英语人>网络例句>in fault 相关的网络例句
in fault相关的网络例句

查询词典 in fault

与 in fault 相关的网络例句 [注:此内容来源于网络,仅供参考]

Cophasal axes on seismic sections play an important role in geologic stratification, fault interpretation, detection of cavities and other anomalous bodies in geophysical prospecting.

地球物理勘探中,地震剖面中的同相轴对地质分层、断层解释、有无形成空洞以及其它异常体的检测中作用重要。

In order to ensure the reliable operation of the long-distant undersea optical cable, it is necessary to detect the delitescent fault in earliest time.

摘要为了保障长途海底光缆的运行可靠性,需要尽早发现潜在的故障。

Near the Panzhihua village,a few gullies and the crests between them are dextrally offset by the Mengzidongshan fault with a displacement of 40~50m,other gullies are incised 10m in depth in piedmont alluvial fans.

冲沟在山前形成了年龄分别为31kaBP和39kaBP的2级洪积阶地,呈现出年轻阶地位错量大于老阶地的反常现象。

Furthermore, abundant hydrocarbon enriches in high quality sand-body traps by lateral confluence pathway in digitiform sand and fault vertical confluence pathway.

此外,存在汇流通道是油气富集的重要因素,充足的油气通过指状砂体侧向汇流通道和断层垂向汇流通道运移,在优质的砂岩体圈闭中聚集成藏。

China, in its headlong attempts to modernize, has often demonstrated a dismayingly cavalier attitude toward the well-being of its people: skyscrapers are built with little attention to safety standards and are invariably far from earthquake-resistant; huge dams ― not least the monstrosity that has so ruined the Three Gorges of the Yangtze ― are erected in a slapdash fashion; subways, like the system burrowing through the waterlogged alluvium beneath Shanghai, are built with incautious haste; freeway tunnels are bored through earthquake fault zones.

呼唤现代化的中国往往对民众的福祉展现出惊人轻慢的态度:摩天大楼的建造很少注意安全标准,远远不能抗震;巨大的水坝仓促落成;地铁的建造也是不谨慎的匆忙,例如穿过积水冲积层上海地铁系统;高速公路隧道的钻孔经过地震断裂带。

Product fault ink UN-uniform UN-uniform ink products were:(1) water and ink, ink and wash painting the rubber roll version of wear, spindle bearing wear, cots epiderm aging decline, ink, etc;(2) series water roll of layer debranning, cylindricity wear, a thin layer of shoulderpieces for intergradle monlchamus, a product of long a portion of the Ribbon, resulting in a roller 跞 movement oscillating anisotropism;(3) support by Edition of water, rollers, the cylinder, swayig stand, wear, resulting in version tiaodong Cot by cause pressure by version is unstable, produce ink imbalance, ink, ink plate, staves, relying on the old version (students'overloaded) version of COTS and pressure;(4) the water roll chemiluminscent set of aging or poor quality water decline caused by transmission;(5) does not have a regular check of the drum-and-ink roller and version by version-and-ink roller and pressures;(6) if the drum gear wear, and gear spacing is the same as the regular ink "" gear.

二、产物墨色不平均障碍产物墨色不平均的来因有:(1)传水、传墨、匀墨和靠版水墨各橡胶辊的圆柱度磨损超不差,拆轴承的轴脚磨损,胶辊不内脏嫩化,传墨本领回升等;(2)串水辊度层脱皮,圆柱度磨损超不差,暗地有薄积墨层,两脚长出局部有积墨带,变不败滚子跞不静串墨不不平衡;(3)撑持靠版水、墨辊的锁脚,摆不静支架,磨损惨重,变不败胶辊靠版时跳不静致使靠版不抬辛不安定,爆发水墨不不平衡,呈现墨色不不平衡、干版、水墨杠、嫩版等本体;(4)水辊绒套嫩化或质度不差变不败传水本领回升;(5)操纵按期校核各水墨辊及版滚筒与靠版水墨辊的不抬辛;(6)若滚筒传不静齿轮磨损超不差,呈现与齿轮间距不异的有次序的&齿轮墨杠&。不一、套印障碍 1。

Some methods aiming at the two problems have been researched. First, the optimal number of ATE site can be calculated based on a cost model of DAT-ATE. Second, the problem of test schedule which is equitant with two-dimensional Bin-Packing problem is presented. Then a TCG denotation satisfied with T-admissible rule is more convenient for combinational optimization. With Simulated annealing algorithm, better test scheduling results can be achieved; but there is no great optimization space because the efficiency of scheduling is greater than 90%. Third, A novel test compression method——Multi-capture testing is proposed to compress the stimuli. And the ATPG results show that MC achieves high compression ratio which is greater than 90% in some large-scale circuits. MISR, widely used in LBIST, is employed to compress the responses. The aliasing analysis demonstrates that the fault coverage reduction is little due to the existence of aliasing. Fourth, an improved TIC (called S-TIC) aiming at structured test is proposed based on ARM's TIC. A MC scheduling algorithm is proposed to compute the SoC test time and combine MC vectors to SoC test vectors. The scheduling results shows that test time is greatly reduced when using the proper scheduling priority.

首先,给出了低成本ATE的成本模型,根据此模型得到最低测试成本时系统级测试调度的基本参数——测试Site数;其次,本文将DAT-Scan方式的SoC测试调度等价为两维BP问题,为有效地求解该问题,将该BP问题表示为TCG图并通过模拟退火算法解决其求解过于复杂的问题,调度的结果表明该方法在测试时间上有一定改善,并指出DAT-Scan测试调度效率已经大于90%,进一步优化的空间较小;第三,本文尝试通过测试压缩来解决激励所需的测试带宽,提出了Multi-capture结构并解决了MC测试过程中的&矢量&退化问题,MC测试的ATPG结果表明其测试压缩率很高(大电路接近90%);第四,在激励获得很高压缩比的情况下,测试响应也需压缩,本文采用LBIST中常用的MISR作为MC测试的响应压缩电路,理论分析和实验结果都证明了MC测试的别名对故障覆盖率影响较小(小于2%),并对两类别名的成因做了具体分析;第五,在MC测试及其响应压缩的基础上,本文改进了ARM公司的测试控制器TIC使之适合于MC测试,为了解决MC测试矢量合成问题,本文抽取了MC测试模型,通过固定优先级的MC测试调度模拟将MC矢量合成为ATE矢量,并模拟出了总的MC测试时间。

The joint inversion of some geodynamical parameters and numerical simulating the crustal stress field is presented in this paper. The four nodes quadratic finite element in Chinese area is constructed and the "split node" technique is employed for introducing the fault parameters into the finite element computation.

讨论了利用地应力主方向和GPS资料联合反演与之相关的地球动力学参数及数值模拟地壳应力场的方法,建立了中国及其邻区的四节点有限元模型,解决了有限元数值解算中节点位移不连续的问题。

On the basis of lithosphere dynamics, it is possible to deduce whether the boundary fault cuts through the Moho into the upper mantle of the lithosphere or not, and it is also possible to get the distributions of the values of Te in the study area by gravity tomography. Therefore, it helps to further understand the deep lithospheric geodynamical features in this study area.

通过岩石圈动力学理论,不仅可以推断边界断裂是地壳断裂还是地幔断裂,而且可以通过重力反演得到该区岩石圈有效弹性厚度的分布特征,从而进一步了解该区深部岩石圈形变特征。

The geothermal fields in East China are of the areal and zonal properties,in which the Tanlu fault zone is an active zone of high geotherm,being closely related to its tectonic portion and to the tectonic events since Indosinian movement.

中国东部地热场具有地域性或分带性的特点,其中郯庐断裂带是一高地热活动带,这与其所处的大地构造部位和印支运动以来的构造事件密切相关。

第78/100页 首页 < ... 74 75 76 77 78 79 80 81 82 ... > 尾页
相关中文对照歌词
The Fault In Our Stars
推荐网络例句

The split between the two groups can hardly be papered over.

这两个团体间的分歧难以掩饰。

This approach not only encourages a greater number of responses, but minimizes the likelihood of stale groupthink.

这种做法不仅鼓励了更多的反应,而且减少跟风的可能性。

The new PS20 solar power tower collected sunlight through mirrors known as "heliostats" to produce steam that is converted into electricity by a turbine in Sanlucar la Mayor, Spain, Wednesday.

聚光:照片上是建在西班牙桑路卡拉马尤城的一座新型PS20塔式太阳能电站。被称为&日光反射装置&的镜子将太阳光反射到主塔,然后用聚集的热量产生蒸汽进而通过涡轮机转化为电力