查询词典 lay shaft
- 与 lay shaft 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
At this time, loosen the connection screw of standard section with spanner, hang the shaft of hand crane on the upper angle bar, sway the shaft of hand crane upward, separate this standard section from the next section, and lay it in the suspension coop, dismantle the other standard section for the same method, and turn the shaft to another direction, draw the lifting wire rope tightly, the operation staff leave the suspension coop, open the lock stopping instrument, fall the suspension coop to next position and lock the brake instrument, the operation staff return to the top of suspension coop, continually dismantle note: forbid the staff leave on the top of suspension coop or in the coop when the suspension coop is running
8.1折除时,首先将吊笼用停层装置停靠在待拆除的标准节的下两节上,操作人员上到吊笼顶,卷扬机松绳,用小吊杆将顶梁略向上提起,拔出顶梁横销,使顶梁值得徐徐降下,降到拆除节下一节中间框架角处,并重新穿上横销,这时用板手将标准节连接螺栓松开,将手摇起重机小吊杆钩挂在待拆节上框架用钢土,到吊笼内,用同样的方法拆下另一节标准节,然后将吊杆转向不影响升降机运行的方向,收紧起升钢丝绳,操作人员离开吊笼,打开锁止机构,使吊笼下降到下一个拆除位置,并将锁止机构锁死,人员重返笼顶,进行下一拆除循环注意:在吊笼运行时绝不允许有人员留在吊笼顶部或吊笼内
-
When dismantle the machine, firstly, stop the suspension coop on the lower 2 sections of the standard sections, the operation staff go on the suspension coop top, the hoisting machine loosen rope, lift the pillar with small shaft, pull out the horizontal pin of pillar, let the pillar fall slowly to thedismantled section's middle angle bar, insert the horizontal pin again. At this time, loosen the connection screw of standard section with spanner, hang the shaft of hand crane on the upper angle bar, sway the shaft of hand crane upward, separate this standard section from the next section, and lay itin the suspension coop, dismantle the other standard section for the same method, and turn the shaft to another direction, draw the lifting wire rope tightly, the operation staff leave the suspension coop, open the lock stopping instrument, fall the suspension coop to next position and lock the brakeinstrument, the operation staff return to the top of suspension coop, continually dismantle note: forbid the staff leave on the top of suspension coop or in the coop when the suspension coop is running
8.1折除时,首先将吊笼用停层装置停靠在待拆除的标准节的下两节上,操作人员上到吊笼顶,卷扬机松绳,用小吊杆将顶梁略向上提起,拔出顶梁横销,使顶梁值得徐徐降下,降到拆除节下一节中间框架角处,并重新穿上横销,这时用板手将标准节连接螺栓松开,将手摇起重机小吊杆钩挂在待拆节上框架用钢土,到吊笼内,用同样的方法拆下另一节标准节,然后将吊杆转向不影响升降机运行的方向,收紧起升钢丝绳,操作人员离开吊笼,打开锁止机构,使吊笼下降到下一个拆除位置,并将锁止机构锁死,人员重返笼顶,进行下一拆除循环(注意:在吊笼运行时绝不允许有人员留在吊笼顶部或吊笼内
-
Objective: To study the survival and distribution of allogenic mesenchymal stem cells after implantation into other rabbits, evaluate osteogenetic effectiveness of collagen-sponge mixed with allogenic BMscs of rabbit in repairing of radial shaft defects, and lay the foundation for further application.
目的:了解兔骨髓间充质干细胞同种异体移植的存活分布情况及同种异体兔BMses复合胶原海绵情况,观察其对兔桡骨1.5cm缺损的修复效果,为将来的进一步应用莫定实验基础。
-
Through calculating the longest suppositional traverse model, when using grade E GPS to lay the near shaft point and electronic tacheometer (SET22D) to lay 7′′traverse under the shaft, the following results can be drawn: under the same or similar conditions, this design can meet the need of the 8300m longest mine holing through survey distance (the underground traverse is not more than 4300m), or the need of the long tunnels such as 1300m roads and railways.
通过笔者创建的可估算允许最大长度的虚拟导线模型进行推算,当采用E级GPS网测设近井点、全站仪(SET22D)测设井下7′′导线的情况下,得出了在类似测量条件下可满足8300m最长矿井贯通测量路线总距离(其中井下导线长度不超过4300m)、或1300m公路、铁路等长隧道贯通要求的结论。
-
When thy Son lay, pierced by the shaft which flies
当你的儿子倒下,为暗中飞来的箭
-
The main shaft drives the lay mechanism and is geared to another shaft which operates at half of the speed of the crankshaft.
这样,普通织机应具备两根轴,主轴驱动筘座并通过齿轮驱动另一根轴。
-
Thus a normal loom has two shafts. The main shaft drives the lay mechanism and is geared to another shaft which operates at half of the speed of the crankshaft.
这样,普通织机应具备两根轴,主轴驱动筘座,并通过齿轮驱动另一根轴。
-
Operate the hand crane, lift the first standard section by the self-install suspension shaft, and lay it down from the suspension coop and install on the basic section of the base, fix the standard section with basic section with screw.
4.4.2。操纵手摇起重机,用自装吊杆将第一个标准节吊起,从吊笼上面将标准节徐徐放下,安装到底座基础节上,将标准节与基础节用螺栓固定。
- 推荐网络例句
-
With Death guitarist Schuldiner adopting vocal duties, the band made a major impact on the scene.
随着死亡的吉他手Schuldiner接受主唱的职务,乐队在现实中树立了重要的影响。
-
But he could still end up breakfasting on Swiss-government issue muesli because all six are accused of nicking around 45 million pounds they should have paid to FIFA.
不过他最后仍有可能沦为瑞士政府&议事餐桌&上的一道早餐,因为这所有六个人都被指控把本应支付给国际足联的大约4500万英镑骗了个精光。
-
Closes the eye, the deep breathing, all no longer are the dreams as if......
关闭眼睛,深呼吸,一切不再是梦想,犹如。。。。。。