英语人>网络例句>mine 相关的网络例句
mine相关的网络例句
与 mine 相关的网络例句 [注:此内容来源于网络,仅供参考]

Form the theory to say, if we inspect things well, controllable circulatory ventilation can bring enough fresh air to circulatory places so that coal mine can produce safely. We study the coalface 66 in Jingting coal mine.

从理论上讲,应用可控循环通风,只要监测监控措施得力,保证有足够的新鲜风量进入循环区域,则可保证在可控循环通风情况下,矿井的安全生产。

Take the 51201 big mining height coalface in Shangwan coal mine and the 32201 coalface in Bulianta coal mine as prototypes, the development processes of the overlying strata for these two types shallow coal face with big mining height are simulate, as the mining space increase.

分别以上湾煤矿的51201工作面和补连塔32201工作面为原型,模拟了随开采空间变化,这两类浅埋煤层大采高长壁工作面的采动覆岩导水通道的发育过程。

A lot of people did a lot of experiments, and some say knives than mine split decision, and if I may say so, the ruling fathers murder weapon or weapons can be no substitute for the last time I hit weapons are also mentioned, even if much to your knife slightly split 13-30 Lei, how lucky you have this decision not to hit 5 of them, 30 of mine that you can only split a knife and smashed the powerful weapons, but also is a symbol of wealth and status only .

也有很多人做过很多实验,有的说雷裂刀比裁决好,要是我说的话,普天之下杀人武器还是裁决没有任何武器可以取代,上次砸武器的时候我也提到过,就算你厉害把雷裂刀砸成13-30,你有这运气怎么不把裁决砸5下呢,30的雷裂刀只能证明你砸武器的厉害,而且也就是一种财富与地位的象征而已。

This text aims at the difference of several representative geology conditions in Yang Shui mining area, carried on the primary election to the mining method of Yang Shui mining area, introduced the new theories of numerical optimization choice of mining method that are fuzzy mathematics and artificial neural network etc, based on the existing mining methods that are feasible, adopt the fuzzy optimization choice principle of flexible neural networks, and synthesize several experts and fieldworkers' opinion, built up the related mathematical model and revised model, carried on processing of programming through computer, thus established each optimization mining project under several representative geology conditions in Yang Shui mining area, and carried on optimizing to the existent unreasonable parameter in mining project;have the great significance to aim at each kind of geology condition for each mining area to adjust the mining method in time in the course of mining, abandon chronically unreasonable mining method, full reclaim the mine's resource, lower the dilution rate、 loss rate of mineral mining, raise the production capacity of stope and economic benefit of mine.

本文针对洋水矿区几种典型地质条件差异,对洋水矿区采矿方法进行了初选,介绍了模糊数学和人工神经网络等采矿方法数值优选新理论,在现有可行性采矿方法的基础上,采用弹性神经网络模糊优选原理,并综合多位专家及现场工作者的意见,建立了相关的数学模型及修正模型,通过计算机进行编程处理,从而确立了洋水矿区几种典型地质条件下各自的最优采矿方案,并针对采矿方案中存在的不合理参数进行了优化,为各矿区针对各类地质条件在采矿过程中及时调整采矿方法,摈弃习惯性的不合理采矿方法,充分回收矿山资源、降低矿石开采的贫化率、损失率,提高采场生产能力以及矿山经济效益具有重大意义。

What's mine is mine, and what's Liam's I give him half of.If we weren't in a band, we'd be having rows in the house. If we had a greengrocers, Gallagher's Greengrocers, we'd argue over which way to set out the apples or pears.I don't have a bad word to say about 'Be Here Now' The only person who's got a problem is Noel.

还有很多实例了,不一一列举,只是觉得这俩小子真的很任性,任着年轻张狂,任着音乐上的辉煌……不过,说到底了,他们的确很优秀,包括队里英国摇滚史上最好的吉他手之一的Andy Bell和乐队的旋律吉他手Gem Archer。

The development of coal mine production mechanization increasingly requires power supply of the low-tension network in mine to keep higher and higher continuity , security and reliability , also puts forword high demand to the measurement and protection of the power supply device feedback switch .

随着矿井生产机械化水平日益提高,对矿井低压电网的供电连续性,安全性及可靠性要求越来越高,也对供电设备馈电开关检测与保护提出高的要求。

In addition, the mine is a major upgrade of equipment and Machinery- electrical equipment, the cost and power consumption isrelatively high, therefore, the design of the new and old mineshaft into the design, determine a reasonable upgrade system, mustgo through various technical Economy, with the specific conditionsof the mine to ensure that upgrading equipment in the selection andoperation of the two aspects are reasonable, which called for mineequipment upgrade of an economic nature.

此外,矿山提升设备是一大型的综合机械-电气设备,其成本和耗电量比较高,所以,在新矿井的设计和老矿井的改建设计中,确定合理的提升系统时,必须经过多方面的技术经济比较,结合矿井的具体条件,保证提升设备在选型和运转两个方面都是合理的,即要求矿井提升设备具有经济性。

The reclamation mode of Qidashan iron mine may provide a practical mode and good demonstration for domestic metallic mine reclamations.

齐大山矿山复垦模式的总结为我国金属矿山复垦提供了实践例证,也能够起到良好的示范作用。

However, the scaled exploration and usage of coal come with the mine gas blast, roof fall, water permeating, the death of mine workers and the smog hanging over London and Maas Valley.

然而与煤炭的大规模开采和应用相伴的是煤矿瓦斯爆炸、冒顶、透水和矿工死亡,是笼罩在伦敦和马斯河谷上空不散的烟雾。

Yaoqiao owns coal mines, coal hole, Xu Mine, Longdong mine coal production, as well as four pairs of Tatun徐沛coal preparation plant and rail management and the acquisition of the controlling shareholder group Tatun coal power and after the new power generation business assets, in addition to the industry chain will also extend to the downstream, holding 75% of the production of electrolytic aluminum Tatun.

公司拥有姚桥煤矿、孔庄煤矿、徐庄煤矿、龙东煤矿四对生产矿井以及大屯选煤厂和徐沛铁路管理处,并收购了控股股东大屯煤电集团的电力及有关资产后新增火力发电业务,此外公司还将产业链向下游延伸,控股75%的大屯铝业生产电解铝。

第45/100页 首页 < ... 41 42 43 44 45 46 47 48 49 ... > 尾页
相关中文对照歌词
Mine All Mine
Mine All Mine
Mine All Mine
Mine, All Mine
Mine, Mine, Mine
Mine All Mine
Mine All Mine
Mine All Mine
Mine All Mine
What's Mine Is Mine
推荐网络例句

This one mode pays close attention to network credence foundation of the businessman very much.

这一模式非常关注商人的网络信用基础。

Cell morphology of bacterial ghost of Pasteurella multocida was observed by scanning electron microscopy and inactivation ratio was estimated by CFU analysi.

扫描电镜观察多杀性巴氏杆菌细菌幽灵和菌落形成单位评价遗传灭活率。

There is no differences of cell proliferation vitality between labeled and unlabeled NSCs.

双标记神经干细胞的增殖、分化活力与未标记神经干细胞相比无改变。