英语人>网络例句>mill-owner 相关的网络例句
mill-owner相关的网络例句

查询词典 mill-owner

与 mill-owner 相关的网络例句 [注:此内容来源于网络,仅供参考]

Through the calculation and analysis for additive stress of main reducing gear's fast speed shaft in three high mill of Jisteel medium plate plant,expounds that the additive stress produced in the pro cess of working of parts for rolling mill, shearer and blanking press with balance wheel to the influence of shaft's strength is not to be ignored.

通过对济钢中板厂三辊轧机主减速机高速轴的附加力的计算与分析,阐明轧机,剪切机,冲压机械等带飞轮的部件在工作过程中所产生的附加应力对轴强度的影响是不应忽视的,在设计,维护和修理时要加以注意。

Which are the overalls tools and the vertical mill head on the boring mill,the thesis has made a pratical technology designment of the main chains gear profile process.

通过对带冷机主动链轮部件的加工难度分析,根据设备能力并利用定位胎、定位板、压板、弯板等工装治具及镗床上的立铣头,设计了切实可行的主动链轮齿形加工工艺方案,对同类产品的加工具有深远地指导意义。

According to the circumstances and running characteristics of the ball mill in the cement plants, the study of the control strategies for the ball mill is also accomplished.

本文详细论述了水泥厂微机配料与负荷控制系统的软、硬件设计,并针对水泥厂球磨机的运行环境和工作特点,深入研究了适合于水泥厂球磨机的控制策略。

Tfo enlarge mill already become the developmental tread,and accordingly there are huge development have gained in the aspect of mechanical structure of cement mill.

其中,球磨机大型化成为发展趋势,并且相应地在水泥工业用球磨机的机械结构改进方面取得了很大的发展。

And then the author explained that the worry was totally unnecessary by comparing the performance of vertical mill cement and ball mill cement produced by three foreign cement corporations and as well as the related concrete.

基于此,作者进行了国外三家水泥企业立磨水泥和球磨水泥的性能对比及其配置的混凝土性能对比,说明此种担忧是完全不必要的。

The author analysed the key factor that why vertical mill grinding cement has not been start yet in China-the worry about the performance of the vertical mill cement inside the industry.

作者分析了立磨磨水泥在我国尚未启动的主要问题:是业内对立磨水泥性能存在有担忧。

It has been popularized in China to grind raw meal in vertical mill, meanwhile, to grind cement with vertical mill also is popular in Western nations.

立磨磨生料在我国已普及,磨水泥则在欧美也已普及。

At present the two systems has passed the 72 h test as the output of the No.1 mill is 164 t/h and that of the No.2 is 160t/h, the specific surface of the product is 320-330 m^2/kg and the temperature of the cement coming out of the mill is 70℃, all of which reached or exceed the design index.

这两套水泥磨粉磨系统目前均已顺利通过72h的性能考核测试,其中:平均台时产量分别为164t/h(1磨)和160t/h(2磨);比表面积为320-330平方公尺/kg;出磨水泥温度约70℃,均达到并超过设计指标。

As the hoist is a chain of relations with the mill, skip hoist will stop after the mill downtime.

由于该提升机与磨机是连锁关系,提升机跳停后磨机同样会停机。

Based on the physical characteristics of chatter marks, the interaction between marks and vibration of rolling mill is described. The effect of rollers, work roller bearings, spindle coupling clamp and roll grinding machines on chatter marks was studied with vibration measurement and mode analysis for both mill and roll grinding machine.

从振动纹的物理特征分析入手,阐述了振动纹与轧机振动之间的关系,通过对轧辊与磨床的振动测试和模态分析研究了轧辊辊系、工作辊轴承、主传动接轴和轧辊磨床对振动纹的影响。

第24/100页 首页 < ... 20 21 22 23 24 25 26 27 28 ... > 尾页
相关中文对照歌词
Olde Mill Inn
Down By The Old Mill Stream
Down By The Old Mill Stream
Run Of The Mill
Run Of The Mill
Grist For The Malady Mill
US Mill
Tilting At The Mill
Rumor Mill
Rumor Mill (Acoustic Version)
推荐网络例句

However, as the name(read-only memory)implies, CD disks cannot be written onorchanged in any way.

然而,正如其名字所指出的那样,CD盘不能写,也不能用任何方式改变其内容。

Galvanizes steel pallet is mainly export which suits standard packing of European Union, the North America. galvanizes steel pallet is suitable to heavy rack. Pallet surface can design plate type, corrugated and the gap form, satisfies the different requirements.

镀锌钢托盘多用于出口,替代木托盘,免薰蒸,符合欧盟、北美各国对出口货物包装材料的法令要求;喷涂钢托盘适用于重载上货架之用,托盘表面根据需要制作成平板状、波纹状及间隔形式,满足不同的使用要求。

A single payment file can be uploaded from an ERP system to effect all pan-China RMB payments and overseas payments in all currencies.

付款指令文件可从您的 ERP 系统上传到我们的电子银行系统来只是国内及对海外各种币种付款。