查询词典 load up
- 与 load up 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The effect of tribology factors on bearing vibration is studied experimentally. AR model and WPT are used to processing the normal arid abnormal signals. The results are as follows:1. The vibration of ball bearings is caused by the tribology action of contact pairs of ball and ring races and has the essential of tribo-dynamics. Any factors affecting the tribology characteristics of contact pairs will affect vibration and noise of bearings consequently.2. Vibration characteristics of bearing keep almostly unchanged with the increasing of axial load expecting the increasing of nature frequencies. When radial load increasing with axial load unchanged, nature frequencies keep unchanged but some new vibration peaks appears in the spectrum.3. Vibration amplitudes are damped and nature frequency are enhanced with sufficient lubrication. Vibration and noise of bearings increase obviously and roar can happen and the contact surfaces scratch slightly under insufficient and unclean lubrication state. Bearing will be disabled in a few minutes without any lubrication.4. Bearing vibration is unstable under low speed. With the speed increasing, the vibration become stable and natural frequencies increase slightly but the amplitudes increase apparently.5. Bearing vibration can be excited only by some harmonics ofwaviness without lubrication and by all harmonics with lubrication based on the theoretical analysis.6. The nature frequencies of ball bearings decrease with the increasing sizes. When international clearance increasing, nature frequencies decrease in radial and increase in axial and angular and the amplitudes increase in radial and decrease in axial and angular. When the number of balls increasing, nature frequencies increase and amplitudes decrease. When the pitch diameter increasing, axial nature frequency increase and others nearly keep no change. When outer race groove curvature radius increasing, nature frequencies increase in radial and decrease in axial and angular and amplitudes keep no change in radial and increase in axial and angular. When inner race groove curvature radius increasing, nature frequencies decrease and amplitudes increase.7. The distortion in amplitude and frequency components of bearing vibration signals picked up by the present probe measurement method is founded and right conclusions cannot be achieved by the signals. When accelerometer is rigidly screwed with steel stud onto a flat outer surface of a ball bearing, vibration signal can be got without distortion and the reliability of research on bearing vibration is assured.8. AR model is suitable for large samples of bearing vibration signals, square root of length of samples can be used as the upper limitation of order determination and the FPE order selection criterion is effective. Many advantages of AR spectrum are founded over the classical based on FFT.9. Time-Frequency analysis is necessary for abnormal noise of ball bearings. WPT overcomes the principle shortcomings of STFT and proved to be a best tool to process the abnormal signals.
理论分析和试验研究表明: 1球轴承振动是钢球—滚道接触副中的各种摩擦学作用引起的,具有摩擦动力学的本质,任何对接触副的摩擦学特性有影响的因素都将对球轴承的振动和噪声特性产生影响; 2中心轴向载荷作用下,载荷增大使球轴承的固有振动频率升高,载荷越大同样的载荷增幅引起的频率升幅减小,足够大的中心轴向载荷作用下载荷的变化对球轴承振动的频率特性不会产生明显的影响; 3轴向和径向联合载荷作用下,径向载荷不大时球轴承振动的固有频率基本不变,但是可能引起变刚度激励的非线性振动,出现新的频峰,过大的径向载荷将使部分钢球脱离接触,使球轴承的振动和噪声呈现不稳定状态; 4润滑对球轴承的振动和噪声特性有重要的影响,良好的润滑对振动有明显的抑制作用,润滑不充分时,振动和噪声的水平会有明显增高,一定条件下还会激发接触副中的谐振,发出啸声,造成接触表面的伤害,无润滑干接触时,短时的运转就会损伤接触副表面,使振动和噪声迅速增大,并随时可能引发严重的磨损和卡滞失效;接触副润滑良好时,油膜的"刚化效应"使球轴承振动的固有频率有所提高,润滑剂中含有弥散性污浊时,振动的幅度总体升高,但弥散性污浊不会改变球轴承振动的频率特性;浙江大学博士学位论文:球轴承振动的研究 5低速时,球轴承振动的基本特征呈现不稳定状态,随着转速的提高,球轴承振动的频率特性趋于稳定,固有频率频峰升高; 6理论分析表明,干接触时钢球和滚道表面波纹度的某些谐波分量能激励球轴承的振动,振动的幅值与谐波幅值成正比,实际球轴承中钢球的分布不可能完全均匀,波纹度的激励作用会随时发生;润滑接触的分析表明,波纹度的任意谐波分量均能激励球轴承的振动; 7球轴承的几何和结构参数分析表明,球轴承尺寸越大,径向、轴向和角振动的固有频率越低;钢球中心圆直径增大,球轴承的径向和轴向振动的固有频率基本不变,角振动的固有频率有所上升,振动的幅频特性基本不变;径向游隙加大使球轴承的径向振动固有频率降低,轴向和角振动的固有频率有所升高,径向振动幅频特性的幅值升高,而轴向和角向降低;钢球的数量增多使球轴承振动的固有频率上升,幅频特性的幅值下降,径向振动的幅值下降最为明显;外圈沟曲率半径系数增大使球轴承径向振动的固有频率升高,轴向和角振动的固有频率降低,径向幅频特性基本不变,轴向和角向幅频特性幅值升高;内圈沟曲率半径系数增大使径向、轴向和角振动固有频率均下降,振动幅频特性的幅值均有升高; 8试验对比表明,传感器采用探针式安装时,由于探针接触副接触特性的影响,钡(量得到的球轴承振动信号有失真,采用专门设计和制作的试验球轴承,以固定式安装加速度计,首次测量得到了球轴承振动的真实信号,通过对振动信号的分析,验证了球轴承振动的理论模型; 9)基于时间序列分析的AR模型适用于大样本球轴承振动信号的分析,以样本长度的均方根值作定阶上界,FPE做判阶准则,给出的AR谱光滑,频率分辨率高,是球轴承振动分析的简便而可靠的手段; 10以时频域分析的小波包变换分析球轴承异音信号能够比较好地定位和聚焦异音发生的时间,时间间隔,频率范围,同样是球轴承振动分析的可靠的手段,可用作球轴承故障诊断技术。
-
Methods Six cadaveric lumbar vertebrae were harvested and evaluated with dual-energy x-ray absorptiometry and quantitative computed tomography to assess bone mineral density. Matched, polyaxial pedicle screws were then randomly assigned by side and placed using the Magerl, Krag or caudad trajectory technique assisted by Iso-C 3D scan and 3D navigation system. Cyclic loading tests were performed with a maximum 250 N load at 3 Hz up to 30000 cycles while recording load and displacement. Stiffness quotients were calculated it comparison.
从尸体中获取6节腰椎椎体经DEXA和QCT检测骨密度值,证实为骨质疏松后在计算机导航下按随机分组的方法向12个椎弓根中置人不同方向的椎弓根螺钉,使用MTS-858生物力学仪脊柱力学测试平台进行±250N的循环负荷疲劳测试,记录负荷循环中的螺钉位移,计算系统的刚度系数并进行对比分析。
-
Overall, you, as end-customer will not directly benefit from PFC. In the long-term it will save you money and problems. Less load on the grid means less likeliness of black-outs. Less load on the power company's generators means that their prices will not go up as fast as they would when they needed to buy bigger generators.
整体来说,身为最终使用者不会直接从PFC电路设计受益,长远看来将为你省下金钱以及问题,电力系统上较小的负荷也代表跳电次数也会降低,发电厂发电机组负荷较少,代表电费不会因为他们需要更大的发电机组而提高。
-
Carrying Capacity:A light load for a bearhound is up to 1,028 pounds;a medium load,1,038-2,079 pounds; and a heavy load,2,080-3,120 pounds.
负重:熊猎犬轻载的时候能背负1028磅中的物品,中载为1038-2079磅,重载为2080-3120磅。
-
The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.
上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。
-
The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.
内昆铁路水溪沟大桥,中心里程为DK608+393.00,该桥的设计方案有三个,通过技术、经济比较,采用4×32m预应力混凝土简支梁桥方案,桥梁全长149.5m,I级单线铁路,设计时速为120km/h,设计荷载为中活载。上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。
-
In the paper, the common expression of the non-uniform load shareing factor was deduced, and a function parameter--forc-arm factor and the concept of ideal centre position were presented and their solutions were given, which makes it possible that the dimensions and the capability of load equilibrium of the mechanism could be determined. The criteria of optimum load balancing mechanisms selection were set up with consideration of the effects of frictions and turning pair clearances.
本文通过对平面连杆式均载机构的功能指标—载荷不均匀系数的推导和分析,提出了力臂系数、理想中心位置这样一些能反映均载机构功能与运动结构关系的参数与概念,并给出其求解方法,它们还可以用来确定平面连杆式均载机构各构件的最佳长度尺寸。
-
Fault current greater than the breaking load switching capacity, must ensure that fuse load switch can be dissolved up the rear sub-gates; when the fault current is less than the breaking load switching capacity, ensure the sub-gate and fuse load switch does not move.
故障电流大于负荷开关的开断能力时,必须保证熔断器溶断后负荷开关才能分闸;当故障电流小于负荷开关的开断能力时,保证负荷开关分闸而熔断器不动作。
-
On the basis of the roundly summing-up of the research on NSP inlands and overseas, the existed problems and developing trends are analyzed. The instructional meaning of estimating the annual load is higher than forecasting the load of sometime or some section. Aiming at the scarcity of data and the difficulties in building mechanism model, hydrological methods are used to calculate the annual load of NSP because the data needed in statistic methods is less. The NSP brought by livestock and poultry is also numbered and differentiated.
本文在对国内外非点源污染模型的研究进行较为全面的总结,分析存在的问题和发展趋势的基础上,针对非点源污染数据资料稀缺,机理模型难以建立而统计模型所需资料相对较易于获得,计算简便直观,并且在水环境规划管理中对年负荷量预测、估算的指导意义要大于对某一时点、某一断面的负荷量的模拟预测的情况,对非点源污染年负荷量估算时运用水文分析方法计算非点源污染年负荷量,并对畜禽养殖带来的非点源污染进行量化区分。
-
The main research contents are as follows:1. Through massive calculation, analysis and comparison, sum up the similarities and differences between the special-shaped cross sections and rectangular cross sections in mechanical features, between reinforced concrete special-shaped columns and rectangular columns in load-bearing capacity, ductility performance and provide necessary basic concepts and data for further understanding the characteristics of the special-shaped columns;2. Through massive elastic calculations and elasto-plastic analysis, under the preconditions of satisfying the code's requirements for axial compression ratio, limit value of lateral displacement and load-bearing capacity of normal section,oblique section and beam-column joint, under circumstances of different intensity of earthquake, structure dead weight, sort of site and column grid bay dimension, the variation regularity of maximum suitable height of structure, and thus sum up the maximum suitable height of structure for code for the purpose of macro-control while deciding the design scheme;3. Make a preliminary study on the stress feature of reinforced concrete special-shaped column and Z-shaped column of which the ratio of limb length to limb thickness is between 4~5 ,and the preliminary design method is suggested;4. Through elato-plastic time history dynamic analysis of typical projects, check up the weak storey of the special-shaped column structure and yielding, breaking and collapse mechanism to satisfy the earthquake resistant requirement to buildings of remaining stand under strong earthquake;5. Derive for project use simplified calculation formula of vibration period, suitable vibration period, suitable rigidity of special-shaped column structure through theoretical analysis, and provide an easy and practical method for deciding the structure scheme economically, safely and reasonably;6. Based on the study achievements in theory and massive analysis and calculations of this paper, sum up the regularities of inner force, deformation of special-shaped column structure and seismic conceptual design, and thus the suggection of seismic design of special-shaped column structures is presented.
本文研究的主要内容如下:通过大量的计算、分析和对比,总结出异形截面与矩形截面在力学特性、钢筋混凝土异形截面柱与矩形截面柱在承载能力、延性性能等方面的异同,为深入了解异形截面柱的特点提供必要的基本概念和数据;通过大量的弹性及弹塑性计算分析,在满足规程对轴压比、侧移限值及正截面、斜截面、节点承载力抗震验算要求的前提下,在不同抗震设防烈度、结构自重、场地类别及柱网开间尺寸情况下最大适宜高度的变化规律,并在此基础上总结归纳出异形柱结构的最大适用高度规定,可用于规程,以便于在确定方案时起到宏观控制的作用;对肢长与肢厚比在4~5的钢筋混凝土异形截面柱及Z形柱的受力特点进行初步探讨,提出初步的设计方法;通过对典型工程的弹塑性动力时程分析,检验异形柱结构的薄弱层及屈服、破坏、倒塌机制,以达到建筑物大震不倒的抗震设防要求;通过理论分析,推导出异形柱结构自振周期,以及适宜自振周期、适宜刚度的工程实用简化计算公式,为经济、安全、合理地确定结构方案提供简便实用的方法;在本文理论分析、计算以及大量的研究成果基础上,总结归纳出异形柱结构内力、变形的规律及抗震概念设计内容,并在此基础上提出异形柱结构的抗震设计建议。
- 相关中文对照歌词
- Load Me Up
- 推荐网络例句
-
On the other hand, the more important thing is because the urban housing is a kind of heterogeneity products.
另一方面,更重要的是由于城市住房是一种异质性产品。
-
Climate histogram is the fall that collects place measure calm value, cent serves as cross axle for a few equal interval, the area that the frequency that the value appears according to place is accumulated and becomes will be determined inside each interval, discharge the graph that rise with post, also be called histogram.
气候直方图是将所收集的降水量测定值,分为几个相等的区间作为横轴,并将各区间内所测定值依所出现的次数累积而成的面积,用柱子排起来的图形,也叫做柱状图。
-
You rap, you know we are not so good at rapping, huh?
你唱吧,你也知道我们并不那么擅长说唱,对吧?