英语人>网络例句>installation 相关的网络例句
installation相关的网络例句

查询词典 installation

与 installation 相关的网络例句 [注:此内容来源于网络,仅供参考]

Co-ordination between the railway company has four new Shenzhen Metro Corporation Board on the 1st line of the four target the installation of integrated electrical and mechanical equipment, Anhui Huadian Suzhou water pipeline project, the Shenzhen subway project between the installation of fire doors, Beijing Metro Line IV V standard integrated Electrical equipment installation and equipment engineering and environmental monitoring system, the Beijing Subway Line blanking integrated mechanical and electrical renovation project of Beijing Metro Line Willow on the 10th installation of depot facilities, the Beijing Olympic Park transport links underground access to install the Second Section of the Electrical and Mechanical Engineering , Baotou Coal Chemical Industry apotheosize the second installation of recycled water, the Beijing-Shanghai high-speed rail train Shanghai section.

公司先后配合中铁四局集团公司新建深圳地铁一号线四标的综合机电设备安装工程、安徽宿州华电给水管道工程、深圳地铁一期工程区间防火门安装工程、北京地铁五号线四标综合机电设备安装工程及环境与设备监控系统工程、北京地铁一号线综合机电消隐改造工程、北京地铁十号线万柳车辆段设备安装工程、北京奥林匹克公园地下交通联系通道二标段机电安装工程、包头神化煤化工第二循环水安装工程、京沪高铁上海动车段工程。

Shaanxi-Ru 100 million construction and installation Decoration Engineering Co., Ltd. is engaged in building mechanical and electrical equipment installation, indoor and outdoor decoration, landscaping, fountain sculpture, construction steel, petroleum pipelines, corrosion insulation waterproofing, water and electricity HVAC, building curtain wall, intelligent engineering , communications equipment installation works, fire road traffic facilities and road roadbed, bridges and sports facilities, engineering design, construction, installation, construction decoration project budget and final accounts and audit preparation and audit consulting services, advertising, production and dissemination; Xi'an Highway Transportation Facilities Reflective signs of construction engineering, Xi'an, Xi'an, speed hump, protective Misnomer, Xian-chu, anti-collision warning, various traffic cone, wide-angle convex mirror, reflective vest, construction clothing, crash the water horse, contour standard, reflective spike , Anti-glare panels, bull barrel, triangle warning planes, the warning line, barrier tape, high-brightness lattice reflective film, parking locks, retaining wall protector, traffic Plum lights, traffic baton, reflective materials, hot melt crossed the road machine, Xi'an road cold spray liner machine, parking smart Barrier, Barrier intelligent toll station, as well as all levels of roads, community, school construction projects such as crossed.

陕西儒亿建筑安装装饰工程有限公司是从事建筑机电设备安装、室内外装饰装修、园林绿化、喷泉雕塑、建筑钢结构、石油管道、防腐保温防水工程、水电暖通、建筑幕墙、智能化工程、通讯设备安装工程、消防道路交通设施和公路路基路面、桥梁及体育场设施工程的设计、施工、安装,建筑装饰工程预决算与审计编制及审核咨询服务,广告设计制作与发布;西安公路交通设施工程部施工西安反光标志牌,西安橡胶减速带,防护隔离栏,西安防撞警示柱,各种交通锥,广角凸面镜,反光背心,施工服装,防撞水马,轮廓标,反光道钉,防眩板,防撞筒,三角警示架、警戒线、护栏带,高亮度晶格反光膜,车位锁,护墙角保护器,交通梅花灯,交通指挥棒,反光材料,道路热熔划线机,西安道路冷喷划线机,停车场智能道闸,收费站智能道闸,以及各级公路、社区、校园等划线施工工程。

The ice-making device of the present invention comprises a water tank detachably mounted to a rear surface of a refrigerator door; an ice-making housing detachably mounted to the rear surface of the door below the water tank and provided with a predetermined installation space therein; an ice tray mounted into the installation space and formed with a plurality of ice-making grooves in which water supplied from the water tank is frozen into ice; a valve assembly operating to selectively supply water stored in the water tank to the ice tray when the water tank is installed or withdrawn; and an ice bank for storing ice made in the ice tray, wherein the ice bank is installed in the installation space to be received in or withdrawn out of the installation space.

本发明的制冰装置包括:水箱,其以可拆卸方式安装到冰箱门的后表面上;制冰壳体,其在水箱的下方以可拆卸方式安装到门的后表面上,并在所述制冰壳体中设置有预定的安装空间;冰盘,其安装到安装空间中,并形成有多个制冰槽,从水箱供应的水在该多个制冰槽中冻结成冰;阀组件,其操作为当安装或拆卸水箱时选择性地将储存在水箱中的水供应到冰盘;以及储冰盒,其用于储存在冰盘中制成的冰,该储冰盒在安装空间中安装为能够放入在该安装空间中或从该安装空间抽出。

The location and orientation control valves installed in accordance with design drawings and design H44X rubber disc check valves documents provided, the installation location should have sufficient operating space for installation, operation and maintenance; its location should be avoided in a vibration, humidity, susceptible to mechanical damage , there is strong electromagnetic interference, high temperature, severe temperature changes and corrosive gases in place; installation should be firm, smooth; installation position should enable the control valve of the upper part of the implementing agencies in the regulation of body, Figure 6-8 shows a straight stroke control valve a variety of mounting positions.

1控制阀安装位置和方位按照设计图纸和设计文件的规定,安装位置应具有足够的操作空间,用于安装、操作和维护;其位置应避免安装在有振动、潮湿、易受机械损伤、有强电磁干扰、高温、温度变化剧烈和有腐蚀性气体的场所;安装应牢固、平整;安装方位应使控制阀的执行机构在调节机构上部,图6—8显示了直行程控制阀的各种安装方位。

The group company carries forward the corporate spirit of "devoted to your job, self-forgetful for your dedication, dare to explore, and fight for the first grade" long years and the business tenet of "Doing a project, building good reputation and developing a market" to get to further exploration and continuous progress. It has successively undertaken the widespread big and highly difficult engineering projects, such as the foundation project of Nanjing Tairun real estate development Co.,Ltd., the installation project of Beijing Wangfujin Mansion with an area of 100,000 m2,the construction project of Liyang Jinhui Plaza(the 1st 5-star hotel in Liyang), the installation project of Beijing Oriental Plaza, the steel frame installation project of Xiaoshan International Airport, Wuxi North-City Sewage Water Treatment Factory project, the machinery and electrical equipment installation project of Beijing Century Fortune Center, the LDPE factory construction project of Germany BASF company, the first section project of Baotou Tianci Rare Earth Co.,Ltd., the lifting and installing project of 600T 189.9M shipbuilding gantry crane of Dalian Xinchuan Heavy Industry Co.,Ltd., the elevator installation project of China Sci-tech Auditorium, the 220T/H boiler dismantlement and installation project of Anhui Chloro-Alkali Chemical Group Co.,Ltd., the boiler installation project of Wujin Steel Company and the pipeline installation project for leading Yellow River to Shanxi Province , the machinery and electrical equipment installation project of Wuxi P.E. Center Swimming Stadium. The company won tens of national, provincial and municipal-level good quality projects, and meanwhile got better economic and social benefits.

多年来,集团公司以"忠于职守,无私奉献,勇于开拓,争创一流"的企业精神,以"承一项工程,树一片信誉,辟一方市场"的经营宗旨,积极开拓,不断进取,先后承接了南京泰润房地产开发有限公司桩基工程,10万平方米北京王府井大厦机电安装工程,溧阳市锦汇商业广场建设工程,北京东方广场安装工程,浙江萧山国际机场钢结构安装工程,无锡城北污水处理厂工程,13万平方米北京世纪财富中心机电设备安装工程,德国投资巴斯夫LDPE建厂工程,浙江嘉兴嘉爱斯热电有限公司热网工程,包头天赐稀土东阿工业园区一期工程,南京黑色金属公司综合楼工程,大连新船重工有限责任公司600吨 189.9米造船龙门式起重机工程,中国科技会堂电梯安装工程,安徽氯碱化工集团220T/H锅炉汽机拆装工程,武钢中天240T/H锅炉安装工程,无锡市体育中心游泳馆机电安装工程,山西引黄管道安装工程等一大批远近闻名的重大工程和高难度工程,获得了几十项国家级、省市级优质工程奖和省市级文明工地称号,取得了较好的经济效益和社会效益。

Aiming at the situation of unable installation directly with crane of overloaded, overheight equipment in the equipment installation of 100t converter , equipment divided shifting craning installation and on-site integrate compound welding process are adopted and special installation working apparatus are designed, which assure the installation accuracy and realize one-time absolute installation.

针对100吨转炉设备安装过程中设备重量超载,超高,无法直接采用行车安装的情况,采用了设备分体移位吊装,现场整体组合焊接的施工工艺方案,设计专用安装工装,确保了设备安装精度并一次安装到位。

Construction and installation (work volume of construction and installation) refers to the construction of various houses and buildings and installation of various kinds of equipment and instruments, including construction of various houses, equipment foundations and industrial kilns and stoves, preparation works for project construction, and clearing up works post project construction, pavement of railways and roads, drilling of mines and putting up of oil pipes, construction of projects water conservancy, construction of underground air-raid shelters and construction of other special projects, installation of various machinery equipment, testing operation for pre-testing the quaily of installation projects.

建筑安装工程:指各种房屋、建筑物的建造工程和各种设备、装置的安装工程。包括各种房屋建造工程,各种用途设备基础和各种工业窑炉的砌筑工程;为施工而进行的各种准备工作和临时工程以及完工后的清理工作等;铁路、道路的铺设,矿井的开凿及石油管道的架设等;水利工程;防空地下建筑等特殊工程;以及各种机械设备的安装工程;为测定安装工程质量,对设备进行的试行工作。

There is still a great distance the classic economic result.Component prefabrication and installation is a very important and common used work in construction,and installation is much more difficult in which while harbors or other engineering that under the water are constructed.Installation style will play an important role in the engineering cost.As a resuit,there is a great sense in researching advanced,practical,efficiency installation technique.

在港口码头及其它水工工程中,构件预制和安装是一种很常用、很重要的施工内容,其中构件的安装更是一项技术难度较大的施工内容,不同的安装方法也在很大程度上影响工程成本,因此研究先进、实用、高效的安装施工技术,具有重大的意义。

Option One: a multi-polar set of ordinary water pipe installation balancing valve hole ① in charge of water pipe line and the 20-hole HVAC balancing valves installed ② Install a balancing valve in the shaft exit ③ air box installed in each balancing valve ④ In each of the tenants on the installation of balancing valve outlet Option Two: Using the Dynamic Balance valve ① fan coil unit installed in the end of the balancing valve ② air-condition the box at the end of the balancing valve is installed After the economic comparison, the final adoption of the balance valve program ① air box end of the installation of balancing valve and the automatic control valve ② retail and office space within the District, a combination of two or three fan coil balancing valves and automatic control valves, each fan coil outside the district office for personal use of a balance valve and automatic control valve 3, balance valve application summary ① long pipeline DRS installation of large multi-level system price higher than the end of the normal balance valve device a dynamic balance valve.

方案一:多极设置普通水管井间安装平衡阀①在主管线与20个暖通水管井间安装平衡阀②在竖井出口位置安装平衡阀③在每个空调箱上安装平衡阀④在每个租户的出水口上安装平衡阀方案二:使用动态平衡阀①在末端装置风机盘管上安装平衡阀②在末端装置空调箱上安装平衡阀经过经济比较,最终采纳的平衡阀方案是①空调箱末端安装平衡阀及自控阀②零售和内区写字楼两或三个风机盘管合用一个平衡阀及自控阀,外区写字楼每个风机盘管自用一个平衡阀及自控阀 3、平衡阀应用总结①长管线异程大系统多级安装普通平衡阀价格高于末端设备一级动态平衡阀。

Electrician Cheng checks and accept a standard: Switch of leakage of electricity is installed it is correct, normal to use; The installation of electric parts of an apparatus, equipment is secured should firm, level off; Experiment of electric equipment electrify, lamps and lanterns tries bright reach lamps and lanterns to control function good; The exterior of parts of an apparatus such as box of switch, electrical outlet, terminal is in good condition, insulation parts of an apparatus is flawless, installation is firm, smooth, installation means accords with a regulation; The switch of paratactic installation, electrical outlet the deviation of terminal box, the clearance of periphery of the face plate of box of dark outfit switch, electrical outlet, terminal, box accords with a regulation; Authority of function of weak cable system is complete, satisfy use requirement, implemental installation is firm, smooth.

电气工程验收标准:漏电开关安装正确、使用正常;电气器件、设备的安装固定应牢固、平整;电器通电试验、灯具试亮及灯具控制性能良好;开关、插座、终端盒等器件外观完好,绝缘器件无裂纹,安装牢固、平正,安装方式符合规定;并列安装的开关、插座终端盒的偏差,暗装开关、插座、终端盒的面板、盒周边的间隙符合规定;弱电系统功能权齐全,满足使用要求,器具安装牢固、平正。

第1/100页 1 2 3 4 5 6 7 8 9 ... > 尾页
推荐网络例句

The concept of equivalent rotationally rigidity is offered and the formula of rotationally rigidity is obtained.

主要做了如下几个方面的工作:对伸臂位于顶部的单层框架—筒体模型进行分析,提出了等效转动约束的概念和转动约束刚度的表达式。

Male cats normally do not need aftercare with the exception of the night after the anesthetic.

男猫通常不需要善后除了晚上的麻醉。

Its advantage is that it can be used in smaller units.

其优点在于可以在较小的单位中应用。