英语人>网络例句>installation kit 相关的网络例句
installation kit相关的网络例句

查询词典 installation kit

与 installation kit 相关的网络例句 [注:此内容来源于网络,仅供参考]

The group company carries forward the corporate spirit of "devoted to your job, self-forgetful for your dedication, dare to explore, and fight for the first grade" long years and the business tenet of "Doing a project, building good reputation and developing a market" to get to further exploration and continuous progress. It has successively undertaken the widespread big and highly difficult engineering projects, such as the foundation project of Nanjing Tairun real estate development Co.,Ltd., the installation project of Beijing Wangfujin Mansion with an area of 100,000 m2,the construction project of Liyang Jinhui Plaza(the 1st 5-star hotel in Liyang), the installation project of Beijing Oriental Plaza, the steel frame installation project of Xiaoshan International Airport, Wuxi North-City Sewage Water Treatment Factory project, the machinery and electrical equipment installation project of Beijing Century Fortune Center, the LDPE factory construction project of Germany BASF company, the first section project of Baotou Tianci Rare Earth Co.,Ltd., the lifting and installing project of 600T 189.9M shipbuilding gantry crane of Dalian Xinchuan Heavy Industry Co.,Ltd., the elevator installation project of China Sci-tech Auditorium, the 220T/H boiler dismantlement and installation project of Anhui Chloro-Alkali Chemical Group Co.,Ltd., the boiler installation project of Wujin Steel Company and the pipeline installation project for leading Yellow River to Shanxi Province , the machinery and electrical equipment installation project of Wuxi P.E. Center Swimming Stadium. The company won tens of national, provincial and municipal-level good quality projects, and meanwhile got better economic and social benefits.

多年来,集团公司以"忠于职守,无私奉献,勇于开拓,争创一流"的企业精神,以"承一项工程,树一片信誉,辟一方市场"的经营宗旨,积极开拓,不断进取,先后承接了南京泰润房地产开发有限公司桩基工程,10万平方米北京王府井大厦机电安装工程,溧阳市锦汇商业广场建设工程,北京东方广场安装工程,浙江萧山国际机场钢结构安装工程,无锡城北污水处理厂工程,13万平方米北京世纪财富中心机电设备安装工程,德国投资巴斯夫LDPE建厂工程,浙江嘉兴嘉爱斯热电有限公司热网工程,包头天赐稀土东阿工业园区一期工程,南京黑色金属公司综合楼工程,大连新船重工有限责任公司600吨 189.9米造船龙门式起重机工程,中国科技会堂电梯安装工程,安徽氯碱化工集团220T/H锅炉汽机拆装工程,武钢中天240T/H锅炉安装工程,无锡市体育中心游泳馆机电安装工程,山西引黄管道安装工程等一大批远近闻名的重大工程和高难度工程,获得了几十项国家级、省市级优质工程奖和省市级文明工地称号,取得了较好的经济效益和社会效益。

The rate of c-kit+ cells in the heart increased gradually from E10 with the highest level of 12.6±3.2% at E11, which was nearly similar to the fetal liver, except for E12 when the c-kit+ cells was 3.4±1.2% in the heart compared to the fetal liver with 11.6±4.1% c-kit+ cells. The rate of c-kit cells in the suspension cells from the heart at E11 maintained stable after 24h culture based in the stromal cells of the heart and AGM region with the same conceptus age, but the rate of c-kit cells obviously decreased in the condition of the stromal cells from the fetal liver. The c-kit cells of the three conditions were all at low level at 48h without significant difference.

通过流式检测c-kit+细胞我们发现,胚胎期心脏和胎肝c-kit+细胞比率几乎一致,E11时c-kit+细胞明显增多,分别高达(12.6±3.2)%和(9.6±2.8)%,但E12时心脏中c-kit+细胞明显减少,仅为(3.4±1.2)%,此时胎肝中c-kit+细胞为(11.6±4.1)%。E11的悬浮细胞与心脏内皮细胞和AGM区基质共培养24h时,c-kit+细胞数量保持稳定,但在胎肝基质细胞中c-kit+细胞数量明显减少,在共培养48h,三组中的c-kit+细胞均呈较低水平,组间没有显著性差异。

Aiming at the situation of unable installation directly with crane of overloaded, overheight equipment in the equipment installation of 100t converter , equipment divided shifting craning installation and on-site integrate compound welding process are adopted and special installation working apparatus are designed, which assure the installation accuracy and realize one-time absolute installation.

针对100吨转炉设备安装过程中设备重量超载,超高,无法直接采用行车安装的情况,采用了设备分体移位吊装,现场整体组合焊接的施工工艺方案,设计专用安装工装,确保了设备安装精度并一次安装到位。

The calibration curve of the SM2-Kit with standard SM2 inhibitor was typical sigmoid curve fitted to the four parameter logistic equation with the linear detection of 0.625 μg/L to 80.0 μg/L (R2=0.9911), the sensitivity of 0.9 μg/L, the IC50 of 5.82 μg/L and the detection limit of 1 μg/L. The recoveries of SM2 spiked in pig feed were 83.4 %, in pig urine were 89.5 %. The precision and accuracy of the assay as determined by inter-assay and intra-assay coefficient variation was both below 15 %. The SM2-Kit generally had 2.08 % cross-reactivity towards sulfamerazine and little or no cross-reactivity towards other sulfonamides. The dilution solution of SM2 had no effect on results of SM2-Kit. The validity of SM2-Kit in 4 ℃ was above six months.

研究结果表明,SM2-Kit的标准曲线呈典型的S型,相关系数R2=0.9911,符合4参数logit曲线拟合,线性检测范围为0.625 μg/L~80 μg/L,灵敏度为0.9 μg/L,半数抑制浓度(IC50)为5.82 μg/L,检测限为1 μg/L;饲料样、猪尿样的平均添加回收率分别为83.4 %、89.5 %,平均批内和批间变异系数均低于15 %;SM2-Kit与磺胺甲基嘧啶的交叉反应率为2.08 %,与其它磺胺类药几乎没有反应性;基质对SM2-Kit的检测结果影响不大;试剂盒在4 ℃可保存6个月。

Than between the rN-ELISA and IDEXX ELISA kit (90.8%), therefore the rNM-ELISA was selected as a optimal method to prepare kit for determine antibodies to PRRSV. The storage life of the rNM-ELISA kit at 4℃ and -20℃ was 12 months at least by adding protein stabilizer to reagents in the kit, this provided pig industry for our country with a serodiagnostic method which had advantages of high sensibility、strong specificity、long period of validity、safety and no shedding PRRSV.

将建立的rN-ELISA和rNM-ELISA分别与IDEXX ELISA试剂盒进行比较检测327份猪血清,结果rN-ELISA和rNM-ELISA的特异性差异不大,rNM-ELISA与IDEXX ELISA试剂盒的阳性符合率相对较高(92.3%),选择rNM-ELISA作为制备PRRSV抗体检测试剂盒的方法。

Co-ordination between the railway company has four new Shenzhen Metro Corporation Board on the 1st line of the four target the installation of integrated electrical and mechanical equipment, Anhui Huadian Suzhou water pipeline project, the Shenzhen subway project between the installation of fire doors, Beijing Metro Line IV V standard integrated Electrical equipment installation and equipment engineering and environmental monitoring system, the Beijing Subway Line blanking integrated mechanical and electrical renovation project of Beijing Metro Line Willow on the 10th installation of depot facilities, the Beijing Olympic Park transport links underground access to install the Second Section of the Electrical and Mechanical Engineering , Baotou Coal Chemical Industry apotheosize the second installation of recycled water, the Beijing-Shanghai high-speed rail train Shanghai section.

公司先后配合中铁四局集团公司新建深圳地铁一号线四标的综合机电设备安装工程、安徽宿州华电给水管道工程、深圳地铁一期工程区间防火门安装工程、北京地铁五号线四标综合机电设备安装工程及环境与设备监控系统工程、北京地铁一号线综合机电消隐改造工程、北京地铁十号线万柳车辆段设备安装工程、北京奥林匹克公园地下交通联系通道二标段机电安装工程、包头神化煤化工第二循环水安装工程、京沪高铁上海动车段工程。

Construction and installation (work volume of construction and installation) refers to the construction of various houses and buildings and installation of various kinds of equipment and instruments, including construction of various houses, equipment foundations and industrial kilns and stoves, preparation works for project construction, and clearing up works post project construction, pavement of railways and roads, drilling of mines and putting up of oil pipes, construction of projects water conservancy, construction of underground air-raid shelters and construction of other special projects, installation of various machinery equipment, testing operation for pre-testing the quaily of installation projects.

建筑安装工程:指各种房屋、建筑物的建造工程和各种设备、装置的安装工程。包括各种房屋建造工程,各种用途设备基础和各种工业窑炉的砌筑工程;为施工而进行的各种准备工作和临时工程以及完工后的清理工作等;铁路、道路的铺设,矿井的开凿及石油管道的架设等;水利工程;防空地下建筑等特殊工程;以及各种机械设备的安装工程;为测定安装工程质量,对设备进行的试行工作。

Electrician Cheng checks and accept a standard: Switch of leakage of electricity is installed it is correct, normal to use; The installation of electric parts of an apparatus, equipment is secured should firm, level off; Experiment of electric equipment electrify, lamps and lanterns tries bright reach lamps and lanterns to control function good; The exterior of parts of an apparatus such as box of switch, electrical outlet, terminal is in good condition, insulation parts of an apparatus is flawless, installation is firm, smooth, installation means accords with a regulation; The switch of paratactic installation, electrical outlet the deviation of terminal box, the clearance of periphery of the face plate of box of dark outfit switch, electrical outlet, terminal, box accords with a regulation; Authority of function of weak cable system is complete, satisfy use requirement, implemental installation is firm, smooth.

电气工程验收标准:漏电开关安装正确、使用正常;电气器件、设备的安装固定应牢固、平整;电器通电试验、灯具试亮及灯具控制性能良好;开关、插座、终端盒等器件外观完好,绝缘器件无裂纹,安装牢固、平正,安装方式符合规定;并列安装的开关、插座终端盒的偏差,暗装开关、插座、终端盒的面板、盒周边的间隙符合规定;弱电系统功能权齐全,满足使用要求,器具安装牢固、平正。

Shaanxi-Ru 100 million construction and installation Decoration Engineering Co., Ltd. is engaged in building mechanical and electrical equipment installation, indoor and outdoor decoration, landscaping, fountain sculpture, construction steel, petroleum pipelines, corrosion insulation waterproofing, water and electricity HVAC, building curtain wall, intelligent engineering , communications equipment installation works, fire road traffic facilities and road roadbed, bridges and sports facilities, engineering design, construction, installation, construction decoration project budget and final accounts and audit preparation and audit consulting services, advertising, production and dissemination; Xi'an Highway Transportation Facilities Reflective signs of construction engineering, Xi'an, Xi'an, speed hump, protective Misnomer, Xian-chu, anti-collision warning, various traffic cone, wide-angle convex mirror, reflective vest, construction clothing, crash the water horse, contour standard, reflective spike , Anti-glare panels, bull barrel, triangle warning planes, the warning line, barrier tape, high-brightness lattice reflective film, parking locks, retaining wall protector, traffic Plum lights, traffic baton, reflective materials, hot melt crossed the road machine, Xi'an road cold spray liner machine, parking smart Barrier, Barrier intelligent toll station, as well as all levels of roads, community, school construction projects such as crossed.

陕西儒亿建筑安装装饰工程有限公司是从事建筑机电设备安装、室内外装饰装修、园林绿化、喷泉雕塑、建筑钢结构、石油管道、防腐保温防水工程、水电暖通、建筑幕墙、智能化工程、通讯设备安装工程、消防道路交通设施和公路路基路面、桥梁及体育场设施工程的设计、施工、安装,建筑装饰工程预决算与审计编制及审核咨询服务,广告设计制作与发布;西安公路交通设施工程部施工西安反光标志牌,西安橡胶减速带,防护隔离栏,西安防撞警示柱,各种交通锥,广角凸面镜,反光背心,施工服装,防撞水马,轮廓标,反光道钉,防眩板,防撞筒,三角警示架、警戒线、护栏带,高亮度晶格反光膜,车位锁,护墙角保护器,交通梅花灯,交通指挥棒,反光材料,道路热熔划线机,西安道路冷喷划线机,停车场智能道闸,收费站智能道闸,以及各级公路、社区、校园等划线施工工程。

The ice-making device of the present invention comprises a water tank detachably mounted to a rear surface of a refrigerator door; an ice-making housing detachably mounted to the rear surface of the door below the water tank and provided with a predetermined installation space therein; an ice tray mounted into the installation space and formed with a plurality of ice-making grooves in which water supplied from the water tank is frozen into ice; a valve assembly operating to selectively supply water stored in the water tank to the ice tray when the water tank is installed or withdrawn; and an ice bank for storing ice made in the ice tray, wherein the ice bank is installed in the installation space to be received in or withdrawn out of the installation space.

本发明的制冰装置包括:水箱,其以可拆卸方式安装到冰箱门的后表面上;制冰壳体,其在水箱的下方以可拆卸方式安装到门的后表面上,并在所述制冰壳体中设置有预定的安装空间;冰盘,其安装到安装空间中,并形成有多个制冰槽,从水箱供应的水在该多个制冰槽中冻结成冰;阀组件,其操作为当安装或拆卸水箱时选择性地将储存在水箱中的水供应到冰盘;以及储冰盒,其用于储存在冰盘中制成的冰,该储冰盒在安装空间中安装为能够放入在该安装空间中或从该安装空间抽出。

第1/368页 1 2 3 4 5 6 7 8 9 ... > 尾页
相关中文对照歌词
Trippy
Kit (What's The Scoop)
First Date Kit
Pioneers
Pack Up
Screw Done Already Warned Me
Maybe She Will
Tickle Cove Pond
Pledge Of Allegiance
Longform
推荐网络例句

A carrier gas such as nitrogen is directed through line 20 and valve 22 to connect with line 26 and mix with the gas sample.

如氮气之类的载体通过管线20和阀22引入,与管线26相通,与气体样品混合。

But for the most part, knaves and parasites had the command of his fortune

然而支配他的家产的大多是恶棍和寄生虫。

For he that is now called a prophet, in time past was called a seer.

他们就往天主的人所住的城里去了。