英语人>网络例句>line process 相关的网络例句
line process相关的网络例句

查询词典 line process

与 line process 相关的网络例句 [注:此内容来源于网络,仅供参考]

After making a rough mix, Bono listens to and studies this comp over the next few days, changes a word or a line or a verse, rephrases and re-sings, and the process takes place again.

在做出一个月取的初次混合之后,波诺Bono,原名保罗大卫休森Paul David Hewson,U2主唱)会在接下来的几天间聆听,研究这部作曲,修改一个字,一句话,或者一个诗节,重新更换一些词,重唱,然后整个过程就会从头再来过。

On – Line Requisitioning Country Commodity Catalog Process?

在线征集国家商品目录进程

Meanwhile, Apple Computer is in the process of revamping its entire Macintosh line to run on Intel chips.

同时,苹果电脑正在调整其整个Macintosh的生产线,目的是为了使其能够使用英特尔的芯片。

This skews the process down the line-and ultimately hurts students.

这歪曲了的过程最终伤害了学生。

In paper and pulp making equipment aspect, can provide OCC treating Line and recycled newspaper/recycled culture paper/recycled life paper pulp-making lines including system equipments and process technologies such as slushing, cleaning, screening, washing, floatation de-inking, dispersion and bleaching etc.

在造纸纸浆设备方面,可以为客户提供OCC处理生产线,再生新闻纸、再生文化纸、再生生活用纸制浆生产线(包括碎解、除渣、筛选、洗涤、浮选脱墨、热分散和漂白等系统设备和工艺技术),以及化学浆封闭热筛选设备、商品浆处理设备,同时为客户提供备品备件服务。

Develop new vitrified products and optimize the process line to reduce manufacturing cost or improve product quality for Asian market.

为亚洲市场开发新的陶瓷砂轮产品和通过优化生产线来降低生产成本或提高产品质量。

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

内昆铁路水溪沟大桥,中心里程为DK608+393.00,该桥的设计方案有三个,通过技术、经济比较,采用4×32m预应力混凝土简支梁桥方案,桥梁全长149.5m,I级单线铁路,设计时速为120km/h,设计荷载为中活载。上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

Samsung R403-A05 using the all-black design, but also in the top of the notebook using a piano baking process, the machine is all the more eye-catching fashion, in line with the current popular trend, with a certain degree of visual impact.

三星R403-A05采用了全黑色的外观设计,而且在笔记本的顶盖上采用了钢琴烤漆工艺处理,使得整机显得更为时尚惹眼,符合目前流行的趋势,具有一定的视觉冲击力。

Especially the former has very important meaning when the real-time detecting and on-line evaluation are needed in arc welding process.

特别是前一点,在对弧焊过程质量进行实时检测及在线评价时,具有非常重要的意义。

第48/64页 首页 < ... 44 45 46 47 48 49 50 51 52 ... > 尾页
推荐网络例句

The labia have now been sutured together almost completely.The drains and the Foley catheter come out at the top.

此刻阴唇已经几乎完全的缝在一起了,排除多余淤血体液的管子和Foley导管从顶端冒出来。

To get the business done, I suggest we split the difference in price.

为了做成这笔生意,我建议我们在价格上大家各让一半。

After an hour and no pup, look for continued contractions and arching of the back with no pup as a sign of trouble.

一个小时后,并没有任何的PUP ,寻找继续收缩和拱的背面没有任何的PUP作为一个注册的麻烦。