查询词典 major bridge
- 与 major bridge 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Troy Stewart and his 10-year-old daughter were on their daily bike ride about 7:45 p.m. Monday when Stewart, 31, suggested they jump off a 15 foot bridge. Stewart held his daughter Meagan Stewart's hand as they jumped off the bridge into the Intracoastal Waterway, authorities said.
周一晚上7点45分,特洛伊·斯图尔特和10岁的女儿正在进行每天的骑自行车运动。31岁的斯图尔特建议女儿和他一起从一座15英尺高的桥上跳下去,后来斯图尔特举起女儿麦奇的手,二人一起跳进了桥下的河道中。
-
This design proposal is the prestressed reinforcement concrete conatant cross-section box shape continuous bridge, Main span disposal is 45+45+45m, the bridge floor width is 28m, the king post uses is the single box single room.
本设计方案为预应力钢筋混凝土等截面箱形连续梁桥,主桥布置为45+45+45m,梁桥面宽28m,采用单箱单室梁。
-
Prior to the arrival of London Bridge, the land upon which the bridge was placed was a peninsula.
到来之前伦敦桥,它的土地的桥梁被置于一个半岛。
-
A land bridge between the continents; a bridge of understanding between two countries.
连接大陆的陆地桥;两个国家之间互相谅解的纽带
-
The LongBridge is one of the lover bridge in Hangzhou, according to the folk story, Liang Shanbo and Zhu Yingtai was send each other back for 18 times at this bridge. You also can view Leifeng Pagoda inside the garden.
长桥是西湖三大情人桥之一,据说梁祝十八相送到此饯别,在桥上来来回回走了十八里路,祝英台以物喻情打了十八个比喻,所谓"路长桥不长"。
-
It is understood that the equipment is still in the lift bridge for debugging phase, the temporary bridge sightseeing activities also was not open to the public.
据悉,由于大桥观光电梯等设备尚处调试阶段,目前大桥的观光活动还暂时不对外开放。
-
Compare with the general road, bridge pavement has special structures, such as orthotropic bridge system and light-minded asphalt surface. The pavement diseases are resulted from the influence of environment climate and temperature.
桥面铺装不同于普通的高等级路面,由于其结构的特殊性(正交异性桥面体系及轻薄的沥青面层等),亦受外界气候和温度的影响,因而很容易产生各种病害。
-
A novel phase-shifted zero-voltage and zero-current switching PWM DC/DC full-bridge converter is presented in this thesis, which is based on the groundwork of summarization of the development of Power Electronics in recent years and lucubration in theoretical basis of modern high frequency soft switching power convert technique and analysis of operation principle, characteristic of the circuit and inherent drawbacks of the traditional phase-shifted zero-voltage switching PWM DC/DC full-bridge con...
本文在对近年来电力电子学科的发展高度综述和对现代高频软开关功率变换技术理论基础深入研究的基础上,对传统的移相控制ZVS PWM DC/DC全桥变换器的工作原理、电路特性、存在的缺点进行了分析,在此基础上提出了一种改进型的移相控制ZVZCS PWM DC/DC全桥变换器。
-
Matsuura The reporter learned from the bridge construction headquarters was informed that currently the main tower of the bridge Matsuura has risen to 100 meters, 100 meters above the construction has also reached the river in Harbin construction record.
记者从松浦大桥建设指挥部获悉,目前松浦大桥主塔已经升至100米,百米以上施工也创下哈尔滨市江上建筑施工最高纪录。
-
Matsuura Bridge, Central Command area of cable-stayed bridge to prestressed cables, cords and duct construction and installation to take GPS global satellite positioning system for spatial orientation, select no wind, no sun in the morning and evening measurements, measured twice a day, any size guarantee 100 meters altitude error of less than 10 mm to ensure the accuracy of the construction.
松浦大桥指挥部对斜拉桥拉索区环向预应力、索导管安装等施工采取GPS全球卫星定位系统进行空间定位,选择无风、无阳光的清晨和傍晚进行测量,每天测量两次,保证百米高空任何尺寸误差在10毫米以内,确保施工精度。
- 相关中文对照歌词
- Wind Up
- London Bridge Is Falling Down
- Sgt. Major
- Major Barbra
- Center Of The Stage
- Major
- Me And The Major
- Space Oddity
- Nobody's Listening (Green Lantern Remix)
- Space Oddity
- 推荐网络例句
-
Nowadays, most of research are to build a transmutative Petri Nets through adding controlling place sets, controlling arc sets and controlling policy to the basic Petri Nets, while the Controlled Petri Nets could be used to argue many controlling theory problems conveniently and to induce many logically and physically supervisory and solve the Event Feedback Controlling Problems and State Feedback Controlling Problem in DEDS supervisory theory.
目前大多数的研究表现为在变形后的受控Petri网基础上,利用各种方法求得各种逻辑型、结构型控制器,解决DEDS监控理论中的事件反馈控制问题与状态反馈控制问题。
-
On one hand, there are discussions with the works council and union about extension of short time working up to the end of September.
一方面,有讨论,工程理事会和联盟关于延长工作时间短至9月底。
-
What is the topic sentence of this article?
这篇文章中心的句子是那一句?