查询词典 long process
- 与 long process 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Pressure of the RMB revalues need to be adopted with a series of policy measure. From a long period of time seeing, the marketization of RMB rate of exchange is certain selection, and this kind of reformation should be adaptable each other with the marketization process of China economy.
人民币升值的压力需采取一系列的政策措施来化解,从长期看,人民币汇率的市场化是必然选择,但这种改革应与我国经济的市场化进程相适应,保持人民币汇率基本稳定,这是我国必须坚持的一项金融政策。
-
Great scarps are initiated at the thinning and breaking of the continental lithosphere and have a long phase in the ensuing development, with a successive selfparallel retreat-a process that may be defined as tectonic planation, with the occurrence of a basal surface for shelf sediments.
大悬崖的形成始于大陆岩石圈的变薄和裂解,持续发育过程较长,期间经历一系列的平行后退过程--即所谓构造夷平作用,导致大陆架沉积基准面的形成。
-
Assuming this process of mutual interpretation continues for a long period of time in which each subsuming or appropriation of the other's meanings would lead to a larger horizon of understanding, one comes to see what would be the common ground or common areas of life experience between the two, and yet one would come to see at the same time where, how and even why each differs.
假设这一双向诠释的过程持续了很长一段时期,双方各自消化和借用对方的意义会引出一个更宽广的理解视域。这时人们会看到双方的共同点和共同的生活经验;但同时也会看到,双方在何处、何时甚至为了何故而彼此不同。
-
A process for partial conversion and low-temp transform of CO in the synthetic ammonia plant where coal is used to generate gas features that the Fe-Mo catalyst for partial conversion of CO, anti-poisoning agent and Co-Mo catalyst for low-temp conversion are used and the temp of semi-water gas is controlled to 200-260 deg.C at entering anti-poisoning layer, and 150-250 deg.C at the segments of said Co-Mo catalyst layer, and lower than 300 deg.C at bed layer to prevent high-temp reversal of sulfurizing reaction and make the catalyst activity optimal. Its advantages are long service life of catalyst, low system resistance, saving energy and convenient operation.
本发明是中小合成氨厂以一种CO部分转化抗毒保护层配低温变换的工艺,涉及煤造气合成氨厂0.6~2.0MPa半水煤气变换工艺流程,该工艺用铁-钼CO部分转化催化剂、抗毒剂,配钴-钼低变催化剂,半水煤气进入部分转化抗毒层温度为200~260℃,进钴-钼低变催化剂各段温度为150~250℃,床层温度控制在300℃以内,避免高温下反硫化反应发生,保护催化剂活性处最佳状态,寿命延长、系统阻力小、节汽、节电,具有比其他变换工艺更好地节能效果,操作方便,有效生产时间长,经济效益显著等特点。
-
Because its failure process is quite long, toppling has not been well noticeable in Taiwan.
由於此种破坏过程十分漫长因此倾倒破坏在台湾地区并未受到重视。
-
"Motuo" and "mada different transliterated forms of the same English word""motor", have gone through the process from mix-up to division in their long history of usage, with their concrete using situation being very complex.
&摩托&与&马达&作为同一个英文单词的不同音译形式,在长期的使用中经过了由混同到分化的过程,它们具体的使用情况比较复杂。
-
In SPIF process, the loading trajectory is complex and long, the thinning of the sheet thickness is dramatic, and the local deformations are accumulated. So, there are some difficutis in the numeriacla simulation of SPIF. For example, the modeling of SPIF is difficult and the computational efficiency is low.
金属板材单点渐进成形由于自身的特点,如成形过程载荷加载轨迹复杂且长、板材厚度的剧烈减薄变化、以及局部变形累积等,使得对其进行有限元法数值模拟存在建模难度大、计算效率低等难点问题。
-
The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.
上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。
-
The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.
内昆铁路水溪沟大桥,中心里程为DK608+393.00,该桥的设计方案有三个,通过技术、经济比较,采用4×32m预应力混凝土简支梁桥方案,桥梁全长149.5m,I级单线铁路,设计时速为120km/h,设计荷载为中活载。上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。
-
This kind of tradition of formation, is in the coon age process long-term of sing practice, because of language characteristics, sing habit, life style, melody property etc. factor of influence accumulation get up.
这种传统的形成,是在漫长的岁月中经过长期的歌唱实践,由于语言特点、歌唱习惯、生活格调、乐曲性质等因素的影响所累积起来的。
- 推荐网络例句
-
Singer Leona Lewis and former Led Zeppelin guitarist Jimmy Page emerged as the bus transformed into a grass-covered carnival float, and the pair combined for a rendition of "Whole Lotta Love".
歌手leona刘易斯和前率领的飞艇的吉他手吉米页出现巴士转化为基层所涵盖的嘉年华花车,和一双合并为一移交&整个lotta爱&。
-
This is Kate, and that's Erin.
这是凯特,那个是爱朗。
-
Articulate the aims, objectives and key aspects of a strategic business plan.
明确的宗旨,目标和重点战略业务计划。