查询词典 labor relation
- 与 labor relation 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Withthe investigation "social labor" concept criticized., the "producing normal form"reviewed and the productivity and relations of production, economic base and the superstructural relation reviewed, based on Communication among the subjects, associate thetheory the form, regard social integration as the starting point and regard "studying themechanism" as the basic condition to rebuild. This text has exactly investigated such a course.
这种重建是在生活世界合理化的视阈下,分析&社会劳动&概念,批判性考察&生产范式&和&类的主体&范畴后,以主体间性和交往行为合理化为理论根基、以&社会一体化&、&学习机制&范畴为支架的重建。
-
Private school teachers,free-moving teachers,substitute teachers should be governmental employees and the relation between schools and these teachers should be rectified according to civil law and labor law.
公立中小学教师主要依据行政法法律制度,实行定期交流制度;民办学校教师、自由流动教师、代课教师可规定为政府雇员,主要依据民法规范学校与教师的劳动关系。
-
The Contractor shall be responsible for the true and proper setting-out of the Works in relation to original points, lines and levels of reference given by the Engineer in writing and for the correctness, subject as above mentioned, of the position, levels, dimensions and alignment of all parts of the Works and for the provision of all necessary instruments, appliances and labor in connection therewith.
承包人负责按工程师提交的书面参考原图的有关点、线和面的规定,忠实恰当地进行测定放线,如上所述,使工程的位置、水平、面积正确无误,并校准工程的各部分,且负责提供与工程相关的所有必要工具、设备和劳力。
-
The Contractor shall be responsible for the true and proper setting-out of the Works in relation to original points, lines and levels of reference given by the Engineer in writing and for the correctness, subject as above mentioned, of the position, levels, dimensions and alignment of all parts ofthe Works and for the provision of all necessary instruments, appliances and labor in connection therewith.
承包人负责按工程师提交的书面参考原图的有关点、线和面的规定,忠实恰当地进行测定放线,如上所述,使工程的位置、水平、面积正确无误,并校准工程的各部分,且负责提供与工程相关的所有必要工具、设备和劳力。
-
The Contractor shall be responsible for the true and proper setting-out of the Works in relation to original points, lines and levels of reference given by the Engineer in writing and for the correctness, subject as above mentioned, of the position, levels, dimensions and alignment of all parts of the Works and for the provision of all necessary instruments, appliances and labor in connection therewith.
承包人负责根据工程师的书面指示正确地开始工程,保证工程位置、面积、水平面及各部分组合的质量,提供工程所需工具、设备和劳力。此段译文的内容涉及到工程测量,由于译者缺乏对setting-out、levels和alignment等一些基本测量术语的必要了解,原文限定明确的承包商义务变得不知所云。改译:承包商应负责按工程师书面提交的原始基准点、基准线和参照标高如实准确地对工程进行放线,并在符合上述要求的情况下,负责校正工程各部分的位置、标高、尺寸和排列,同时提供一切有关的必要仪器、装置和劳力。
-
The Contractor shall be responsible for the true and proper setting-out of the Works in relation to original points lines and levels of reference given by the Engineer in writing and for the correctness subject as above mentioned of the position levels dimensions and alignment of all parts of the Works and for the provision of all necessary instruments appliances and labor in connection therewith.
承包人负责根据工程师的书面指示准确地开始工程,保证工程位置、面积、水平面及各部分组合的质量,提供工程所需工具、设备和劳力。n 此段译文的内容涉及到工程测量,由于译者缺乏对setting-out、levels和alignment等一些基本测量术语的必要了解,原文限定明确的承包商义务变得不知所云。改译:承包商应负责按工程师书面提交的原始基准点、基准线和参照标高如实准确地对工程进行放线,并在符合上述要求的情况下,负责校正工程各部分的位置、标高、尺寸和排列,同时提供一切有关的必要仪器、装置和劳力。
-
The Contractor shall be responsible for the true and proper setting-out of the Works in relation to original points, lines and levels of reference given by the Engineer in writing and for the correctness, subject as above mentioned, of the position, levels, dimensions and alignment of all parts of the Works and for the provision of all necessary instruments, appliances and labor in connection therewith.
承包人负责根据工程师的书面指示正确地开始工程,保证工程位置、面积、水平面及各部分组合的质量,提供工程所需工具、设备和劳力。
-
The Contractor shall be responsiblefor the true and proper setting-out of the Works in relation tooriginal points, lines and levels of reference given by theEngineer in writing and for the correctness, subject as abovementioned, of the position, levels, dimensions and alignment of allparts of the Works and for the provision of all necessaryinstruments, appliances and labor in connection therewith.
承包人负责根据工程师的书面指示正确地开始工程,保证工程位置、面积、水平面及各部分组合的质量,提供工程所需工具、设备和劳力。n 此段译文的内容涉及到工程测量,由于译者缺乏对setting-out、levels和alignment等一些基本测量术语的必要了解,原文限定明确的承包商义务变得不知所云。改译:承包商应负责按工程师书面提交的原始基准点、基准线和参照标高如实准确地对工程进行放线,并在符合上述要求的情况下,负责校正工程各部分的位置、标高、尺寸和排列,同时提供一切有关的必要仪器、装置和劳力。
- 推荐网络例句
-
The labia have now been sutured together almost completely.The drains and the Foley catheter come out at the top.
此刻阴唇已经几乎完全的缝在一起了,排除多余淤血体液的管子和Foley导管从顶端冒出来。
-
To get the business done, I suggest we split the difference in price.
为了做成这笔生意,我建议我们在价格上大家各让一半。
-
After an hour and no pup, look for continued contractions and arching of the back with no pup as a sign of trouble.
一个小时后,并没有任何的PUP ,寻找继续收缩和拱的背面没有任何的PUP作为一个注册的麻烦。