英语人>网络例句>interim audit 相关的网络例句
interim audit相关的网络例句

查询词典 interim audit

与 interim audit 相关的网络例句 [注:此内容来源于网络,仅供参考]

Chen Ying, deputy general manager of Baosteel, said that since April, the iron ore suppliers have been signed with the interim agreement will be based on final negotiated price to pay for the difference.

宝钢副总经理陈缨表示,自4月起,已与铁矿石供应商签订临时协议,将根据最终谈判确定的价格来支付差价。

Should an interim agreement notified under paragraph 7 of Article XXIV not include a plan and schedule, contrary to paragraph 5 of Article XXIV, the working party shall in its report recommend such a plan and schedule.

如一成员认为,按照第1款自己具有主要供应利益,则它应将其要求连同支持证据一起书面告知提议修改或撤销减让的成员,同时通知秘书处。

Du suggested that the Ministry of Agriculture would not issue a formal public notice about the extension of the interim agreement because the ministry already has notified or was about to notify affected foreign biotechnology seed companies.

杜青林表示,关于过渡性协议的延期,农业部不会发布正式的公告,因为农业部已经通知或即将通知那些受影响的外国转基因种子公司。

No further interim certificate may be issued following the initial six months referred to in paragraph 6 of this Standard.

在本标准第6款所述的最初六个月后不得再续发临时证书。

B the amount certified in each Interim Payment Certificate within 56 days after the Engineer receives the Statement and supporting document s; and

期中支付证书中开具的款额,时间是在工程师收到报表及证明文件之日起56天内;以及

For vessels 15 years of a ge and over, an Interim Certificate of Class can be issued only aft er losing

对于船龄大于等于15年的船舶,只有在原船级社完成对该轮提出的所有过期检验、过期遗留项

A declaration of maritime labour compliance need not be issued for the period of validity of the interim certificate.

在临时证书有效期内不必签发海事劳工符合声明。

So we are very pleased that announcement actually comes well before the scheduled April 20 expiration of the interim safety certificate program.

而现在实际的批复却远远早于4月20日这一过渡性安全证书措施的结束日期,因此我们感到非常欣慰。

7 "Interim Payment Certificate" means a payment certificate issued under Clause 14 , other than the Final Payment Certificate.

1.1.4.7"期中支付证书"指根据第14条颁发的付款证书,但不包括最终支付证书。

B the amount certified in each Interim Payment Certificate within 56 days after the Engineer receives the Statement and supporting documents; and

期中支付证书中开具的款额,时间是在工程师收到报表及证明文件之日起56天内;以及

第31/123页 首页 < ... 27 28 29 30 31 32 33 34 35 ... > 尾页
相关中文对照歌词
Sylvia (An Introduction)
RE: DEFinition
2-1
Rebels In Kontrol
J'roule
Wesh Wesh City
Timing Is Everything
Timing Is Everything (Acoustic)
Bout Dat Wo
Ra-Fall
推荐网络例句

Methods Clinical data of 3 cases of bile duct injury during laparoscopic cholecystectomy were analyzed retrospectively.

回顾总结3例LC术中胆管损伤的临床资料,分析3例胆管损伤的原因及对策。

These techniques are applied to the gobang.

本文将这些技术用于五子棋中。

I don't want to add to your trouble.

我不想给你增加麻烦。