英语人>网络例句>maintenance 相关的网络例句
maintenance相关的网络例句

查询词典 maintenance

与 maintenance 相关的网络例句 [注:此内容来源于网络,仅供参考]

Under exceptional circumstances, the use of equipment found unusual circumstances, can carry out their own maintenance, but should be completed "equipment-maintenance records" to maintenance records, and timely maintenance record as head examined.

特殊情况下,设备使用人员发现异常情况,可自行进行维修,但应填写《设备维修记录单》做好维修记录,并及时将维修记录交部门负责人审阅。

Ventil Ator Factory bacterial oxidation of the room on the 9th of Wuhan Blower Blower Factory production models D465-31 for the blower, the reasons for failure should be a standstill for more than a year can not be run in the factory Xuanye **** and the urge to lead, to overcome the Its complex structure of the process, technical parameters, maintenance of high precision, on-site maintenance, as well as poor operation procedures and other aspects of the complex, engineering plans and in the maintenance department of coordination and joint efforts by manufacturers to service personnel Wuhan Blower And the maintenance guide, and finally in December 23, 2008, and to test the success of the realization of grid for the first time to run.

关于风机的翻译,请高手帮忙不全是专业东西还有一些官话,麻烦高手给帮忙翻一下高分悬赏问题补充:细菌氧化风机厂房内的9号鼓风机是武汉鼓风机厂生产的型号为D465-31的鼓风机,应故障原因停滞了一年多不能运行,选冶厂在**和**的敦促带领下,克服了其工艺结构复杂、技术参数多、检修精度要求高、现场维修条件差以及运行程序复杂等诸多方面问题后,在工程部计划部门和维修部门的协调配合和共同努力下,通过武汉鼓风机厂家服务人员的维修和指导,终于在2008年12月23日,得以成功试车并实现首次并网运行。

The appraisal and the finding of current mill condition , the forecasting of conditiontrend ,fault diagnosis 、maintenance strategy arithmetic and decision-making deducingprocess.To enhance software function of equipment management information system, mill condition-based maintenance software aided system is developed,it can save mill condition data into equipment information management platform,through mill software module to analysis sequenced detection data and automaticly give the appraisal of current mill condition , the forecasting of condition trend ,fault diagnosis,maintenance strategy and decision-making suggestion for mill technician as a reference to decide whether tostart mill condition-based maintenance.

在燃煤电厂既有的设备点检和大小修管理信息系统软件平台的基础上,进一步开发磨煤机的状态检修软件支持系统模块,能存储磨煤机的状态点检数据入设备信息管理平台,通过磨煤机状态检修软件支持系统模块对一段时间内的磨煤机点检数据进行处理从而给出磨煤机当前状态的分析与评价,磨煤机状态趋势的预测,磨煤机的故障分析、故障原因查找和解决措施,将最终的维修决策建议提供给磨煤机的专业技术维修人员和管理决策者参考,结合软件分析和人工经验的干预以决定是否开始磨煤机的状态检修。

In the civil aviaton regulations of JAR-66 and each country, raise a requirement to the professional knowledge level of aerostat maintenance technician not only, and real work experience and adept operation skill are the condition that maintenance technician obtains charter place to should be had likewise, maintenance technician is returned should hep and relevant civil aviaton code and build safety administration idea.

在JAR-66及各国的民航规章中,不仅对航空器维修人员的专业知识水平提出要求,而且实际工作经验和娴熟的操作技能同样是维修人员取得执照所应具备的条件,维修人员还应熟知相关的民航法规和建立安全治理概念。

XEIKON7000-cards and membership cards to make part of the structure is simple, easy-to-maintain, and per-machine working time, taking into account the need to maintain it, can be divided into six-level maintenance, where normal operator only grasp between one and three-level maintenance method, based on practical experience, to clean the drum heads and maintenance requirements for higher because it is directly linked to the longevity of the disk head and the head drum as well as business card printing and membership card making, due to the quality of the manufacturer does not take into account the humid climate in mainland China, as well as workshop at room temperature, so take extra care equipment and supplies for bypothermia dampproof, included in the device is not working, we need to use the air conditioning plant damping, the device at room temperature observed to stop working.

XEIKON7000的制卡和会员卡制作部分结构简单、易于维护,按机器工作时间的长短,其需要维护的部分不同,可分为六级维护,其中普通操作员只要求掌握一至三级维护的方法,根据实际操作的经验,对磁头和磁鼓的清洁维护要求较高因为其直接关系到磁头和磁鼓的寿命以及制卡和会员卡制作品的质量,由于制造商没有考虑到中国大陆潮湿的气候以及车间的室温,所以要特别注意设备和耗材的降温防潮,包括在设备工作时,也需要使用空调对车间进行降温,设备在室温过高时会停止工作。

Referring to HMIS public data coding criterion, parts coding management module was designed and established, and parts coding automatic generation function was realized. According to the data collection methods in the reliability theory, maintenance record collection principle was determined, and maintenance record management module was established. Then, by using reliability theory and mathematical statistics method, data statistic analysis and malfunction analysis modules were established, and components failure data statistics, choosing of life distribution law, and predicting of maintenance period were realized.

参照HMIS公用数据编码规范,设计并建立了零件编码管理模块,实现零件编码自动生成功能;根据可靠性理论中数据的收集方法,确定了维修记录收集原则,建立了维修记录管理模块;继而,利用可靠性理论及数理统计方法中对数据的统计分析,建立了数据统计分析、故障分析模块,实现了对零部件故障数据的统计、寿命分布规律的选择及对维修周期的预测。

This thesis focuses on analyzing the horizontal and vertical resolution of the main data reasonably, data fitting, residual analysis and the projections of the potential breakdown of one thousand cars in the future and it also illustrates the main batch production cars, sold time, maintenance time, maintenance parts, causes and extent of damage, repair costs, etc in the maintenance of data tables.

主要解决了横向数据与纵向数据的合理性分析,数据拟合与残差分析以及对未来千车故障数的预测。维修数据表主要包含哪个批次生产的轿车、售出时间、维修时间、维修部位、损坏原因及程度、维修费用等等。

In the maintenance era, computerised maintenance management systems are developed for managers to manage maintenance work orders and resources.

在这个后期保养的时代,电子化维修保养管备系统的开发是为了能让经营者有效的管理维修工作流程以及所需要的资源。

Property Management Department also reflected the larger population as a zero-maintenance services, re-revised zero maintenance management, and formulated the "going into the households maintenance standardized service standards," a "three one" service standards, namely : into people's homes to carry a dishcloth, a piece of land cloth, a pair of Galosh.

物业管理处还把居民反映较大的零维修服务作为突破口,重新修订了零维修管理办法,制订了《入户维修规范化服务标准》,实行"三个一"服务规范,即:入户要随身携带一块抹布、一块地布、一双套鞋。

At present, the management maintenance methods of dredger are primary Time Based Maintenance and Run-to-Breakdown Maintenance.

目前对挖泥船管理维修的方法主要有定期维修和事后维修。

第2/382页 首页 < 1 2 3 4 5 6 7 8 9 ... > 尾页
相关中文对照歌词
High Maintenance Woman
High Maintenance
Honky-Tonk Dancing Machine
100,000
High Maintenance
Maintenance
Run Off To LA
Tab Open
Skip Town
Cycles To Gehenna
推荐网络例句

The circulation, consumption and reproduction of the trilogy have not only testified to its historical significance and literariness, but also invested it with new meanings.

该三部曲的流通、消费与再生产不仅验证了其历史意义及文学性,而切还赋予它以新的意义。

If he thought that he could buy me off, he would be wrong.

如果他认为他可以收买我,那他就大错特错了。

Can I be excused today's lesson?

我可以不上今天的课吗?