查询词典 intersection chart
- 与 intersection chart 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
77 Using this result fig. 1 is entered on the bottom line vertically to the intersection of the chart line and the conversion factors are read in the left hand column.
答案:使用该结果,我们可以从图 1 的底线垂直向上作直线与图线相交,就可以从左边的纵坐标上读得相应的换算系数。
-
In consideration of the complex properties of the carbonate reservoirs in West Hubei and East Chongqing,their gas potential examination was carried out by use of the method of combining the target zone's small time window AVO analysis and AVO comprehensive response calibration with the intersection chart and AVO attribution contrasting analyses.
文章针对鄂西、渝东的碳酸盐岩储层复杂的特点,应用沿目的层的小时窗 AVO分析、AVO综合响应标定及交绘图分析、AVO属性对比分析相结合的方法来对该地区的碳酸盐岩储层含气性进行了检测,实例证明该AVO综合分析方法对碳酸盐岩储层中的油气检测是行之有效的
-
This four corners planimetric position schematic drawing following chart shows. A, B are two parapets, P1, the P2 place establishment two pressures sensitive sensors, uses in to examine whether has the train to pass the street intersection.
该交叉路口的平面位置示意图如下图所示。A、B是两个栏杆,P1、P2处设置两个压敏传感器,用于检测是否有火车通过路口。
-
Thirdly, it analyzes and studies in detail Surpac mechanism and the relevant concepts on constructing the model of mineral deposits and mining engineering systems according to the modeling procedure and the actual conditions of Jinchuan"s mines. Based on these:Lit points out some differences between the western countries and China in the practice of the geological data record, explores the inputting data on computers performed by more people at the same time and the method to improve constructing the data-base and finished the data-base of Jinchuan mineral deposits;2.It puts forward the steps and flow chart to construct the solid model and brings forward the scheme of "first individual then whole to set up Jinchuan mineral deposits geological model, summarizes some experiences for constructing the complicated geological ore body of the high accuracy: add control lines, add auxiliary demarcation lines +control lines, the operation of intersection, cross and incorporation between solid bodies and plane and section combination. The above-mentioned methods applied to construct the mineral deposits solid models of four mine areas in Jinchuan; 3.lt studies and presents the detailed flow chart of constructing block and grade model, analyses the workable scheme in setting up the block and grade model of main ore body for Jinchuan mineral deposits and also sets it up.
接着,按建模流程并结合公司矿山实情,详细研究、分析了Surpac构造矿床模型和采矿工程系统模型的机理、有关概念,在此基础上:(1)指出了西方国家与我国在地质数据记录习惯方面存在的一些差异,探索出多人多机同时录入、提高建库效率的方法,建立了金川矿床地质数据库;(2)研究并提出了构造实体模型的步骤和流程图及&先分后整&建立金川矿床地质体实体模型方案,总结出建立高精度复杂地质体模型几点经验:添加控制线法、添加辅助分界线+控制线法、实体间的交、叉、并运算法及平剖面图联合法,建立了金川矿床四个矿区主矿体的实体模型;(3)研究并提出了建立块模型、品位模型详细流程图,分析了建立金川矿床主矿体块模型和品位模型的可行方案,建立了金川矿床主矿体的块模型和品位模型。
- 推荐网络例句
-
Do you know, i need you to come back
你知道吗,我需要你回来
-
Yang yinshu、Wang xiangsheng、Li decang,The first discovery of haemaphysalis conicinna.
1〕 杨银书,王祥生,李德昌。安徽省首次发现嗜群血蜱。
-
Chapter Three: Type classification of DE structure in Sino-Tibetan languages.
第三章汉藏语&的&字结构的类型划分。