic drain was analyzed in contrast with the ventilation embankment. The mechanisms of horizontal plastic drain were studied in permafrost, such as gravity draining in the superficial layer and structure stiffing in the embankment in the theory. According to the design theory, the parameters of horizontal plastic drain were confirmed in the embankment. The values of deformation were inspected by fiber monitor system in the permafrost embankment.
为了解决青藏高原的冻土浅层雨季雨水下渗和蒸发所产生的冻土冻胀与融沉问题,在青藏高原开展水平排水板结构性路基和普通通风路基的原位模型对比试验,并从理论上探讨水平排水板在多年冻土路基中浅层重力排水和结构加劲的作用机理,确定水平排水板的铺设参数;运用光纤监测技术对水平排水板在多年冻土路基中的变形进行监测,对比分析水平排水板铺设与否这2种条件下冻土路基变形监测结果。
-
Two kinds of model were designed to horizontal drain structure embankment and the ventilation embankment in suit. The effect of horizontal plastic drain was analyzed in contrast with the ventilation embankment. The mechanisms of horizontal plastic drain were studied in permafrost, such as gravity draining in the superficial layer and structure stiffing in the embankment in the theory. According to the design theory, the parameters of horizontal plastic drain were confirmed in the embankment. The values of deformation were inspected by fiber monitor system in the permafrost embankment.
摘 要:为了解决青藏高原的冻土浅层雨季雨水下渗和蒸发所产生的冻土冻胀与融沉问题,在青藏高原开展水平排水板结构性路基和普通通风路基的原位模型对比试验,并从理论上探讨水平排水板在多年冻土路基中浅层重力排水和结构加劲的作用机理,确定水平排水板的铺设参数;运用光纤监测技术对水平排水板在多年冻土路基中的变形进行监测,对比分析水平排水板铺设与否这2种条件下冻土路基变形监测结果。
-
In monitor system, it can be connected with various decoders
在监控系统中可以与各种解码器连接使用,包括云台
-
Analysing the main problems in installing gas monitor system, some countermeasures are put foreward,and a upgrade product is introduced.
对目前瓦斯监测系统安装中存在的主要问题进行了分析,提出了一些解决办法,并介绍了一种升级产
-
A monitor system of two dimensions magnetic flux leakage testing equipment for the steel tube has been studied in this paper.
本文对整个&钢管二维漏磁检测设备监控系统&做了探讨。
-
In this paper,first of all,we discuss the basic theory of the two dimensions magnetic flux leakage testing,which is the basic of the design of "the monitor system of two dimensions magnetic flux leakage testing equipment for the steel tube ".
在本文中首先讨论了二维漏磁检测法的基本原理,这是&钢管二维漏磁检测设备监控系统&设计的基础。
- 推荐网络例句
-
On the other hand, the more important thing is because the urban housing is a kind of heterogeneity products.
另一方面,更重要的是由于城市住房是一种异质性产品。
-
Climate histogram is the fall that collects place measure calm value, cent serves as cross axle for a few equal interval, the area that the frequency that the value appears according to place is accumulated and becomes will be determined inside each interval, discharge the graph that rise with post, also be called histogram.
气候直方图是将所收集的降水量测定值,分为几个相等的区间作为横轴,并将各区间内所测定值依所出现的次数累积而成的面积,用柱子排起来的图形,也叫做柱状图。
-
You rap, you know we are not so good at rapping, huh?
你唱吧,你也知道我们并不那么擅长说唱,对吧?