英语人>网络例句>joint 相关的网络例句
joint相关的网络例句

查询词典 joint

与 joint 相关的网络例句 [注:此内容来源于网络,仅供参考]

This article, based on key technique and different objective conditions in terms of geography and geology, such as soft soils, shallow water, and heavy sludge seen in ChangHong tunnel, presents features of key construction technique in ChangHong Project, such as slope stability and bottom settlement control in dry dock, cracks control and freeboard control technique respectively for element fabrication, pile foundation construction, and piles-tube connection technique, such technique like, sludge cleanup in immersion trench, and element sinking/positioning technique together with element joint (including connection to abutment and final joint).

文章根据沉管隧道工程建设的关键技术和宁波常洪隧道工程土软、水浅、淤重等客观地质地理环境条件,介绍了宁波常洪沉管隧道工程的施工技术特点,如干坞边坡稳定和管底基础变形的控制技术、本体防水混凝土管段制作的裂缝和干舷控制技术、管段江中桩基基础的施工和其与管底连接的技术工艺、管段基槽清淤和沉放定位施工技术,以及管段接头连接(包括与岸边段的连接和最终接头)的施工技术等。

This article, based on key technique and different objective conditions in terms of geography and geology, such as soft soils, shallow water, and heavy sludge seen in ChangHong tunnel, presents features of key construction technique in ChangHong Project, such as slope stability and bottom settlement control in dry dock, cracks control and freeboard control technique respectively for element fabrication, pile foundation construction, and piles-tube connection technique, such technique like, sludge cleanup in immersion trench, and element sinking/positioning technique together with element joint (including connection to abutment and final joint).

本文根据沉管隧道工程建设的关键技术和宁波常洪隧道工程土软、水浅、淤重等客观地质地理环境条件,介绍了沉管隧道工程的施工技术特点,如干坞边坡稳定和管底基础变形的控制技术、本体防水混凝土管段制作的裂缝和干舷控制技术、管段江中桩基基础的施工和其与管底连接的技术工艺、管段基槽清淤和沉放定位施工技术,以及管段接头连接(包括与岸边段的连接和最终接头)的施工技术等。

This article, based on key technique and different objective conditions in terms of geography and geology, such as soft soils, shallow water, and heavy sludge seen in ChangHong tunnel, presents features of key construction technique in ChangHong Project, such as slope stability and bottom settlement control in dry dock, cracks control and freeboard control technique respectively for element fabrication, pile foundation construction, and piles-tube connection technique, such technique like, sludge cleanup in immersion trench, and element sinking/positioning technique together with element joint (including connection to abutment and final joint).

本文根据沉管隧道工程建设的关键技术和宁波常洪隧道工程土软、水浅、淤重等客观地质地理环境条件,介绍了沉管隧道工程的施工技术特点,如干坞边坡稳定和管底基础变形的控制技术、本体防水混凝土管段制作的裂缝和干舷控制技术、管段江中桩基基础的施工和其与管底连接的技术工艺、管段基槽清淤和沉放定位施工技术,以及管段接头连接(包括与岸边段的连接和最终接头)的施工技术等。中国诺宇综合网http://www.siaaa.com

This article, based on key technique and different objective conditions in terms of geography and geology, such as soft soils, shallow water, and heavy sludge seen in ChangHong tunnel, presents features of key construction technique in ChangHong Project, such as slope stability and bottom settlement control in dry dock, cracks control and freeboard control technique respectively for element fabrication, pile foundation construction, and piles-tube connection technique, such technique like, sludge cleanup in immersion trench, and element sinking/positioning technique together with element joint (including connection to abutment and final joint).

本文根据沉管隧道工程建设的关键技术和宁波常洪隧道工程土软、水浅、淤重等客观地质地理环境条件,介绍了沉管隧道工程的施工技术特点,如干坞边坡稳定和管底基础变形的控制技术、本体防水混凝土管段制作的裂缝和干舷控制技术、管段江中桩基基础的施工和其与管底连接的技术工艺、管段基槽清淤和沉放定位施工技术,以及管段接头连接(包括与岸边段的连接和最终接头)的施工技术等。中国论文联盟http://www.lwlm.com

Various self-defense, joint-defense, livestock protection and other forms of joint-defense teams sprang up in various places to build roads, provide transport, dispatch mail, serve as guides, boil tea, send water, stand sentry and give first-aid to wounded PLA soldiers, effectively isolating the rebels.

他们主动配合人民解放军平息叛乱,各地群众纷纷组织自卫队、联防队、保畜队等自卫性组织,为平叛大军修路、运输、送信、引路、烧茶送水、站岗放哨、救治伤员,使叛乱分子陷于孤立。

Deformed or ankylosed joint surfaces were contoured and an interpositional layer inserted to resurface the joint and allow motion.

先对畸形或强直的关节表面外形进行修整,然后在其中插入间置物,恢复关节面并使之能够活动。

It has the metamorphic rock sight—"the Inartificial Gallery" which is black and white, devious and whirlabout and likes the reversal cloud-mist and rising sun, the granite vein injecting along the bedding of gneiss crossing the river-gorge—"the White Dragon Crossing River", nine veins apposing on the rock wall—"the Nine-dragon Wall","the Inartificial Wall " formed by the paragenesis of the level joint and the vertical joint, and the small and exquisite undercutting cave which is the wonder of the new tectonic movement.

有黑白相间、曲折盘旋,如云雾翻卷,似霞蔚蒸腾的变质岩景观――&天然画廊&,有沿片麻岩层理贯入的花岗岩脉,横跨河谷的&白龙过江&,有九条岩脉并列在岩壁之上的&九龙壁&,有水平节理与垂直节理巧妙共生而形成的&天然城墙&,有新构造运动遗迹――小巧玲珑的淘蚀洞穴。

As showed in Fig.1, the diagrammed stress of short time endurance test forAs showed in Fig.1, the diagrammed stress of short time endurance test for500 hours at 565℃on welded-joint of T91-F12 is 240MPa. Considering the℃on welded-joint of T91-F12 is 240MPa. Considering thedispersity of±20%, stress of check test for 500 hours is 192MPa. The result±20%, stress of check test for 500 hours is 192MPa. The resultof short time endurance test for 500 hours at 565of short time endurance test for 500 hours at 565℃on T91-X20CrMoV121℃on T91-X20CrMoV121welded-joints is showed in Tab.5. The result shows that the short timewelded-joints is showed in Tab.5. The result shows that the short timeendurance stress of weldedendurance stress of welded-joints with two procedures at 565℃for 500 hours-joints with two procedures at 565℃for 500 hoursboth above 192MPa, and meet the requirement.both above 192MPa, and meet the requirement.

依据图1,对T91-F12 焊接接头 565℃温度下的短时持久性能 500 小时考核试验依据图1,对T91-F12 焊接接头 565℃温度下的短时持久性能 500 小时考核试验的图示应力值应为 240MPa,按照持久强度试验数据的±20%的分散度,取 500的图示应力值应为 240MPa,按照持久强度试验数据的±20%的分散度,取 500小时考核试验应力值为 192MPa.T91-X20CrMoV121 焊接接头 565℃、500 小时小时考核试验应力值为 192MPa.T91-X20CrMoV121 焊接接头 565℃、500 小时短时持久考核试验试验结果见表5 ,试验结果表明,两种工艺条件下的焊接接头短时持久考核试验试验结果见表5 ,试验结果表明,两种工艺条件下的焊接接头565℃温度下的短时持久性能,500 小时的持久断裂应力均高于 192MPa,结果符565℃温度下的短时持久性能,500 小时的持久断裂应力均高于 192MPa,结果符合要求。

I think that we have seen that when he's rested he plays better, when he is not fatigue the knees is stronger and works better, when he fatigues then the muscles aren't protecting the joint as much and there's more stress on the area of the joint surface damage.

我想我们都看到了,当他休息了之后会打得更好些。当他感觉不到疲劳的时候,膝盖感觉更有力更好;当他疲劳的时候,肌肉就不足以保护关节,也就让关节表面受伤的部分承受更多的压力。

In case of (3) of this Article, the party which fails to perform its obligations under the joint venture agreement, contract and/or articles of association shall be liable for indemnifying the joint venture for its losses arising therefrom.

在本条第一款第(3)项情况下,不履行合营企业协议、合同、章程规定的义务一方,应当对合营企业由此造成的损失负赔偿责任。

第55/100页 首页 < ... 51 52 53 54 55 56 57 58 59 ... > 尾页
相关中文对照歌词
Rock This Joint
Rip This Joint
Mary's Joint
Rock This Joint
The Joint
Spanish Joint
Juke Joint
Praise Joint (Remix)
Praise Joint
Joint 2 Joint
推荐网络例句

And discuss some key point of integrated management system design, include hazard identification and risk assessment and risk control in the occupational health and safety management, the measure of satisfaction target of customer, the flawlessness of law system, the integration of the integrated management system and enterprise standardization system, unify lead institution and work orgnization, integreted internal audit and integrated management review.

同时,论述了一体化管理体系构建中的几个主要问题,包括职业健康安全管理中的危险源辨识、风险评价和风险控制、顾客满意度的科学监测、法律、法规体系的完善、一体化管理体系与企业标准化体系的有机结合、统一的领导机构和工作机构、一体化的内部审核和管理评审。

Deepwater Taranaki is investigated for its petroleum potential, using all available seismic data tied to shallow-water wells.

运用与浅水井相关的现有全部震波探测数据考察了深海区塔拉纳基盆地的油藏前景。

If you're huffing and puffing at any point during the run, slow down and make sure you can take deep breathes.

如果你任何时候在跑步过程中气喘如牛,降低速度并且确保你能够深呼吸。