英语人>网络例句>load 相关的网络例句
load相关的网络例句
与 load 相关的网络例句 [注:此内容来源于网络,仅供参考]

The maximum load on a bearing should always be smaller than the relief load in order to avoid scuffing and brineling.

为了避免划伤和压坑,轴承上的最大负荷应该总是小于其卸载负荷。

Three ~ nine use the air blower serpentined to undertake the air conditioned room cold load and the heat load primarily, in each room's suspended ceiling places one to two dark attire air blower serpentined.

三~九层采用风机盘管为主承担空调房间的冷负荷与热负荷,每个房间的吊顶内安置一到二个暗装风机盘管。

This paper is theorized on load transfer method. Of all kinds of load transfer functions, A.

本文的研究以荷载传递法为理论基础,在众多的传递函数中,Heydinger提出的传递函数考虑了沉桩、固结以及加载过程对传递函数的影响,。。。

Moreover, this paper is trying to establish a plan according to QC/T636-2000 and attention is paid totes four parameters in this test installation: the speed and torque of motor idling, load, plug load current, the noise and vibration power.

本论文主要进行了以下研究工作:首先分析了国内外汽车电子工业的发展水平,这为开展汽车检测奠定了基础,这也是国内外汽车工业发展的一个重要方向。

This model gained large range of movement within small load range. With increasing load, the increment of range of movement trended to constant.

在较小载荷范围内,模型获得了较大的运动范围,随着载荷的增加,运动范围的增加量趋于稳定。

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

内昆铁路水溪沟大桥,中心里程为DK608+393.00,该桥的设计方案有三个,通过技术、经济比较,采用4×32m预应力混凝土简支梁桥方案,桥梁全长149.5m,I级单线铁路,设计时速为120km/h,设计荷载为中活载。上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

Changes of the level of thermal environment reduce cooling load effectively in case of the all-air cooling system while the radiation-panel system does not reduce cooling load even though the targeted thermal condition is relaxed.

在热环境水平发生变化时,采用全空气制冷系统可有效降低制冷负荷;而采用辐射板制冷系统时,即使目标热环境已经放宽,也不能降低制冷负荷。

According to the different functions of rooms, the focus on air-conditioning system is divided into two kinds of air supply, large space such as foyer, and other all-air system, directly from the new wind and the introduction of outdoor air return of air supply; office and equipment Such as the use of fan-coil plus an independent air system, the new wind from the outdoor unit to introduce new wind to deal with indoor air enthalpy value, fan coil bear all indoor cooling load and part of the new rheumatoid load.

根据各不同功能房间,将该集中系统分为二种空调送风方式,高大空间如门厅等采用全空气系统,新风直接从室外引进与回风合后送风;办公室及设备间等采用了风机盘管加独立新风系统,新风机组从室外引入新风处理到室内空气焓值,风机盘管承担室内全部冷负荷及部分的新风湿负荷。

By the analogy test, the arc suppressing effect of mechanical arcless on-load tap changer is clear, The scheme of arcless on-load voltage regulating system, which is consisted of thyristor controlled series transformer and thyristor controlled filter, is illuminated on electrical structure, control strategy and performance in details.

无弧有载调压技术的研究方向分为机械式无弧有载分接开关调压和静止无弧有载调压两个方面,通过模拟试验,对机械式无弧有载分接开关的灭弧效果和应用可行性进行了探讨。

第59/500页 首页 < ... 55 56 57 58 59 60 61 62 63 ... > 尾页
相关中文对照歌词
The Weight
Bulletproof
The Weight
The Weight
The Weight
Mother Load
The Weight
The Weight
Take A Load Off
The Weight
推荐网络例句

Nowadays, most of research are to build a transmutative Petri Nets through adding controlling place sets, controlling arc sets and controlling policy to the basic Petri Nets, while the Controlled Petri Nets could be used to argue many controlling theory problems conveniently and to induce many logically and physically supervisory and solve the Event Feedback Controlling Problems and State Feedback Controlling Problem in DEDS supervisory theory.

目前大多数的研究表现为在变形后的受控Petri网基础上,利用各种方法求得各种逻辑型、结构型控制器,解决DEDS监控理论中的事件反馈控制问题与状态反馈控制问题。

On one hand, there are discussions with the works council and union about extension of short time working up to the end of September.

一方面,有讨论,工程理事会和联盟关于延长工作时间短至9月底。

What is the topic sentence of this article?

这篇文章中心的句子是那一句?