英语人>网络例句>master production schedule 相关的网络例句
master production schedule相关的网络例句

查询词典 master production schedule

与 master production schedule 相关的网络例句 [注:此内容来源于网络,仅供参考]

Analyze customer orders, prepare Master Production Schedule accurately, maintain related figure into system, prepare capacity offering report .

分析客户订单,安排主生产计划,维护系统数据,提供能力报表

Following the above procedure, a reasonable master production schedule under the constraint of process window and machine dedication is obtained.

依此流程,可产生一考量制程规格能力与垂直锁定机台下之主生产排程规划结果。

Was put forward, namely innovating the enacting the master Production Schedule scientifically and rationally based on sales forecasting and order number.

该模型将MRP、JIT、TOC三种理论加以融合,提出一种新的生产计划管理方法——MTJ。

As to the material management, the basic theory of material requirement planning is mainly introduced. The features of bill of material, master production schedule and lot sizing of glass deep process industry are analyzed. Then the calculation method of MRP of glass deep process industry is analyzed, and the information integration of cutting stock and MRP isIIrealized.

在物料管理方面,主要介绍了物料需求计划的基本原理,重点分析玻璃深加工企业物料清单、主生产计划、批量规则的特点,分析该行业的物料需求计划的计算方法,实现产品排料与物料需求计划的信息集成。

To solve the inconsistency between planning parameters and practical parameters under a time horizon of master production schedule in process enterprises, an optimized model of integrating auto regressive moving average model with back propagation algorithm of artificial neural network is proposed.

为了解决流程型企业主生产计划时段中计划参数与实际参数的不一致性问题,提出了自回归滑动平均模型与反向传播人工神经网络的集成优化模型。

On this condition, we design the first step of MIS software architecture that center on material flow management for making zero stock, create data dictionary and develop MRP model block, it includes BOM management, material requirement planning, master production schedule and purchase planning etc.

在此基础上,设计了以实现零库存为主要目标,物流管理为中心的内江峨眉柴油机厂MIS第一期的应用软件结构,建立了相关的数据字典,完成了MRP模块以及相关的模块,包括BOM维护、主生产计划制订和采购计划制订等功能。

This, originates from the master production schedule by utilizing static ERP data, such as BOM, routing, working center and dynamic data, for instance, purchase orders, inventory information, material requirement plan, capacity requirement plan to coordinate the material flow and capacity load so as to have them strike a good status.

这两项工作都是从主生产计划入手,利用 ERP 的静态数据如 BOM、工艺路线、工作中心以及动态数据如销售订单、库存信息、物料需求计划、能力需求计划来完成对物流以及产能的调度,从而达到产能负荷的平衡与物流的准时。

The absolute solution of Jiaojia ERP is put forward, the system models are established, and the solution are explained in detail. The business program of Jiaojia gold mine is reengineered based on the theory of "business centers", and the program-oriented compressed organization is framed. The index group and the solution of mine total quality management are setup. Then the optimize program of SCM and its components are designed on the guidance of "Horizontal Integration". The data of Jiaojia gold mine are reengineered based on the data warehouse technology. The information integration can be available after the establish of the business oriented databases, the subject integration oriented data marts, the application oriented data warehouses, the code databases and metadata, as weil as the OLAP system. The mathematics models and data mining modes are set up to function for the decision support of ERP system. The model of programming Master Production Schedule driven by geological resources and marked is figured out, so as to the models for material requirements planning and other decision supports are set up. The models provide service in forms of model storehouse, method storehouse, and algorithm tools center. The agent center is introduced to process the models' organizing, service, as well as self-study. The function system of Jiaojia gold mine ERP is figured out. By combining the development characteristics of Clients/Server and Browse/Server, the general framework and every sub systems are described in detail, including the function, structure, arrangement, modality, and so on.

主要内容如下:(1)深入论述了黄金矿山实施ERP的可行性,并结合应用需求将ERP理论在深度和广度上进行了拓延,建立了黄金矿山ERP系统的理论基础:以资源与市场共同驱动的供应链管理;黄金矿山的双重物流体系;以地质资源有效利用为目标的生产控制体系;黄金矿山财务管理的成本控制核心理论等;(2)提出焦家金矿ERP系统的整体解决方案,构建ERP系统模型,并进行了细节方案的设计:基于"作业过程核心"理论重新规划焦家金矿的业务流程,在此基础上设计面向流程的"扁平化"组织机构;建立了矿石全面质量管理的指标体系和实施方案;以"横向一体化"为指导思想,提出供应链管理各组成部分的全面优化方案;(3)以数据仓库技术为核心完成焦家金矿的数据规划,分别建立面向业务的数据库、面向主题集成的数据集市和面向主题应用的数据仓库,设计代码数据库和元数据库,定义OLAP方式,实现焦家金矿的全面信息集成;(4)针对ERP系统中的决策支持功能,建立了相应的数学模型和数据挖掘模型,提出了地质资源和市场共同驱动的主生产计划模型制定过程,进一步建立了物料需求计划的线性规划模型,以及其它决策支持模型;提出以模型库、方法库和算法工具为核心的模型服务方式,并设计了代理机制完成模型的组织、服务和自学习过程;(5)构建焦家金矿ERP系统的功能体系,针对C/S和B/S模式系统的开发特点,分别对功能体系架构以及各子系统的功能、结构、层次和形式进行详细设计。

4 Participates in decision-making and planning to reconfigure production lines to support customer demand and planned master schedule.

参与决策和重新规划生产线,以支持客户需求和计划好的主计划。

Distribute order master schedule to Enginneering, Procurement, Production Planning and Assembly shopfloor.

发放订单主计划给工程设计,采购,生产计划和装配车间。

第3/3页 首页 < 1 2 3
推荐网络例句

The labia have now been sutured together almost completely.The drains and the Foley catheter come out at the top.

此刻阴唇已经几乎完全的缝在一起了,排除多余淤血体液的管子和Foley导管从顶端冒出来。

To get the business done, I suggest we split the difference in price.

为了做成这笔生意,我建议我们在价格上大家各让一半。

After an hour and no pup, look for continued contractions and arching of the back with no pup as a sign of trouble.

一个小时后,并没有任何的PUP ,寻找继续收缩和拱的背面没有任何的PUP作为一个注册的麻烦。