英语人>网络例句>integrated project 相关的网络例句
integrated project相关的网络例句

查询词典 integrated project

与 integrated project 相关的网络例句 [注:此内容来源于网络,仅供参考]

Except the foreword, the article is divided into three chapters:The first chapter is to make a systematical analysis on the institution of reorganization project, which can be further partitioned into three sections: the first section states the institution of reorganization, probes into the proposal of Project and principles of its institution, and claims that in order to attain a practical and enforceable project, the reorganization project should be set down mainly by reorganizer under the assistance of debtor; the second section explains the principles that should be complied with during the institution process, and deems honesty and rationality, thoroughness as the three most important principles; the third section set forth the content of reorganization project.

这一章共分三节:在公司重整计划的制定上,主张以重整人为主、有债务人予以协助来制定公司重整计划最为科学,这样制定的公司重整计划最切合实际,最易于执行。指出公司重整计划制定时应遵循公正合理、兼顾、效率三个原则。第三节讲述了公司重整计划的内容。公司重整计划草案应该包括以下四点核心内容:债权的分类方案;债权债务重整方案;重整企业的经营方案;重整计划的执行期限。

Informatization project management is to adopt the basic methods of project management with the consideration of the characteristics specifical to the informatization project to carry out all-round planning, follow-up, and control in order to ensure the project per se and the outcome of project operation to meet their objectives.

信息化项目管理是针对信息化项目,采用项目管理的基本方法并结合信息化特点开发的管理方法,对信息化工程项目进行全面的计划、跟踪、控制,保证项目本身和项目的结果达到预期目标。

In this article is described the overview of Ling Ao Nuclear Power Plant Advanced Fuel Management project (1/4 core reload) Project, the first high burnup advanced fuel management project in China. The contents include the scope of the project, analysis and justification made for the project, licensing arrangement and site realization.

本文阐述了国内首个高燃耗先进燃料管理项目-岭澳先进燃料管理(AFM,Advanced Fuel Management project)1/4换料项目的总体情况,包括项目的内容和范围,项目分析和论证情况,项目的执照申请及安排,以及项目的实施情况。

The objectives of the workshop were to: expose participants to new trends on Interactive Radio Instruction; acquaint them with new skills and knowledge on IRI methodology, scripting and project cycle management; inculcate basic skills to enable participants facilitate, monitor and evaluate the project.; create a forum for interaction amongst the implementers of the project and front line workers to evolve best approaches to be adopted to move the IRI project forward, and to enhance the knowledge, skills and competencies of participants to strengthen their capacity to mobilise and sensitise pastoralists to support the IRI project initiative in schools.

此次研讨会有几个目标:介绍有关互动式广播教学的新趋势;透过训练,让参与者熟悉该教学方法,教案的写作及评估管理;灌输有助于有效执行与评估教案的基本技能;在所有的参与者之间,包括执行该训练计画的人以及第一线的工作人员,创造一个能够互动对话的空间,以引导出让互动式广播教学得以顺利进行的最佳方式;以及,增加所有参与者的知识,技能与竞争力以强化他们动员牧民的能力,让互动式教学能在学校顺利展开。

These "problem properties" from the causes can be divided into seven categories: The first is caused by disordered development; second is not strictly project approval, business-to-project development funds are not implemented; third is absconding money led to real estate developers failed to materialize; four the project to rely on bank loans, the state tightened money supply, no follow-up support for the construction funds for construction; five real estate policy is due to gradually improve over the past administrative allocation of land are required to pay a large number of land transfer and value-added tax to pay the gap too big , developers can not afford to pay; Sixth, the lack of project feasibility study, sales difficult construction projects shall not be able to implement; Seven developers for other economic cases sealed by the court project.

这些&问题性质&的原因可分为七类:第一是所造成的无序发展;二是不严格项目审批,企业对项目的开发资金不落实;三是潜逃钱导致房地产开发商未能实现;四个项目依赖于银行贷款,国家收紧货币供应量,没有后续支持建设建设资金;五年房地产政策是逐步改善,在过去的行政分配土地都必须支付了大量的土地转让和增值税支付的差距太大,开发商无力支付;第六,缺乏项目可行性研究,销售困难的建设项目将无法实施;七开发其他经济案件由法院密封项目。

The commercial part of the bid file , according to " norm that the inventory of project amount of construction project valuates " which national Ministry of Construction issues newly, applied mechanically in 2003 " unified the basic figure form in Hubei ",Detailed to is it divide some project amount inventory valuate form , measure project inventory valuate form , other project inventory valuate form and comprehensive unit price analytical table ,etc.

投标文件的商务部分依据国家建设部最新颁布的《建设工程工程量清单计价规范》,套用2003年《湖北省统一基价表》,详细完整地编制了分部分项工程量清单计价表,措施项目清单计价表,其他项目清单计价表和综合单价分析表等。

" Chinese highway journal " Chinese highway learns to sponsor, the definitive science journal that Chang'an university and academy of science of highway of the Ministry of Communication undertake jointly (ISSN 1001-7372, CN 61-1313/U), basically publish civil engineer, bridge and tunnel project, traffic project, car and car to use the paper of the domain such as machine of project, content shedding, economy and management, project, administrator of personnel of technology of the researcher that main constituency is highway traffic domain, project, economy reachs academical teachers and students.

梗概: 《中国公路学报》是中国公路学会主办的,长安大学和交通部公路科学探究院共同承办的权威性学术刊物(ISSN 1001-7372,CN 61-1313/U),主要刊载道路工程、桥梁和隧道工程、交通工程、汽车和汽车运用工程、物流、经济和管理、工程机械等领域的学术论文,主要读者为公路交通领域的科研人员、工程技术人员、经济管理人员及大专院校的师生。

Through the authorized strength of construction organization design, can consider all-sidedly the various specific execution conditions that will build project , foster strengths and circumvent weaknesses land will decide reasonable the programme of construction, determine construction order, construction method and labour organization, reasonably comprehensive arrangement will be under construction surely progress plan; To build the design scheme of project the reasonability on economy, the scientificness on technology with in enforcement the possibility on project expounds and proves offer basis; To build the unit planned and construction enterprise construction working plan and enforcement of authorized strength of capital construction of authorized strength to be under construction prepare to work to plan offer basis; Can will build construction and the design of project;, the construction organization work of technology and all construction arrangements of economy, front and rear and construction enterprise and specific project more combine closely; Can the construction unit and cooperation unit, department and department that directly attends , stage and stage and course - the relation between course coordinate better.

通过施工组织设计的编制,可以全面考虑拟建工程的各种具体施工条件,扬长避短地拟定合理的施工方案,确定施工顺序、施工方法和劳动组织,合理地统筹安排拟定施工进度计划;为拟建工程的设计方案在经济上的合理性,在技术上的科学性和在实施工程上的可能性进行论证提供依据;为建设单位编制基本建设计划和施工企业编制施工工作计划及实施施工准备工作计划提供依据;可以把拟建工程的设计与施工;、技术与经济、前方与后方和施工企业的全部施工安排与具体工程的施工组织工作更紧密地结合起来;可以把直接参加的施工单位与协作单位、部门与部门、阶段与阶段、过程-与过程之间的关系更好地协调起来。

Achievements: 1997-2000, planned, organized lodging claims against a German shipyard under a shipbuilding contract and won the arbitration case conducted by London Maritime Arbitrators' Association; 1999-2004, Represented CMC to participate five arbitration cases before CIETAC with satisfactory outcome for each;2001-2002, participated in negotiations as the leading counsel and successfully concluded contracts for several projects, including: a Cairo Cement Project (CMC as the general contractor, contractual value at US$65 million), Egypt; and b Barapukuria Power Plant Project (CMC as the general contractor, contractual value at US$220 million), Bangladesh.2002, participated in negotiations of equipment and technology transfer of Gas-Turbine between CNTIC and GE, successfully concluded contract; planned, organized lodging claim against BK a German company and recovered 15 million USD.2004, participated the tender project of nuclear power plant and technology transfer, particularly in designing the transaction structure; 2005, planned, organized solution of a dispute between CMC and a Danish company in a project under NORDIC loan and represented CMC to appear before SCC Arbitration Institute; 2005-2006, organized and participated legal work as the leading counsel for CMC the contractor in Turkish high speed railway project.

主要业务成果: 1997-2000年参与德国政府贷款船舶进口项目争议的解决,策划、组织了对外商索赔并赢得了由伦敦海事仲裁庭审理的仲裁案;作为代理人参加了5起贸仲仲裁案件和多起国内诉讼案件,均获得较好审理结果;2001-2002年参与出口埃及水泥厂项目和出口孟加拉坑口电站等多个海外项目,进行法律风险评估,参加合同谈判,修改合同文本并出具法律意见,促成交易;2002年参与燃气轮机打捆招标项目,审核合同文件,参加了与美国GE公司的谈判,成功签约;策划、参与对德国BK公司的索赔,成功获偿1530万美元;2004年参与核电站及技术转让招标项目,参与设计交易结构、审核相关合同文件;2005年作为代理人组织、参与了与丹麦公司因北欧投资银行项目产生争议在瑞典斯德哥尔摩商会仲裁院的仲裁案;2005-2006年主持、领导土耳其安伊高速铁路项目中方总包方的法律工作,包括包括参与设计交易安排,参与组织行政复审、司法复审程序等。

Develop thorough screening programmes to identify the "provincial project quality inspection teams working procedures"; Adjust steel detector, a few concrete Hin resilient devices, infrared ranger, concrete thickness detector, and more than 10 types of screening equipment, equipment; Equipped with cameras, video cameras and other evidentiary materials; requirements for the preparation of inspection units related materials "examined units and personnel original list" for the registration of imported works of the "Project Profile Form" for the inspection of the quality of acts related units "quality checklist" for the inspection of engineering information "Engineering Quality Inspection Records Form" for the inspection of the quality of engineering entities "Housing construction quality inspection log," and "decorative decoration quality inspection log","roads, bridges project quality inspection log," for inspection Liang, panels, pillars location and diameter steel "reinforcement location checklist" for the inspection of the concrete strength "concrete strength resilience testing Form" inspection works for the detection test units "laboratory quality checklist," and "laboratory examination of records in table","quality laboratory testing checklist" for the inspection of ready-mix concrete production enterprise "ready-mix concrete plant quality checklist","ready-mix concrete plant quality inspection records acts table","ready-mix concrete plant quality control inspection log","ready-mix concrete plant product quality inspection and Registration Form" for the examination of relevant personnel to mandatory standards of the "construction standards mandatory testing of the questionnaire table," for statistical findings of the "quality inspection Tables","Engineering Quality Inspection results summary","project quality inspection results tables","Punishment of project quality inspection list","quality check" and the "existence of major problems tables construction standards mandatory testing of the questionnaire tables."

制定周密的检查方案,确定《省工程质量检查组工作程序》;调校钢筋测定仪、混凝土数显回弹仪、红外线测距仪、混凝土板厚测定仪等十余种检查仪器、设备;配备照相机、摄像机等取证器材;编制用于要求受检单位提供有关材料的《受检单位及人员提供原件清单》,用于登记受检工程有关情况的《工程项目概况表》,用于检查相关单位质量行为的《工程质量检查表》,用于检查工程技术资料的《工程质量检查记录表》,用于检查工程实体质量的《房屋建筑工程质量检查记录表》、《装饰装修工程质量检查记录表》、《道路、桥梁工程质量检查记录表》,用于检查梁、板、柱钢筋位置和直径的《钢筋位置检查表》,用于检查混凝土强度的《混凝土强度回弹检测表》,用于检查工程检测试验单位的《试验室工作质量检查表》、《试验室检查记录表》、《试验室检测质量检查表》,用于检查预拌混凝土生产企业的《预拌混凝土厂工作质量检查表》、《预拌混凝土厂质量行为检查记录表》、《预拌混凝土厂质量管理检查记录表》、《预拌混凝土厂产品质量检查登记表》,用于考核相关人员掌握强制性标准情况的《工程建设标准强制性条文问卷考核情况表》,用于统计检查结果的《工程质量检查情况统计表》、《工程质量检查结果汇总表》、《工程质量检查结果统计表》、《工程质量检查处罚情况一览表》、《工程质量检查存在主要问题统计表》和《工程建设标准强制性条文问卷考核情况统计表》。

第5/500页 首页 < 1 2 3 4 5 6 7 8 9 ... > 尾页
相关中文对照歌词
Project Hallways
Project Window
Project Niggas
Project
Tell The World My Name
Project Window
Represent It
Don't Call Me No Mo
My Projects
Raise Ya Thumbs Up
推荐网络例句

A carrier gas such as nitrogen is directed through line 20 and valve 22 to connect with line 26 and mix with the gas sample.

如氮气之类的载体通过管线20和阀22引入,与管线26相通,与气体样品混合。

But for the most part, knaves and parasites had the command of his fortune

然而支配他的家产的大多是恶棍和寄生虫。

For he that is now called a prophet, in time past was called a seer.

他们就往天主的人所住的城里去了。