英语人>网络例句>loading 相关的网络例句
loading相关的网络例句

查询词典 loading

与 loading 相关的网络例句 [注:此内容来源于网络,仅供参考]

According to Lemaitre's damage evolution law and the assumption of this paper that the cyclic loading maximum tensile stress has the most contribution to the cyclic damage and assume that the stress is the maximum stress .The material parameters S which are expressed in exponential form and generalize the variation in the process of cyclic loading is exponential experience equation which provide the expectation of cyclic damage of 63Sn/37Pb material and lead it into the calculation of damaged incremental form and assume that damage keeps constant during the same cycle. The results match the experimental data. It proves that the Endochronic plasticity theorem adopt the calculation of damage environment.

根据Lemaitre损伤演化律及本文假设循环负载下拉应力在最大值附近对循环损伤的贡献最大,文中应力对各循环之损伤而言假设应力为最大拉应力,将材料参数S以指数型式表示,归纳出疲劳损伤在循环负载过程中的变化为指数型经验式,提供63Sn/37Pb材料在循环负载作用时损伤情况的预测,并引入含损伤增量式内涵时间之计算中,假设同一循环的损伤为定值,其计算结果与实验数据吻合,说明内涵时间塑性理论亦适用於损伤环境下的计算。

This paper discusses the problems met in static test as the setting of datum line beam and reference stake,compaction of main beam by jack,loading side test,and quick and slow loading method,in order to ensure scientificity and accuracy of static test data,and to improve the quality of pile foundation detection and the reliability of detection evaluation result.

对基准梁与基准桩的设置、主梁压实千斤顶、边堆载边试验、慢速与快速加荷法等静载试验中遇到的问题进行了探讨,以保证静载试验数据的科学性和准确性,从而提高了桩基检测工作的质量和检测评定结果的可靠性。

In the event of the Seller's failure to effect loading when the vessel arrives duly at the loading port, all expenses including dead freight and/or demurrage charges thus incurred shall be for the Seller's account.

在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。

Of the Seller's failure to effect loading when the vessel arrives duly at the loading port, all expenses including dead freight and/or demurrage charges thus incurred shall be for the Seller's account.

在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。

In the event of the Seller's failure to effect loading when the vessel arrives duly at the loading port , all expenses including dead freight and/or demurrage charges thus incurredshal be for the Seller's account.

装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。

In the event of the sellers' failure to effect loading when the vessel arrives duly at the loading port , all expenses including dead freight and / or demurrage charges thus incurred shall be for seller's account.

装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物超过船舷并脱离吊钩以前一切费用和风险由卖方负担。

In the event of the Seller''s failure to effect loading when the vessel arrives duly at the loading port, all expenses including dead freight and/or demurrag

装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。

In the event of the Seller ' s failure to effect loading when the vessel arrives duly at the loading port , all expenses including dead freight and/or demurrage ges thus incurred shall be for the Seller ' s account.

装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。

In the event of the sellers' failure to effect loading when the vessel arrives duly at the loading port,all expenses including dead freight and/or demurrage charges thus incurred shall be for seller's account.

装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物越弦并脱离吊钩以前一切费用和风险由卖方负担。

In the event of the Seller's failure to effect loading when the vessel arrives duly at the loading port, all expenses including dead freight /or demurrage charges thus incurred shall be for the Seller's account.

装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。

第7/100页 首页 < ... 3 4 5 6 7 8 9 10 11 ... > 尾页
相关中文对照歌词
Life's Zombies
Across The Line (Unreleased 2007 Demo)
Across The Line
Believe Me
Christmas For Every Boy And Girl
License
Heartless Remix
Big Tops
Three Strikes
The Christmas Song
推荐网络例句

Dixie itself is a nickname for the American South.

Dixie 本身是美国南部的别称。

I think John Terry epitomises that and a big reaction is what we will be looking for.

而我认为特里就是这样一个典型,他正是我们期望看到的那个领秀。

It has been shown that in the design of hull forms for such high block coefficient ships, the attention must be payed to resistance performance both in the full load and ballast conditions.

在此基础上,探讨肥大船型的权衡设计,并认为在肥大船型设计时应同时兼顾满载和压载航行状态的阻力性能。