查询词典 level out
- 与 level out 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
To area under administration as us enterprise of above of many 60 5 abbacy, dimensions executes the law administration of supervisory examination of the end that examines the work and many 200 safe production executes the law the make known to lower levels of writ, make " safe production law " plan of law waiting for a law and national level, occupation standard is able to carry out effectively, strong promoted an enterprise quality of safe production management, ensured the production of the enterprise is safe.
随着我们对辖区5个管区、60多家规模以上企业执法检查工作的结束和200多份平安生产监督检查行政执法文书的下达,使《平安生产法》等法律法规和国家标准、行业标准得以有效实施,有力提升了企业平安生产管理质量,确保了企业的生产平安。
-
Maximum rate of climb from sea level comes out at 51945ft/min with an absolute ceiling of 60701ft.
最大的比率攀登在和 60701 ft 的 absolute 天花板的 51945 ft/最小从海平面出来。
-
Force strength brand DCC800 parameters Serial program unit technical parameters 1 KN8000 clamping force 2 mm760 clamping trip 3 mould thickness (minimum - most mm400-950) 4 template size mm1400 level x x 1395 5 LinZhu elder brother mm910 910 from within 6 elder brother LinZhu mm180 diameter 7 booster shot force (KN665 8 mm760 trip shot materials 9 hammer mm80 diameter, 90, 100 10 shot Kg7.2 feed, and 9.1 11.2 11 casting Mpa132.8, 1.01, 85 12 casting cm2600 area, 760, 940 13 biggest casting 40Mpa area (cm22000) 14 shot cm2mm - 250 Kg/position 15 punch out mm297 distance 16 ejection chamber flange diameter mm200 17 ejection chamber flange plate height mm20 set out 18 top KN315 output 19 the mm180 trip 20 Mpa14 work pressure system 21 KW37 motor power 22 tank L1200 volume 23 machine Kg39400 weight 24 machine envelop dimensions by 2010 mm8
请可以把下列技术参数翻译成英语?力劲牌 DCC800参数序号项目单位技术参数 1锁模力KN8000 2 锁模行程 mm760 3模具厚度mm400-950 4模板尺寸mm1400×1395 5哥林柱内距mm910×910 6哥林柱直径mm180 7压射力KN665 8射料行程mm760 9锤头直径mm80、90、100 10 射料量 Kg7.2、9.1、11.2 11铸造压力Mpa132.8、104.9、85 12铸造面积cm2600、760、940 13最大铸造面积(40Mpa)cm22000 14压射位置Kg/ cm2mm-250 15冲头推出距离mm297 16压射室法兰直径mm200 17 压射室法兰凸出定板高度mm20 18顶出力KN315 19顶出行程mm180 20 系统工作压力Mpa14 21电机功率KW37 22油箱容积L1200 23机器重量Kg39400 24机器外型尺寸mm8660×2010×2780
-
Failed to transfer out of the picture is not a color distortion, that is, one short of the level of losses, as well as on South-South as well as on at a time, there is no quasi-three –particle spectrum is, how can the quality of the printed out good?
甘休称心满意,调不入来的图片不是颜色失假,不离是条理吃亏,一人调一个样,一次调一个样,操纵准谱,操纵一点次序性,这怎么能印制不入好的质度呢?
-
Those who for justified reasons wish to take out gold and silver but who are not covered by the above two paragraphs are required to hold a certificate issued by their own unit, by their urban street office or by an organ of the Peoples Government at higher than township level, as well as certificates of approved exit issued by the local Peoples Bank of China in respect of the names and quantities of items of gold and silver to be taken out.
凡不属前两款规定又确有正当理由的,必须持有所在单位或城镇街道办事处、乡人民政府以上机关证明,经当地中国人民银行验明所带金银
-
The checking of any setting-out or of any line or level by the Engineer shall not in any way relieve the Contractor of his responsibility for the accuracy thereof and the Contractor shall carefully protect and preserve all bench-marks, sight-rails, pegs and other things used in setting-out the Works.
工程师对任何放样或标高的检查不应以任何方式免除承包人对放样准确性所负的责任,承包人应仔细保护和保存在放样中使用的水准基点,龙门板,测桩和工程放样所用的其他标志物。
-
The checking of any setting-out or of any line or level by the Engineer shall not in any way relieve the Contractor of his responsibility for the accuracy thereof and the Contractor shall carefully protect and preserve all bench-marks, sight-rails, pegs and other things used in setting-out the Works.
工程师对任开工准备或何放线工作或任何基准或标高的检查均不能在任何方面解除承包商对上述各项的精度所负的责任,承包商应仔细保护的保留好一切水准点、视准轨、测桩和工程放线所用的其它物件。
-
The checking of any setting-out or of any line or level by the Engineer or the Engineers Representative shall not in any way relieve the Contractor of his responsibility for the correctness thereof and the Contractor shall carefully protect and preserve all bench-marks, sight-rails,pegs and other things used in setting-out the Works.
承包人不得因工程师或工程师代表对任何位置测定或任何线或任何水平面的检查而免去确保其正确无误的责任,承包人必须仔细保护和保存工程位置测定中使用过的水准点、观测杆、测标及其他物品。
-
The checking of any setting-out or of any line or level by the Engineer or the Engineer's Representative shall not in any way relieve the Contractor of his responsibility for the correctness thereof and the Contractor shall carefully protect and preserve all bench-marks, sight-rails, pegs and other things used in setting-out the Works.
承包人不得因工程师或工程师代表对任何位置测定或任何线或任何水平面的检查而免去确保其正确无误的责任,承包人必须仔细保护和保存工程位置测定中使用过的水准点、观测杆、测标及其他物品。
-
The primary principle of devolution and decentralization is very clear – to unburden the national government of responsibilities of attending to the basic needs of the people by shifting the responsibilities down to the LGUs where such needs can best be carried out, Thus, as Dr. Alex Briliantes and Jose Tiu Sonco II have aptly pointed out In their policy paper on strengthening devolution, The efficiency and effectiveness sof local government units in deliver public services at the local level have a great impact to human development outcomes and national economic growth.
&遵循的主要原则和权力下放的权力下放,是很清楚的-以摅国家政府的责任,参加基本满足人民需要的责任转移到LGUs这种需求,才能最好地进行,因此,作为博士亚历克斯Briliantes和Jose调Sonco二恰当地指出他们的政策文件,加强权力下放&的效率和效力的SOF地方政府单位在提供公共服务在地方一级产生重大影响人类发展的成果和国家的经济增长。
- 推荐网络例句
-
The split between the two groups can hardly be papered over.
这两个团体间的分歧难以掩饰。
-
This approach not only encourages a greater number of responses, but minimizes the likelihood of stale groupthink.
这种做法不仅鼓励了更多的反应,而且减少跟风的可能性。
-
The new PS20 solar power tower collected sunlight through mirrors known as "heliostats" to produce steam that is converted into electricity by a turbine in Sanlucar la Mayor, Spain, Wednesday.
聚光:照片上是建在西班牙桑路卡拉马尤城的一座新型PS20塔式太阳能电站。被称为&日光反射装置&的镜子将太阳光反射到主塔,然后用聚集的热量产生蒸汽进而通过涡轮机转化为电力