英语人>网络例句>main beam 相关的网络例句
main beam相关的网络例句

查询词典 main beam

与 main beam 相关的网络例句 [注:此内容来源于网络,仅供参考]

This paper discusses the problems met in static test as the setting of datum line beam and reference stake,compaction of main beam by jack,loading side test,and quick and slow loading method,in order to ensure scientificity and accuracy of static test data,and to improve the quality of pile foundation detection and the reliability of detection evaluation result.

对基准梁与基准桩的设置、主梁压实千斤顶、边堆载边试验、慢速与快速加荷法等静载试验中遇到的问题进行了探讨,以保证静载试验数据的科学性和准确性,从而提高了桩基检测工作的质量和检测评定结果的可靠性。

The direction of maximal radiation of the main beam must be directed into the geometrical center of the elliptic surface of the offset parabola.

主波束最大辐射方向必须瞄准偏馈抛物面椭圆表面的几何中心。

In order to guarantee main beam scabbed bridge long-term secure use, I systemly research stress instance of new and old bridge joint face.

为了保证主梁拼接的桥梁长期安全的使用,对拓宽后桥梁的主梁及新旧主梁连接面的受力情况进行系统的研究。

A store Peking Man site locates the southwest building in Peking City mountain area a store main beam of boat mountain north, ising a material to enrich most in the world, most the human site of the earlier period in system, year in age.1921 In stone in old in and in worthy in most in the to 1927, the archeologist discovers outside" Peking Man" cave site three times successively three human tooths fossil,1929, discovers again Peking Man skull fossil, and artificial creation of tool with use the fire historic relic, the important cist that to become to frighten the world detection.A year a store site still discovers to be apart from to invite now summit of hill hole person's fossil a thousand yearseses ago with culture keepsake.

周口店北京人遗址位于北京市西南房山区周口店镇龙骨山北部,是世界上材料最丰富、最系统、最有价值的旧石器时代早期的人类遗址。1921年至1927年,考古学家先后三次在"北京人"洞穴遗址外发现三枚人类牙齿化石,1929年,又发现了北京人头盖骨化石,以及人工制作的工具和用火遗迹,遂成为震惊世界的重大考古发现。1930年在周口店遗址还发现距今约2万年前的山顶洞人化石和文化遗物。

The nominator of Equation 1 is multiplied by the G M factor representing the relative antenna gain of the main beam compared to the sector antenna gain.

等式1的提出者将其再乘以 GM 因子后来表示;较之扇形天线增益而言的,主要波束的相对天线增益。

At the same time,it designed the project of construction supervision and measure aimed at the strengthening bridge by external presttessing,through the contrast between the result in theory and fact,we can see that it is feasible to use predigestion's computing based on elasticity to analyse continuous rigid frame briges reinforced by external presttessing ,and it can ignore the effect of the second stress. So, it can be capable of the analyses in the strengthening bridge by external presttessing using the method of controlling by flexibility and stress to set up the model of scathe,and,the method of external presttessing can ensure stress reserve of the main beam, to reduce effectively PrinciPal tensile stress, to renew line state of bridge structure and gradient. The effect of strengthenment was obvious and the reinforcement scheme was successful.

同时,进行了该桥体外预应力加固监测方案设计,并通过理论计算结果与实际监测成果的比较,验证了在施工阶段及正常使用阶段,大跨连续刚构体系的体外预应力加固计算中忽略二次应力增量的影响,采用弹性分析方法进行简化计算的可行性,进而说明采用双控拟合方法建立的结构损伤模型能够满足体外预应力加固计算的要求,并且体外预应力加固法能够显著增大主梁的应力储备、有效地减少了主拉应力、恢复了桥面线形和坡度,加固效果明显,加固方式成功。

In Hongfenghu long Span Bridge construction, stiff skeleton method is adopted to implement closure of main span and side span, by taking a series of measures to assure construction quality,the safe of structure stress and the easement of main beam alignment are assured in the course of closure segment construction.

红枫湖大桥采用劲性骨架法进行边跨和主跨的合龙,并通过采取了一系列确保合龙段施工质量的措施,保证了合龙段施工过程中结构受力的安全和主梁线形的平顺。

Designers then focused on the Main rotor head, where they developed the all metal head to include High-G 3D thrust bearings and dampeners as standard. There would be no tracking issues here at Beam, regardless of head speed.

接下来,研发工程师把主要精力放在了主旋翼头的设计上,全部用高重力 3D 推力轴承和推力调整器安装起来的全金属主旋翼头,Beam机子没有动作缓慢的问题,那么主旋头的转动速度是可想而知的了。

Studied internal force and transform of four construction stages, make sure the general precamber of the main beam,the side beam and three arches.

分别研究了四个施工阶段的结构内力和变形,确定了主梁、边梁和三片拱的一般预拱度。

Basically, a composite concrete deck consists of a concrete top slab, flanked on each side by concrete main beam s, and a concrete middle beam .

组合混凝土梁的基本构成是顶部为混凝土平面,两侧为混凝土主梁,中间为混凝土中梁。

第2/17页 首页 < 1 2 3 4 5 6 7 8 9 ... > 尾页
推荐网络例句

On the other hand, the more important thing is because the urban housing is a kind of heterogeneity products.

另一方面,更重要的是由于城市住房是一种异质性产品。

Climate histogram is the fall that collects place measure calm value, cent serves as cross axle for a few equal interval, the area that the frequency that the value appears according to place is accumulated and becomes will be determined inside each interval, discharge the graph that rise with post, also be called histogram.

气候直方图是将所收集的降水量测定值,分为几个相等的区间作为横轴,并将各区间内所测定值依所出现的次数累积而成的面积,用柱子排起来的图形,也叫做柱状图。

You rap, you know we are not so good at rapping, huh?

你唱吧,你也知道我们并不那么擅长说唱,对吧?