查询词典 maximum problem
- 与 maximum problem 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
In this paper, we focused on the Thermal Power Generator unit commitment optimization. A mathematical model is presented and consuming minimization of generator is chosen for its objective function, with the power balance, generation capacity limits, maximum allowable start and stop times limits and time limits taken into consideration. The unit commitment optimization is constrained minimization problem.
本文主要对火电机组优化组合问题进行了研究,提出了机组优化组合的数学模型,该模型以发电总成本最小为目标函数,同时考虑了功率平衡约束、机组输出功率上、下限约束,机组最大允许启停次数和时间约束等约束条件。
-
This mode Circular Economy,the model of economic development,utilizing resources and protecting the environment to the maximum extent,is the best way of our time to solve containable development problem,it is also the requirement of our country economy develop into certain objective of stage.
循环经济作为一种最大限度地利用资源和保护环境的经济发展模式,是当今世界解决可持续发展问题的最佳途径,也是我国经济发展到一定阶段的客观要求。
-
The LMI toolbox is introduced in detail, and a maximum delay bound is obtained by solving a corresponding convex optimization problem.
介绍了如何利用MATLAB软件中的LMI工具箱进行分析与设计,据此计算出最大的允许时滞界。
-
As a result, it shows thatthe static or dynamic subsystem optimum alone is not equal to the system optimum. Three initial value problems met in the optimal design of flying vehicle are studied andconclusions are derived that: orthogonal test method can be adopted to decide the initial valueof static optimization problem, some mathematical techniques can be used to deal with thecostate variables of Maximum Principle and decide the initial value of the costate variable,the indirect method can be used to get the analytical solution under ideal case to guide thechoice of the initial control curve in the direct method. With some numerical examples oftrajectory optimization, it shows that all these methods are useful not only in accelerating theconvergence but also in converging to the global optimum.
针对飞行器优化设计中的三种初始值问题进行了研究,以远程弹道导弹弹道的工程优化为例说明,对于静态优化问题,采用正交试验法选取初始值,不仅可以大大加快收敛的速度,而且更有可能收敛到全局最优解;以气动力辅助变轨问题为例说明,用共态变量的一阶泰勒级数展开可以解决极大值原理中共态变量初值难于确定的问题;以二级弹道导弹的主动段弹道优化为例说明,利用间接法在理想情况下得到的解析解来指导直接法初始控制曲线的选择,将大大有利于提高直接法的收敛速度。
-
In allusion to the problem how to determine the optimal number and locations of traffic counting points in estimating OD matrix by road flows, the improved location rules for traffic counting points are proposed according to the concept of maximum possible relative error: path covering rule and minimal traffic counting point rule.
针对OD反推中路段检测点设置问题,结合最大可能相对误差概念,提出了改进的路段检测点设置原则:路径覆盖原则和最少检测点原则。
-
Demands on middle-distillates selectivity have become increasingly severe; and a key problem to improve catalyst technology is how to achieve objectives for maximum middle-distillates selectivity To assess the catalytic performance of hydrocracking catalysts, a new laboratory method using decane as the model compound was develo...
本文首先建立了一种以正癸烷为模型化合物的微反评价方法,其中微反转化率与中型活性呈线性关系;采用回归方程可以拟合出中间馏分油选择性。
-
Given a ring and a set of communication requests. Each request is represented by a pair of nodes, and associated with a profit. To satisfy a request in the undirected ring, we need to determine a path between the two nodes of the request in the ring. To satisfy a request in the directed ring, we need to determine a directed path from the source to the destination of the request in the directed ring. The goal of the call admission control problem is to determine and satisfy a maximum profit subset of the requests such that for every edge of the ring, the number of satisfied requests that are routed through the edge does not exceed the capacity of the edge.
要在无向环中实现一个呼叫,需在环中指定该请求所对应的两个顶点之间的一条路,要在有向环中实现一个呼叫,需在环中指定该请求的源节点到目的节点的一条路,环网络呼叫接纳控制问题的目标是确定最大利润的呼叫子集,在环中实现该子集中的每一个呼叫,使得经过每一边的呼叫的数目不超过该边的容量,对于无向和有向环网络呼叫接纳控制问题,我们均首次给出了多项式时间近似方案。
-
The main problem in the existing system is that maximum power control is separate from charging and discharging control.
上述系统主要的问题是缺乏最大功率跟踪控制和蓄电池充放电控制的统一考虑。
-
We present the Maximum Disjoint Sets for Maintaining Coverage and Connectivity problem, and we prove it is NP-complete.
在这一章节中我们将介绍保证覆盖和连同的最大化不相交节点结合问题,同时我们证明这个问题是NP完全的。
-
Because the director and the length of the next guide in the maximum length between, so as result of the lateral process logistics cocks movement is not a problem, but this type of director the required tolerance, unlike the double top stem guide as strict.
因为上导向器和下导向器之间的长度位于最大长度,因此由于工艺物流造成的侧向旋塞运动不是一个问题,而且这种类型的导向器所要求的容许偏差,不像双顶部阀杆导向器的那样严格。
- 推荐网络例句
-
On the other hand, the more important thing is because the urban housing is a kind of heterogeneity products.
另一方面,更重要的是由于城市住房是一种异质性产品。
-
Climate histogram is the fall that collects place measure calm value, cent serves as cross axle for a few equal interval, the area that the frequency that the value appears according to place is accumulated and becomes will be determined inside each interval, discharge the graph that rise with post, also be called histogram.
气候直方图是将所收集的降水量测定值,分为几个相等的区间作为横轴,并将各区间内所测定值依所出现的次数累积而成的面积,用柱子排起来的图形,也叫做柱状图。
-
You rap, you know we are not so good at rapping, huh?
你唱吧,你也知道我们并不那么擅长说唱,对吧?