英语人>网络例句>matches 相关的网络例句
matches相关的网络例句

查询词典 matches

与 matches 相关的网络例句 [注:此内容来源于网络,仅供参考]

We have had some difficult matches and we are still in it at the semi-final stage.

&我们有过艰难的比赛,而且我们还只是进入了半决赛。&

You should sleep on a bed with a mattress that matches and supports your spines natural curves.

你应该睡在一张床,床垫匹配,并支持您的spine s自然曲线。

REPORTER: Yes, Ashray Giles who finished that series in England with 10 wickets as England regain the Ashes. But Giles played in just 4 more test matches before hip injury forced him to announce his retirement from the game 6 weeks ago.

记者:是的,阿斯瑞·吉尔在英国已经连续取得了10门,又使英国赢得了灰烬杯的胜利。6周前,吉尔刚又打完四场练习赛,大腿就损伤了,这使他被迫宣布离役。

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

内昆铁路水溪沟大桥,中心里程为DK608+393.00,该桥的设计方案有三个,通过技术、经济比较,采用4×32m预应力混凝土简支梁桥方案,桥梁全长149.5m,I级单线铁路,设计时速为120km/h,设计荷载为中活载。上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

The laser engraving also matches the three-dimensional antique brass medallion that was featured on Zippo's D-Day 50th Anniversary commemorative,thus linking these two D-Day anniversary editons.

虽然是激光雕刻,但它同样符合了在Zippo D-Day50周年纪念时特别采用的3d古黄铜圆形图案,这是这两款纪念D-Day系列打火机的相互联系。

We finished the matches at around 5 in the evening, the ESL shutter took us back to our apartment.

在晚上5点左右我们结束了比赛。

He said, I played one of my last matches against Inter and I put the ball in the top corner.

他说:我在最后的对国际比赛中将一个球打入上角。

Shipped products have to do: Safety matches, barium nitrate, sodium nitrate, sodium sulfite, cleaning agents, polyurethane, trichloroisocyanuric acid, sulfur dioxide, etc.

运做的产品有:安全火柴,硝酸钡,硝酸钠,亚硫酸钠,清洗剂,聚氨酯,三氯异氰尿酸,二氧化硫尿等等产品。

Deliver 100 flags in Capture the Flag or other battle matches.

CTF比赛或其他中送100个旗子

第78/100页 首页 < ... 74 75 76 77 78 79 80 81 82 ... > 尾页
相关中文对照歌词
Matches
Motel Matches
Made Of Matches
Matches
Gasoline And Matches
Hide Your Matches
Gasoline And Matches
Matches
Gasoline And Matches
Matches
推荐网络例句

However, as the name(read-only memory)implies, CD disks cannot be written onorchanged in any way.

然而,正如其名字所指出的那样,CD盘不能写,也不能用任何方式改变其内容。

Galvanizes steel pallet is mainly export which suits standard packing of European Union, the North America. galvanizes steel pallet is suitable to heavy rack. Pallet surface can design plate type, corrugated and the gap form, satisfies the different requirements.

镀锌钢托盘多用于出口,替代木托盘,免薰蒸,符合欧盟、北美各国对出口货物包装材料的法令要求;喷涂钢托盘适用于重载上货架之用,托盘表面根据需要制作成平板状、波纹状及间隔形式,满足不同的使用要求。

A single payment file can be uploaded from an ERP system to effect all pan-China RMB payments and overseas payments in all currencies.

付款指令文件可从您的 ERP 系统上传到我们的电子银行系统来只是国内及对海外各种币种付款。