英语人>网络例句>installed 相关的网络例句
installed相关的网络例句

查询词典 installed

与 installed 相关的网络例句 [注:此内容来源于网络,仅供参考]

The development of wind generating is very fast in recent year, installed capacity grows in the rate of 30% percent year, wind generating has become new power which have the most maturate technology and developing scope and business future.

近来全球风电发展十分迅速,装机容量以年均30%以上的速度增长,风力发电已成为技术最成熟、最具开发规模和商业化发展前景的新能源。

If you have just installed Maven, it may take a while on the first run.

如果你刚刚装好Maven,首次执行这一命令会花一些时间。

When installed, it takes up 5 MB of space.

安装时,它占了5MB的空间。

It is understood that the company is part of the MCD power from wind energy, and they also installed a software package that is used to monitor and track energy usage.

据了解,MCD公司有一部分的电能来自风能,而且他们还安装了一个软件包,用于监控和跟踪能源的使用情况。

The trees and other plants along both sides of the road or along the median strip, as well as the installed advertisement boards and pipelines, etc., shall be kept a necessary distance away from the traffic facilities, and shall not shelter road lamps, traffic signal lamps or traffic signs, or impede the safe range of visibility, or affect the passage.

道路两侧及隔离带上种植的树木或者其他植物,设置的广告牌、管线等,应当与交通设施保持必要的距离,不得遮挡路灯、交通信号灯、交通标志,不得妨碍安全视距,不得影响通行。

Huainan coal co-operation with Shanghai Tian integrated set of power plants are under construction; co-operation with the German Ruhr coal chemical project is progressing well; 20 square kilometers of "coal chemical industrial city" projects under planning and development of coal chemical industry, By 2010, the Huainan coal mining will be formed the amount of 120 million tons production scale, with a total installed capacity to reach 10 million kilowatts, and the formation of several large-scale coal chemical industry base in megaton.

淮南煤矿公司与上海天的电厂综合设置操作正在建设中,与德国鲁尔煤化工项目合作进展顺利,20平方公里的"煤化工城"工程的规划和发展煤化工产业,到2010年,淮南煤矿将形成120万吨规模的金额,总装机容量达到1000万千瓦,和几个大型百万吨级煤化工产业基地的形成。

The installed capacity of this dam which is built across the world's three longest river is 18200 megawatt,and is more than 2 kilometers wide and 185 meters long.

这座装机容量1820万千瓦的大坝建在世界第三长的河流上,大坝长度超过2公里,高185米。

Was marked by a significant increase in the use of solar heating with sales of solar heating systems in Europe up more than 35%, getting close to 2,000 Megawatt Thermal of newly installed capacity.

2006年的一个重要标志是欧洲太阳光热采暖应用的增加,太阳能采暖系统的销售量上升了35%,相当于新装机热容量2,000兆瓦。

In the same year, 267 megawatts of on-grid PV cells were installed in Japan.

在同一年,日本安装了267兆瓦光伏电池于网络中。

In California, over 350 megawatts of trough solar systems have been installed in California alone.

在加利福尼亚州,单独安装在加利福尼亚州的槽式太阳能系统就超过350兆瓦。

第77/100页 首页 < ... 73 74 75 76 77 78 79 80 81 ... > 尾页
推荐网络例句

The reasons of iron ions content overproof in grade Ⅱ desalting water system,such as variation water quality,contamination of regenerant , operation adjustment of pretreatment system and switching operation of bed were discussed.

对二级脱盐水系统中铁离子含量超标的原因,如来水水质发生波动、再生剂受到污染、预处理系统操作调整、床体运行切换等进行了论述。

You were hired to drum up new business, so go and do it.

公司雇你招徕新业务,你就做你的事好了。

Who is in possession of this?

这是谁的?