查询词典 load up on
- 与 load up on 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Overall, you, as end-customer will not directly benefit from PFC. In the long-term it will save you money and problems. Less load on the grid means less likeliness of black-outs. Less load on the power company's generators means that their prices will not go up as fast as they would when they needed to buy bigger generators.
整体来说,身为最终使用者不会直接从PFC电路设计受益,长远看来将为你省下金钱以及问题,电力系统上较小的负荷也代表跳电次数也会降低,发电厂发电机组负荷较少,代表电费不会因为他们需要更大的发电机组而提高。
-
On conditions that sports technology come into being , keeping on adding load training will help improving sports technology. Further research declares that nerve connection which is set up by shaped action will be broken and new connection will be expended and differentiated till a new movement fixed after sports technology coming into being and sports intension overload. So sports technology is relative to a certain load training intension.
在运动负荷强度对运动技能形成的影响中,传统观念认为适宜的运动负荷强度有利于运动技能的形成,但是这里所指的运动技能的形成,实际上是建立在某一运动负荷强度下所形成的运动技能,当运动负荷强度超过原来已经适应的运动强度负荷时,已巩固了的运动技能动作所建立起的神经联系又被再次打破,产生新的泛化、分化直到建立新的动力定型。
-
An experimental set-up is designed to measure the load-deflection curve and the natural frequencies of the elastica. The measured load-deflection relation agrees with the theoretical prediction very well. On the other hand, the measured natural frequencies do not agree very well with the theoretical prediction, unless the mass of the moving clamp is taken into account.
我们设计一组实验装置以量测弹性板条的受力-变形曲线以及自然频率;受力-变形曲线的量测结果与理论值相当吻合,而自然频率的量测结果与理论值并不相符,但考虑滑动夹持端质量后,理论与实验值相符许多。
-
Machining process and general information:· General Information – Tooling o Plan to have own engineering group as company expands o Hwasung is subcontracted to do engineering currently o Uses same cutting tools as in Korea facility – all diamond o Regrind tools if can o Hwasung has capability to surface grind, repair dies, and make molds with wire EDM process · General Information – Machining o Boundary samples are used: okay, borderline, not good o Quality room has separate windows for incoming and outgoing parts o New equipment will be coming in from FM LaGrange plant o Each operation has pictures and job instructions for what to check and which gage to use to check part o Parts are manually loaded into machine or pallet, depending on line o Auditor checks parts for verification: after operator checks part, puts in bin, auditor checks part and reloads back on line o Have tool management system o A pokeyoke check is used for orientation prior to loading o Machines are guarded o Mostly have CNC machines o Manual chip collection systems o If automated, have robots with grippers to load/unload parts from pallets o After final inspection, operator visually inspects and loads onto plastic dunnage with the crown up and loads into the washer o Repairs: filing down of burrs or sharp edges after anodizing the crown o Have 2 Excello machines for special machining of the pin bores o 2.7% scrap for gasoline pistons o Cycle time is 18 seconds for gasoline piston o Process – Wash o Spray system o 4 stations: heated wash, wash with degreaser, 2 rinse stations o Uses RO water o Operator blow dries piston and puts on dunnage with crown up o Parts wheeled into coating room o Needs major improvements here o Chemical analysis done for bath in chemical room o Comments/Observations: o Relatively small piston facility, but plans for additional space.
加工工艺和一般信息:·–的一般信息工具 o 有自己的工程集团,随着公司的扩展计划 o Hwasung 是分包做当前工程 o 用途相同的扦插工具,如在韩国设施–所有钻石 o 回收料工具如果可以 o Hwasung 已表面研磨,修复模具,和模具丝电火花加工能力过程·一般信息–加工 o 界限示例用于:好交界,不好 o 质量房间有单独的窗口传入和传出的部件 o 新设备会在来从调频拉格朗日植物 o Each 操作具有图片和工作说明的什么复选,计为使用检查部分 o 部件是手动加载到机器或托盘,取决于行 o 审计检查验证零件:置于 bin,运算符检查部分后,核数师检查部分并重新加载回行上 o 有工具管理系统 o 为 pokeyoke 复选用于在加载之前的定位 o 机被保护 o Mostly 有数控机床 o 手动芯片收集系统 o 自动,如果有与要加载/卸载部分从托盘 grippers 机器人 o 后最终检验,运算符将直观地检查并加载到与塑料衬垫冠了与到洗衣机负荷 o 修复:提交下毛刺或锋利的阳极氧化冠后 o 有 2 Excello 机特别加工的销孔 o 2.7%废料的汽油活塞 o 周期时间是为汽油活塞式 18 秒 o 过程–洗 o 喷射系统 o 4 站:加热洗、与脱脂剂洗、 2 冲洗站 o 使用反渗透水 o 运算符吹干活塞式并将了放冠衬垫 o 部件轮式进涂层房间 o 需要重大改善在这里 o 为在化学的房间里浴做的化学分析 o 注释/结论: o 相对小活塞式设施,但额外的空间的计划。
-
The pseudo-static test which subjects to horizontal load on the A-type autoclaved aerated concrete block wall was adopted. Reinforced concrete beams were set up at the upper and lower ends of the test block, and the four-bar linkage device was provided to ensure that the top of the wall was only in translatory motion, not in rotation at the level force. Hydraulic synchronous loading device was adopted to simulate the vertical load which was produced by the wall of the housing interlayer.
对A类蒸压加气混凝土砌块墙体采用水平荷载作用下的伪静力试验,试件的上下两端设置了钢筋混凝土梁,通过四连杆装置保证墙体顶部在水平力作用下只有平动而无转动,并采用同步液压加载装置模拟房屋层间墙体作用的竖向荷载。
-
Under the condition of knowing trolly"s relation datas, the wire rop-load modle taking its load as the study object, using D"Alembert"s Principle and Hybrid method, solves out the mathematical expression of wire rop"s traction while settig the hiost speed; The elctronic motor-drum modle"s build up is attracted to the elctronic motor"s torque, and combines with the wire rop traction"s role on drum, only pay attation to the coupling"s flexibility and damping, which is between the elctronic motor and the reducer. The theory of transmission equations establishment is in Project Vibration.
钢丝绳—吊重模型是在小车运行机构的相关数据均已知的情况下,以吊重为研究对象,利用达朗伯原理和动静法,在假定起升速度已知后求解出钢丝绳牵引力的表达式;电动机到卷筒部分的模型则是建立在电动机输入转矩形式已知的基础上,结合钢丝绳牵引力作用在卷筒上的工作阻力矩,只考虑电动机与减速箱之间的联轴器的弹性阻尼,利用工程振动原理建立传动方程。
-
The main content included in the paper is as follows: The European identification methods of type of wave load is introduced and compared with the methods in Code of Hydrology for Sea Harbour. In order to reveal their difference, they are tested by the experiment data. The relation between phase and frequency are analysed through the Hilbert and wavelet transformations. And a new method of identifying the breaking wave load is set up based on the linear relation between wave height and wave press before the breakwaters. The probability distribution is tested by the statistic of experiment data. Based on the experiment data, the paper analysed the influence of reflection coefficient according to different factors, and its property is got. The work property of charmfered breakwater under breaking waves is analysed. Through the statisticof its wave press and wave force the distribution of press on the breakwater front face and its reducing effect to breaking wave force are proved.
本文基于此,通过实验研究,主要作了如下工作:介绍了欧洲波态划分方法,分析与我国方法的异同,通过实验进行了验证;通过 Hilbert 变换和小波变换对波浪破碎的相频特性进行了分析,通过建立波高与波压关系来判别破碎波浪力;对破波条件下波浪力的分布进行了统计研究,验证了其分布类型;利用实测资料,分析了不同因素对反射系数的影响,得出了不同周期、波浪要素、破碎率下反射系数体现的不同规律;分析了破碎波作用下削角堤的工作特性,通过对堤面所受的波压力和总力的统计分析,验证了压强分布规律及削角堤对波浪力的削减作用。
-
On the basis of the roundly summing-up of the research on NSP inlands and overseas, the existed problems and developing trends are analyzed. The instructional meaning of estimating the annual load is higher than forecasting the load of sometime or some section. Aiming at the scarcity of data and the difficulties in building mechanism model, hydrological methods are used to calculate the annual load of NSP because the data needed in statistic methods is less. The NSP brought by livestock and poultry is also numbered and differentiated.
本文在对国内外非点源污染模型的研究进行较为全面的总结,分析存在的问题和发展趋势的基础上,针对非点源污染数据资料稀缺,机理模型难以建立而统计模型所需资料相对较易于获得,计算简便直观,并且在水环境规划管理中对年负荷量预测、估算的指导意义要大于对某一时点、某一断面的负荷量的模拟预测的情况,对非点源污染年负荷量估算时运用水文分析方法计算非点源污染年负荷量,并对畜禽养殖带来的非点源污染进行量化区分。
-
In order to solve the poor load capacity of oil film bearings during the start-up process of tandem cold rolling mills, based on the hydrostatic bearing theory, a load bearing capacity model for oil film was established. The influences of screw-down tilting, hydraulic pump power and restrictor's hydraulic resistance on the hydrostatic pressure bearing-spindle system were calculated.
针对某CVC带钢冷连轧机启动阶段支持辊油膜轴承静压承载能力不足的问题,应用流体润滑理论,建立了轴承倾斜工作下静压承载能力的全润滑系计算模型,分析了轧机压下倾斜、油泵功率和节流器液阻对轴承静压承载性能的影响。
-
In this paper, test research have been performed on the two important mechanical properties indicator compressive modulus of elasticity and shear modulus. Numerical simulation has been performed on the base of results of test under the situation uniform and uneven thickness of elastomer layer, which analyze internal stress distribution of the elastomeric bearing, as follows:(1) The traditional test methods of compressive modulus of elasticity test are rather cumbersome and take up experimentalists lots of time. This paper has improved the traditional test methods of compressive modulus of elasticity test, which has collected the holding-load time together to concentrate on holding load. The tests have been performed on different types of bearings, which results show that the results of the improved test method conform to the error range regulated by the standard and can effectively save time for the experimentalists, also eliminate the accumulative error.
本文主要对板式橡胶支座的抗压弹性模量、抗剪弹性模量两个重要力学性能指标进行试验研究,并在试验结果的基础上对均匀胶层厚度和不均匀胶层厚度两种情况进行数值模拟,分析橡胶支座内部应力分布规律,具体内容如下:(1)传统抗压弹性模量试验方法比较繁琐,占用试验人员大量时间,本文对传统抗压弹性模量试验方法进行了改进,将持荷时间集中起来进行集中持荷,通过对不同类型支座进行试验,试验结果表明该改进试验方法所得结果符合标准规定误差范围,为试验人员节省了大量时间,并且还消除了传统方法中的累计误差。
- 推荐网络例句
-
On the other hand, the more important thing is because the urban housing is a kind of heterogeneity products.
另一方面,更重要的是由于城市住房是一种异质性产品。
-
Climate histogram is the fall that collects place measure calm value, cent serves as cross axle for a few equal interval, the area that the frequency that the value appears according to place is accumulated and becomes will be determined inside each interval, discharge the graph that rise with post, also be called histogram.
气候直方图是将所收集的降水量测定值,分为几个相等的区间作为横轴,并将各区间内所测定值依所出现的次数累积而成的面积,用柱子排起来的图形,也叫做柱状图。
-
You rap, you know we are not so good at rapping, huh?
你唱吧,你也知道我们并不那么擅长说唱,对吧?