英语人>网络例句>mining 相关的网络例句
mining相关的网络例句

查询词典 mining

与 mining 相关的网络例句 [注:此内容来源于网络,仅供参考]

The MG400/920-WD type mining machine is that a kind of electricity draws the high-power mining machine, this machine fuselage is low, Installation is large in power, all electrical machineries are fixed up horizontally, mechanical drive is all the transmission of straight tooth, electrical machinery, walk case drive wheel package etc.

MG400/920-WD型采煤机是一种电牵引大功率采煤机,该机机身矮,装机功率大,所有电机横向布置,机械传动都是直齿传动,电机、行走箱驱动轮组件等均可从老塘侧抽出,故传动效率高,容易安装和维护。

ABSTRACT:The MG250/591-WD type mining machine is that a kind of electricity draws the high-power mining machine, this machine fuselage is low, Installation is large in power,all electrical machineries are fixed up horizontally, mechanical drive is all the transmission of straight tooth, electrical machinery, walk case drive wheel package etc.

摘 要:MG250/591-WD型采煤机是一种电牵引大功率采煤机,该机机身矮,装机功率大,所有电机横向布置,机械传动都是直齿传动,电机、行走箱驱动轮组件等均可从老塘侧抽出,故传动效率高,容易安装和维护。

The MG700-WD mining machine is a kind of electricity drawing and high-power mining machine, this machine's fuselage is low, installation-power is large, all electric motor are fixed up horizontally, mechanical drive is all the transmission of gear, electric motor、walking case drive wheel package etc, can take from old pool side out, so the transmission is high in efficiency, easy to install and maintain.

分类: 机械设计,模具,数控论文编号:JX414 包括设计图,说明书字数:22278。页数:75MG700-WD型采煤机是一种电牵引大功率采煤机,该机机身矮,装机功率大,所有电机横向布置,机械传动都是直齿传动,电机、行走箱驱动轮组件等均可从老塘侧抽出,故传动效率高,容易安装和维护。

The MG700-WD mining machine is a kind of electricity drawing and high-power mining machine, this machine's fuselage is low, installation-power is large, all electric motor are fixed up horizontally, mechanical drive is all the transmission of gear, electric motor、walking case drive wheel package etc, can take from old pool side out, so the transmission is high in efficiency, easy to install and maintain.

以下为资料的部分内容,如需要全部资料请点击获取全文点击进入支付宝和网上银行快速付款通道也可咨询客服 QQ:893628136 QQ:136775125论文编号:JX414 包括设计图,说明书字数:22278。页数:75MG700-WD型采煤机是一种电牵引大功率采煤机,该机机身矮,装机功率大,所有电机横向布置,机械传动都是直齿传动,电机、行走箱驱动轮组件等均可从老塘侧抽出,故传动效率高,容易安装和维护。

Finally, the achievement is applied in Shendong mining area to study the failure law of underground-induced strata and the characteristics of water-flowing fractured zone for making scientific policy-making basis to realize mining safety, environment protection and underground water protection.

最后,把这一成果应用于神东矿区,对该区采动覆岩的破坏规律、导水裂隙带的发育特征进行了初步研究,为矿区煤炭资源的安全开采和环境保护、地下水资源保护提供了科学决策依据。

The MG700-WD mining machine is a kind of electricity drawing and high-power mining machine, this machine's fuselage is low, installation-power is large, all electric motor are fixed up horizontally, mechanical drive is all the transmission of gear, electric motor、walking case drive wheel package etc, can take from old pool side out, so the transmission is high in efficiency, easy to install and maintain.

以下为资料的部分内容,如需要全部资料请点击获取全文论文编号:JX414 包括设计图,说明书字数:22278。页数:75MG700-WD型采煤机是一种电牵引大功率采煤机,该机机身矮,装机功率大,所有电机横向布置,机械传动都是直齿传动,电机、行走箱驱动轮组件等均可从老塘侧抽出,故传动效率高,容易安装和维护。

Mining panel at Kangjiawan lead, zinc and gold mine in the Bureau of Mines of Shuikoushan.(4) In order to mine No. 12, No. 14, No. 15 and No. 16 rooms safely, a mining system of upward slicing and filling with cemented tailings was designed. The system was used to mine the rooms safely and great economic benefits were obtained.

为了确保Ⅲ—1采场12~#、14~#、15~#、16~#矿房的安全回采,设计了上向水平分层胶结充填采矿法,并应用该采矿方法实现了12~#、14~#、15~#、16~#矿房的安全回采,取得了巨大的经济效益和社会效益。

1If it transfers all the rights and interests of a mining area, the difference between the transfer income and the book value of the rights and interests of the mining area shall be recorded in the profits and losses of the current period.

转让全部探明矿区权益的,将转让所得与矿区权益账面价值的差额计入当期损益。

2If it transfers all the rights and interests of an unproved mining area, for which it calculates the impairment separately, the difference between the transfer income and the book value of the rights and interests of the unproved mining area shall be recorded in the profits and losses of the current period.

转让单独计提减值准备的全部未探明矿区权益的,转让所得与未探明矿区权益账面价值的差额,计入当期损益。

Data mining in time series has been one of the focuses of current data mining research.

对时间序列进行数据挖掘具有重要的意义,已成为当前研究的焦点之一。

第37/100页 首页 < ... 33 34 35 36 37 38 39 40 41 ... > 尾页
相关中文对照歌词
New York Mining Disaster 1941
New York Mining Disaster 1941
Mining For Gold
Mining For Coal
Red Hill Mining Town
New York Mining Disaster 1996
推荐网络例句

It has been put forward that there exists single Ball point and double Ball points on the symmetrical connecting-rod curves of equilateral mechanisms.

从鲍尔点的形成原理出发,分析对称连杆曲线上鲍尔点的产生条件,提出等边机构的对称连杆曲线上有单鲍尔点和双鲍尔点。

The factory affiliated to the Group primarily manufactures multiple-purpose pincers, baking kits, knives, scissors, kitchenware, gardening tools and beauty care kits as well as other hardware tools, the annual production value of which reaches US$ 30 million dollars.

集团所属工厂主要生产多用钳、烤具、刀具、剪刀、厨具、花园工具、美容套等五金产品,年生产总值3000万美元,产品价廉物美、选料上乘、质量保证,深受国内外客户的青睐

The eˉtiology of hemospermia is complicate,but almost of hemospermia are benign.

血精的原因很,以良性病变为主。