查询词典 load with
- 与 load with 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Taking the demolition of a large sewage tank as an example, the design of blasting parameters, unit-area load, a reference-area for load and the principle of selecting total reference-area, the calculation of total load, charge structure, priming network and others are discussed.
以拆除一大型污水处理池为例,讨论了爆破参数的设计、单位面积装药量的确定、选取装药基准面和确定装药基准面总面积的原则、总装药量的计算,以及装药结构和起爆网路等;并简述了这种方法的爆破机理。
-
In this paper ,The inertia load disturbance is included in the double loop DC motor control system, Analysis of the load moment of inertia and The width of the linear area of nonlinear saturation relationship,use the method of "quasi-equivalent" modeling to model the nonlinear state space of the DLM with variable load,tested the speed response of the real system, and used an improved genetic algorithm to accurately identify the model's parameters.
本文将惯量负载的扰动纳入直流电机双闭环调速系统,分析了负载转动惯量与饱和非线性的线性域宽度λ的关系,运用&类等效&建模的方法,建立了变负载直流电机双闭环调速系统非线性状态空间模型。
-
Third, mensurated the front axles load-time history when truck was running on general tar-paved roads, mountainous roads and the proving ground enhancement roads, second sampled and pretreated to the load-time history with RPCⅢ software of MTS corporation, acquired the relationship of the frequence of the mean and amplitude load, obtained the zero mean equivalent loads using Goodman experiential fatigue equation, acquired the Weibull distributing functions of equivalent loads of respective roads.
第三,测定了汽车前桥在一般沥青公路、山区公路和试验场强化试验路面的载荷时间历程。对载荷时间历程进行了二次采样和数据预处理。采用雨流计数法得到了各路面的载荷均、幅值的频次关系,并根据Goodman经验疲劳公式,得到了零均值的等效载荷及相应的频次。利用数理统计的方法得到了各路面的等效载荷的Weibull分布函数。
-
The effect that was made to vertical load and lateral load by wagon when running on different speeds and passing through the rail switch and curve is discussed. A representative load information was statisticed.
论述了货车运行在不同速度下,通过道岔和通过曲线对垂向载荷和横向载荷产生的影响,并统计出了比较有代表性的载荷信息。
-
Based on one-cycle control having such merits as anti-perturbation of source, fast dynamic response, robustness, constant frequency, but when converter works in light load its power factor becomes very poor. The modified OCC was proposed, adopting feed-forward compensation control improves influence of power factor at light load, further study adopting independence saw tooth wave completely eliminate influence of power factor at light load.
基于单周期控制有源前端变换器具有抗电源扰动能力强、动态响应快、鲁棒性强、恒频控制等优点,但在轻载时变换器的功率因数变差,提出了改进OCC策略,采用前馈补偿控制改善轻载时对功率因数的影响,进一步研究采用独立的锯齿波电路完全消除轻载时对功率因数的影响,建立改进OCCAFE变换器的数学模型。
-
In designing the flexural reinforcement for the major moment for a particular beam for a particular section, the following steps are involved:· Determine the maximum factored moments · Determine the reinforcing steel Determine Factored Moments In the design of flexural reinforcement of moment resisting concrete beams, the factored moments for each load combination at a particular beam section are ob- tained by factoring the corresponding moments for different load cases with the corresponding load factors.
在设计一个特定部分,特别是梁为关键时刻抗弯增强,下面的步骤涉及:·确定时刻的最大因素·确定钢筋确定的因素时刻在目前的抗弯曲钢筋混凝土梁的设计,在特定的梁截面为每个荷载组合的因素是肥胖的时刻,由保理与相应的负载系数不同的负载情况下,不引起相应的时刻。
-
In designing the flexural reinforcement for the major moment for a particular beam for a particular section, the following steps are involved:· Determine the maximum factored moments · Determine the reinforcing steel Determine Factored Moments In the design of flexural reinforcement of moment resisting concrete beams, the factored moments for each load combination at a particular beam section are ob- tained by factoring the corresponding moments for different load cases with the corresponding load factors.
在设计的抗弯加固梁为一个特定的时间为某一特定部分,下面的步骤被涉及。·确定时刻的最大因素·确定钢筋决定因素的时刻在设计的弯加固混凝土梁的时刻抵制因素的时刻,每个荷载组合作用在某一特定的梁截面——同时运用保理的指挥不同载荷工况相应的时刻与相应的荷载等因素的影响。
-
Such parameters as the percentage of ordinary reinforcment, amounts and configuration of unbonded prestressed tendons, the ratio of span to depth and the loading patterns were considered. Based on the results, the fomula for the eqivalent length of deformation zone on the beams at ultimate were developed. A simple formula was developed for the ultimate mid-span deflection of concrete beams with concept of equivalent length of deformation zone, and the deformation of beam before internal reinforcement yielding was predicted by the traditional formula for the deformation of partically prestressed concrete beam. Then an analytical model was deduced for analyzing the ultimate stress increment in those concrete beams prestressed with external or internal unbonded tendons based on the mid-span deflection.(4) Testes were carried out on a thin-walled concrete box beam presressed with external CFRP tendons to study its short-term performances under uniform load, long-term behaviors under uniform load, and full-time performance under four-point load in turn.
3以体内非预应力钢筋配筋率、体外预应力筋配筋率、体外预应力筋布置形式、预应力度、跨高比、荷载形式等为参数,用非线性分析程序对体预应力筋混凝土梁进行了参数分析,依据分析结果提出了以综合配筋指标和预应力度为参数的等效变形区长度的计算公式,进而提出了基于等效变形区长度的极限挠度计算公式;体内非预应力钢筋屈服前的挠度计算采用常用的部分预应力混凝土梁挠度计算公式;依据试验和非线性数值计算结果,将不同转向块布置形式的体外预应力混凝土梁简化为跨中一个转向块的体外预应力混凝土梁,推导了基于跨中挠度的体外预应力筋应力增量的简化计算公式。
-
Such parameters as the percentage of ordinary reinforcment, amounts and configuration of unbonded prestressed tendons, the ratio of span to depth and the loading patterns were considered. Based on the results, the fomula for the eqivalent length of deformation zone on the beams at ultimate were developed. A simple formula was developed for the ultimate mid-span deflection of concrete beams with concept of equivalent length of deformation zone, and the deformation of beam before internal reinforcement yielding was predicted by the traditional formula for the deformation of partically prestressed concrete beam. Then an analytical model was deduced for analyzing the ultimate stress increment in those concrete beams prestressed with external or internal unbonded tendons based on the mid-span deflection.(4) Testes were carried out on a thin-walled concrete box beam presressed with external CFRP tendons to study its short-term performances under uniform load, long-term behaviors under uniform load, and full-time performance under four-point load in turn.
3以体内非预应力钢筋配筋率、体外预应力筋配筋率、体外预应力筋布置形式、预应力度、跨高比、荷载形式等为参数,用非线性分析程序对体预应力筋混凝土梁进行了参数分析,依据分析结果提出了以综合配筋指标和预应力度为参数的等活动房效变形区长度的计算公式,进而提出了基于等效变形区长度的极限挠度计算公式;体内非预应力钢筋屈服前的挠度计算采用常用的部分预应力混凝土梁挠度计算公式;依据试验和非线性数值计算结果,将不同转向块布置形式的体外预应力混凝土梁简化为跨中一个转向块的体外预应力混凝土梁,推导了基于跨中挠度的体外预应力筋应力增量的简化计算公式。
-
The construction of the high load websites should start from the malfunctions in the websites,apply the technique of load balance,and choose the proper detecting methods of the load balance calculation and the web system status,so as to realize the reliability, high efficiency and extendability of the web service.
从引起web站点的故障出发,结合负载均衡技术,通过选择适当的负载均衡算法和网络系统状况的检测方式,建设起高负载的WEB站点,从而实现WEB服务的可靠性、高效性和可扩展性。
- 相关中文对照歌词
- The Weight
- Bulletproof
- The Weight
- The Weight
- The Weight
- Mother Load
- The Weight
- The Weight
- Take A Load Off
- The Weight
- 推荐网络例句
-
The witness also told the jury at the Royal Courts of Justice in London that he saw a paparazzo fighting with a member of the public who was trying to stop him taking pictures in the minutes before the emergency services arrived.
他还告诉在伦敦皇家法庭的陪审团,在急救服务到来之前,他当时看见一个狗仔队正和一群阻止他拍照的人打架。
-
The entire N/C program on a tape is made up of an accumulation of these successive data blocks.
纸带上的整个数控程序由这些连续数据单元连接而成。
-
My master$s troops have been dispatched to your aid.
我的主人的部队正在前往你那里的路上。