查询词典 master production schedule
- 与 master production schedule 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Plan and maintain proper levels of material to execute the master production schedule.
与生产计划合作,按照周计划的安排提供预订的物料可用性,来满足及稳定全球物料预订的委托
-
3 Update and maintain the Master Production Schedule as changes are identified in order for the MRP to reflect accurate, up-to-date information.
更新和维护主生产计划确定的变化,以便使MRP准确反映最新的信息。
-
2 Compare Master Production Schedule with Customer PO coverage on regular basis to avoid material exposure.
定期比较主生产计划和客户订单,以避免物料闲置。
-
Responsible for the Master Production Schedule.
管理主生产计划
-
Facility level is the place in the hierarchy where the master production schedule is constructed and manufacturing resource planning is conducted.
以下是用金山词霸牛津版直译!!!设施水平在那里的主生产计划是建造和制造资源规划层次地进行。
-
1Reconcile the Master Production Schedule to customer purchase order coverage weekly to ensure that company is not exposed over purchase order coverage.
每周根据客户的采购订单量,调节主生产计划,以确保公司不会生产订单量范围之外的需求。
-
Maintain SAP Master Production Schedule.
保持SAP的主生产进度。
-
The primary logistical responsibility in manufacturing is to participate in formulating a master production schedule and to arrange for timely availability of materials, component parts, and work-in-process inventory.
制造阶段中,物流的最基本责任是参与制订主生产计划,并安排材料、零部件和在制品存货的及时可得性。
-
It can be divided into four parts: MRP calculation enquiries, MRP formal calculations, product demand plan, MPS Master Production Schedule.
其二是生产计划管理,可分为MRP计算查询、MRP正式计算、产品需求计划、MPS主生产计划四大功能。
-
With the guidance of system functional target, researches and develops theplanning management system, designs its main functions, analyzes the making flow of Master Production Schedule and Material Requirement Planning in detail, balances the Planning control and agile manufacture, describes the designing process of production management database, presents its E-R graph and main basis tables of database.
根据系统功能目标,研究开发了计划管理系统,设计了计划管理系统的主要功能,对主生产计划、物料需求计划的制定流程进行了详细分析,实现了计划控制与灵活生产的有机结合。对生产管理数据库的设计过程作了详细的阐述,给出了生产管理系统E—R图和主要的数据库基表。
- 推荐网络例句
-
The labia have now been sutured together almost completely.The drains and the Foley catheter come out at the top.
此刻阴唇已经几乎完全的缝在一起了,排除多余淤血体液的管子和Foley导管从顶端冒出来。
-
To get the business done, I suggest we split the difference in price.
为了做成这笔生意,我建议我们在价格上大家各让一半。
-
After an hour and no pup, look for continued contractions and arching of the back with no pup as a sign of trouble.
一个小时后,并没有任何的PUP ,寻找继续收缩和拱的背面没有任何的PUP作为一个注册的麻烦。