查询词典 in connection with
- 与 in connection with 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The modeling of UDMC is based on the component connection modeling idea, and UDMC accords with the universal component connection method in SSAP to participate in the formation of system state matrix.
自定义直流调制是利用元件连接的思路建模,按照软件中统一元件连接建模的方法参与形成系统状态方程。
-
Test and analytical studies indicated that (1) connection moment strengths in positive bending were similar but in negative bending were different on the order of 0.72 and 0.6 percent compared to the bare steel beam subassembly so that the self-centering behavior of the subassemblies with the composite concrete slab was not observed,(2) force-transferring mechanism in the connection proposed was able to predict the force-deformation relationship of the subassembly with the composite concrete slab, and (3) a general-purpose nonlinear finite element analysis program ABAQUS was used to perform the correlation study on the subassemblies with and without composite concrete slab.
实验结果显示(1)含楼版试体在千斤顶往正方向作用时的弯矩与未架设楼版试体接近,但在千斤顶往负方向作用时未架设楼版试体的弯矩分别约为含楼版试体的0.72%及0.6%,所以预力梁柱接合系统於钢梁上架设楼版,对预力系统自行复位的能力造成很大的影响、(2)由预力梁柱接合系统力量与位移间的关系利用迭代方法可以预测含楼版试体的行为、及(3)以有限元素分析程式模拟其中一组含非传统楼版试体以探讨含楼版预力接合系统在挠曲载重作用下的行为。
-
This article, based on key technique and different objective conditions in terms of geography and geology, such as soft soils, shallow water, and heavy sludge seen in ChangHong tunnel, presents features of key construction technique in ChangHong Project, such as slope stability and bottom settlement control in dry dock, cracks control and freeboard control technique respectively for element fabrication, pile foundation construction, and piles-tube connection technique, such technique like, sludge cleanup in immersion trench, and element sinking/positioning technique together with element joint (including connection to abutment and final joint).
文章根据沉管隧道工程建设的关键技术和宁波常洪隧道工程土软、水浅、淤重等客观地质地理环境条件,介绍了宁波常洪沉管隧道工程的施工技术特点,如干坞边坡稳定和管底基础变形的控制技术、本体防水混凝土管段制作的裂缝和干舷控制技术、管段江中桩基基础的施工和其与管底连接的技术工艺、管段基槽清淤和沉放定位施工技术,以及管段接头连接(包括与岸边段的连接和最终接头)的施工技术等。
-
This article, based on key technique and different objective conditions in terms of geography and geology, such as soft soils, shallow water, and heavy sludge seen in ChangHong tunnel, presents features of key construction technique in ChangHong Project, such as slope stability and bottom settlement control in dry dock, cracks control and freeboard control technique respectively for element fabrication, pile foundation construction, and piles-tube connection technique, such technique like, sludge cleanup in immersion trench, and element sinking/positioning technique together with element joint (including connection to abutment and final joint).
本文根据沉管隧道工程建设的关键技术和宁波常洪隧道工程土软、水浅、淤重等客观地质地理环境条件,介绍了沉管隧道工程的施工技术特点,如干坞边坡稳定和管底基础变形的控制技术、本体防水混凝土管段制作的裂缝和干舷控制技术、管段江中桩基基础的施工和其与管底连接的技术工艺、管段基槽清淤和沉放定位施工技术,以及管段接头连接(包括与岸边段的连接和最终接头)的施工技术等。
-
This article, based on key technique and different objective conditions in terms of geography and geology, such as soft soils, shallow water, and heavy sludge seen in ChangHong tunnel, presents features of key construction technique in ChangHong Project, such as slope stability and bottom settlement control in dry dock, cracks control and freeboard control technique respectively for element fabrication, pile foundation construction, and piles-tube connection technique, such technique like, sludge cleanup in immersion trench, and element sinking/positioning technique together with element joint (including connection to abutment and final joint).
本文根据沉管隧道工程建设的关键技术和宁波常洪隧道工程土软、水浅、淤重等客观地质地理环境条件,介绍了沉管隧道工程的施工技术特点,如干坞边坡稳定和管底基础变形的控制技术、本体防水混凝土管段制作的裂缝和干舷控制技术、管段江中桩基基础的施工和其与管底连接的技术工艺、管段基槽清淤和沉放定位施工技术,以及管段接头连接(包括与岸边段的连接和最终接头)的施工技术等。中国诺宇综合网http://www.siaaa.com
-
This article, based on key technique and different objective conditions in terms of geography and geology, such as soft soils, shallow water, and heavy sludge seen in ChangHong tunnel, presents features of key construction technique in ChangHong Project, such as slope stability and bottom settlement control in dry dock, cracks control and freeboard control technique respectively for element fabrication, pile foundation construction, and piles-tube connection technique, such technique like, sludge cleanup in immersion trench, and element sinking/positioning technique together with element joint (including connection to abutment and final joint).
本文根据沉管隧道工程建设的关键技术和宁波常洪隧道工程土软、水浅、淤重等客观地质地理环境条件,介绍了沉管隧道工程的施工技术特点,如干坞边坡稳定和管底基础变形的控制技术、本体防水混凝土管段制作的裂缝和干舷控制技术、管段江中桩基基础的施工和其与管底连接的技术工艺、管段基槽清淤和沉放定位施工技术,以及管段接头连接(包括与岸边段的连接和最终接头)的施工技术等。中国论文联盟http://www.lwlm.com
-
Across joins 2 be: Both sides makes alternate connection, mutual promotion opposite party needs the keyword of promotion, if A B C D stands, a B station is my site, c D station is site of the other side, it is me above all with A the station puts join of station of C of the other side, the other side joins with D station my B stands, such quality that makes the A station that the condition is me asks like Pr and the condition of the D station of the other side is a balance, such we just make connection significant, simple for the rank that such purpose is the C station that we popularize him in side the other side, the other side is popularizing the rank that our B stands, be mutual benefit actually, a lot of had not become alternate connective friend, should turn to them a little only next turns, they are muddleheaded, it is a dot really so it is cerebrum begins god-given report, but the result that such doing is very fast, the result that compares direct trade is good, because search engine to like one-way link, such rank is collected what come is fast, most stationmaster feels to inquire inconvenience so, what such doing is easy let stationmaster consider as cheating join, because such inquiry is no-go, unlike straight contact joins into the other side the connection that can see he stands is checked easily, anyway aught has the one side of its advantages and disadvantages!
交叉连接二是:双方都做交叉连接,互相推广对方需要推广的关键词,如 A B C D 站,A B 站是我的站点, C D站是对方站点,首先是我用A站放对方C站连接,对方用D站连接我的B站,这样的做条件是我的A站的质量如pr要求和对方的D站的条件是平衡的,这样我们才做连接有意义了,简单来说这样的目的是我们在帮对方推广他的C站的排名,对方在推广我们的B站的排名,其实都是互利的,好多没有做过交叉连接的朋友,只要稍微给他们转下弯,他们就糊涂了,这样的确是点是大脑开始难得反映,但是这样做的效果很快,比直接交换的效果好,因为搜索引擎喜欢单向连接,这样的排名收录都来的快,大多数站长觉得这样查询不方便,这样做的容易让站长认为是在骗连接,因为这样的查询是不方便,不像直接点进对方连接能看见自己站的连接容易检查,反正任何事物都有它的利弊的一面吧!
-
The Fen 1 Reservoir, as the short term regulating reservoir of SM Connection Works, also has the sedimentation problem. With the increasing sedimentation and the useful storage decreasing, the reservoir is losing the ability of regulating and a new reservoir will be needed to build upstream the river. In this case, in order to determine the operation mode of the reservoir in flood season, the joint operation of Fen 1, Fen 2 and Haoshuigou reservoir, the density flow desilting rule and the control mode of the Fen 1 reservoir, we analyze the disilting for the regulating reservoir of Wanjiazhai Yellow River Diversion Project Connection Works.
汾河水库作为引黄工程南干联接段的近期调节水库,也存在泥沙淤积问题;随着汾河水库泥沙淤积的加剧,兴利库容将逐年减少并逐渐失去对引黄水的调节能力,需要在上游修建新的调节水库,在这种情况下,进行了万家寨引黄工程联接段调节水库泥沙冲淤分析研究,主要目的就是确定南干调节水库汛期运用方式、汾河水库、汾河二库、好水沟水库联合运用的淤积形态,以及汾河水库异重流排沙规律和汾河水库的运行调度方式。
-
Simulation results of systems with V,v connection, three-phase-to-four-phase connection and single YN,dl 1-275 connection are showed in this paper. The proposed configurations of cophase AT power supply systems, balance compensation methods, comprehensive detecting reference currents are proved to be true and feasible.
针对本文给出的同相牵引供电系统,基于Matlab/Simulink建立了仿真模型,给出了V,y接线、三相变四相平衡接线和单台YN,d11-275接线的同相AT牵引供电系统仿真结果,仿真结果证实本文给出的同相AT供电系统结构
-
The invention relates to a node marking method in a wireless Mesh network, including that a first node transmits connection request information; a second node returns to connection response information or selects an undistributed correlation sign to mark the connection relation and return to one connection response information; the first node judges whether the correlation sign is conflicted with a distributed correlation sign or not, if yes, then retransmitting is carried out; the first node or the second node transmits information to a correspondent node; the correspondent node searches a corresponding transmitting node from a local record according to the analyzed MAC address and searches a Mesh node mark; by judging according to the mark, if no bit position is corresponding to the Mesh node mark or the corresponding bit position is set as 'no', which means that no data is transmitted to the correspondent node; otherwise, data is transmitted to the correspondent node.
本发明涉及无线Mesh网络中的节点标识方法,包括第一节点发送连接请求消息;第二节点返回连接响应消息,或者选择一个未分配的关联标志来标识连接关系,返回一个连接响应消息,第一节点判断关联标志与已分配的关联标志是否冲突,如是则重新发送;第一或第二节点向对端节点发送消息;对端节点根据解析出的MAC地址从本地记录中查找对应的发送节点,并查找Mesh节点标识;根据标识进行判断,若没有与Mesh节点标识对应的比特位或对应的比特位设置为&否&,则表示没有要发送给对端节点的数据;否则表示有。
- 推荐网络例句
-
However, as the name(read-only memory)implies, CD disks cannot be written onorchanged in any way.
然而,正如其名字所指出的那样,CD盘不能写,也不能用任何方式改变其内容。
-
Galvanizes steel pallet is mainly export which suits standard packing of European Union, the North America. galvanizes steel pallet is suitable to heavy rack. Pallet surface can design plate type, corrugated and the gap form, satisfies the different requirements.
镀锌钢托盘多用于出口,替代木托盘,免薰蒸,符合欧盟、北美各国对出口货物包装材料的法令要求;喷涂钢托盘适用于重载上货架之用,托盘表面根据需要制作成平板状、波纹状及间隔形式,满足不同的使用要求。
-
A single payment file can be uploaded from an ERP system to effect all pan-China RMB payments and overseas payments in all currencies.
付款指令文件可从您的 ERP 系统上传到我们的电子银行系统来只是国内及对海外各种币种付款。