查询词典 lead time
- 与 lead time 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Lead time - 6 to 8 weeks approx.
筹建时间-6至8周约。
-
The digital platform for design, engineering analysis and simulation of coiler is constructed successfully. The engineering applications have proved that the system can shorten lead-time, lower costs and decrease loss effectively.
应用结果表明:该系统能够有效地缩短开卷机的产品开发周期,提高开卷机的设计质量,减少废品损失。
-
Recently, some inventory model literature considering lead time as a decision variable have been developed to search optimal strategy.
当缺货发生时,某些购买者会基於某特定供应商的忠诚及信赖等因素而愿意等待缺货的补足。
-
As the third-party logistics: First, to reduce operating costs of production; Second, to shorten delivery lead time cycle; Thirdly, optimization of enterprise business process improvement to create value-added services for customers.
由于第三方物流:第一,降低了生产运营成本;第二,缩短订货到送货的时间周期;第三,对企业业务流程的优化提升,为顾客创造增值服务。
-
The main contributions are summarized as the following.Firstly, assuming demand is segmented by order lead time, a joint pricing and capacity allocation model is formulated considering scenario-based demand. Due to the stochastic discrete variable in the model, robust optimization is used to solve the model. Numerical examples prove our model and method reflect the stochastic characteristics of demand and provide more pratical pricing and capacity allocation policies than other methods of deterministic and stochastic expectation programming methods especially when the capacity is tight.
本文的创新之处概括为如下几个方面:首先,假设制造企业根据交货提前期对市场细分,建立了考虑需求情境的BTO模式下制造企业定价与能力分配的集成模型,利用稳健优化规划方法对此随机模型进行转化和求解,算例仿真表明随机优化规划方法较确定性规划和随机期望值规划方法更好地反映了随机离散需求的分布和波动特征,更加接近实际运作情况;产能越紧张,各类需求的价格差距越大,三种规划方法给出的最优策略差距越大。
-
Lead time is an elementary factor in supply chain management, which has become a focus of recent research.
订货提前期是供应链管理中的基础性概念,对它的研究是近年来颇受关注的课题。
-
A nonstationary EOQ model with lead time uncertainty was discussed in this paper.
考虑了在订货时间不确定且EOQ不是整数情况下的最优订货量问题。
-
The delivery service that Shell offers your company depends on a combination of factor s including the product, quantity and lead-time.
壳牌向您的公司所提供的送货服务取决于各种因素,其中包括产品、数量以及订货至交货的时间。
-
ABSTRACT In recent years, the manufacturing industry has been experiencing strong demands for shortening product development lead time and strengthening product competence. In order to satisfy customer's needs and survive in the competitive market, Reverse Engineering has emerged as a crucial tool to perform accurate and rapid geometric reconstruction for complex shapes in product development.
近年来,机械制造业正面临着要求缩短产品开发周期和增强产品竞争力的考验,为满足用户的要求及自身市场生存的需要,逆工程技术就成为完成复杂物体精确测量和快速复制的一个重要手段。
-
"We weren't expecting this kind of lead time," Haynes says.
"我们不期待这种交付日期," Haynes 说。
- 推荐网络例句
-
According to the clear water experiment, aeration performance of the new equipment is good with high total oxygen transfer coefficient and oxygen utilization ratio.
曝气设备的动力效率在叶轮转速为120rpm~150rpm时取得最大值,此时氧利用率和充氧能力也具有较高值。
-
The environmental stability of that world - including its crushing pressures and icy darkness - means that some of its most famous inhabitants have survived for eons as evolutionary throwbacks, their bodies undergoing little change.
稳定的海底环境─包括能把人压扁的压力和冰冷的黑暗─意谓海底某些最知名的栖居生物已以演化返祖的样态活了万世,形体几无变化。
-
When I was in school, the rabbi explained everythingin the Bible two different ways.
当我上学的时候,老师解释《圣经》用两种不同的方法。