查询词典 in condition
- 与 in condition 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Design and make tubular-support and columns-support lucite silo models as well as rubber cushion imitating elastic foundation. Make static and dynamic experiments on elastic and rigid foundations under several kinds of working condition and correct the experiment condition according to FEM calculating result and re-experiment.
自行设计并自制了筒承式和柱承式有机玻璃筒仓模型及弹性地基的模型—海绵橡胶基,进行了在刚性及弹性地基上多种工况的静、动力实验并根据计算结果对实验条件进行修正后再次试验。
-
Optimization method is applied to the layout design of mechanisms on trolley in order to maintain an even distribution of optimization design on an example a trolley with given wheel base and track gauge ,using even distribution of wheel loads as an objective funtion and condition of a signle hook lifting trolley as restrictive condition
桥式起重机的大车设有起升机构和小车运行机构,为使小车轮压呈均匀分布,应对大车的机构布置进行优化设计,以知大车轨迹和轴矩为例,以车轮轮压均匀分配为目标函数,按单钩起重大车的条件提出约束条件,对优化设计的结果进行分析如下
-
The root biomass increased with high N and K applications under well-watered condition, but did not increase under water deficit condition.
复水后抗旱型品种的生长速率和干物质相对增长率在均高于干旱敏感型品种,而根系的生长抑制率低于干旱敏感型品种。
-
The temperature and stress field of wagon wheel under the condition of long ramp way cycle braking in Daqin line have been simulated by using FEM and axial symmetry model Results indicate that high stress area appears on the wheel web, and the strength of wheel meets the requirement of routine operation under current braking condition.
采用轴对称模型和有限元方法,模拟了大秦线长大坡道循环制动条件下货车车轮温度和应力场,结果表明车轮高应力区出现在辐板上,现行制动条件下车轮强度满足使用要求。
-
At the same time, the finite staff element method is used to analyze the influence of beam rigidity; and the two new methods proposed are used to analyze the influence of connect way between piles and beam; and the conclusion is obtained that the rigidity ratio between beam and piles being 0.48 is appropriate; the continuative increase of the rigidity ratio is not significant; the worst condition is that connecting way between piles and beam is hinged; the best condition is that connecting way between piles and beam is rigid. Whether is single-row pile or are double-row piles, when the front of single-row pile or the front of the front-row pile(in the double-row piles) needed excavation, it is supposed to that ought to be carefulness to excavate, because it is that the engineering cost increased greatly.
同时,用有限杆单元法,对双排桩的连梁刚度和用文中提出的方法以桩梁连接方式进行了试验和理论分析得出如下结论:在满足不相互影响排桩间距的情况下,桩顶连梁与桩的刚度比不小于0.48是合适的,此时再增加连梁刚度无意义;桩梁连接为铰结时双排桩受力变形性质最差,刚结时受力变形性质最好;不论是单排桩还是双排桩,桩前和前排桩桩前土体需要开挖时应慎重,因为这种开挖对支护结构影响很大,造价增加很多;双排桩省钱,而且抵抗变形的能力强,值得在工程中研究和广泛应用
-
After addition of surface active agent into sprinkling solution, for particle of 1 μm size, the filtration rate has increased from 40% to 70% approximately under the condition of head wind velocity of 1.5 m/s and spr4nkling density of 2.36 kg/(m^2s), and the filtration rate has increased from 30% to 60% approximately under the condition of head wind velocity of 2.8 m/s and sprinkling density of 2.36 kg/(m^2s).
在喷淋溶液中添加表面活性剂后,对于粒径为1 μm的尘粒,在迎面风速为1.5 m/s、淋水密度为2.36 kg/的条件下,过滤效率由40%左右上升至70%左右。在迎面风速为2.8 m/s、淋水密度为2.36 kg/条件下,过滤效率由30%左右上升至60%左右。
-
Wang Jieying, Zhao Guangjie, Yang Qingling, Qi Chao, Ikuho IidaAbstract: Compression behaviours and subsequent heat treatment of China fir under water-saturated condition and air-dried condition are compared and discussed. Heat treatment is carried out in a common oven and in a vacuum oven, with temperature of 180℃ and time of 6 h, 10 h, 15 h and 25 h respectively.
该研究采用烘箱热处理和真空热处理方法,在热处理温度都为180℃,热处理时间分别为6 h,10 h,15 h,25 h的条件下,研究比较了饱水状态和气干状态杉木试材的径向压缩成型特性及其在不同方式热处理条件下热处理永久固定的效果。
-
Based on these, an improving μ-synthesis is presented, with which the high-purity distillation is designed well. 2. The robust performance problem of MIMO plant is explained with the plant direction angle, which shows that the robust performance varies with different input uncertainties and the μ-synthesis should be applied correctly according to the uncertainty structure. 3. Condition number and bandwidth are the important items for robust performance design in MIMO system. The H〓 two-block problems can not deal with the robust performance design of MIMO system because of the condition number cancellation. A general μ-synthesis procedure for MIMO system with uncertainties is presented. 4. For the SISO system, the object function in robust performance is amplified by at most 〓 than that of H〓 two-block problems in value: So the robust performance of SISO system can be done with the H〓 two-block problems to avoid the complicated μ-synthesis procedure. 5. All the conclusions and methods presented in this paper are demonstrated by some typical design examples.
从而形成一种改进的μ综合方去,并对精馏塔病态对象进行了鲁棒性能设计,得到令人满意的结果;(2)利用对象的方向角解释了MIMO对象鲁棒性能设计出现问题的原因,并提出不同输入摄动形式下系统的鲁棒性能问题也并不相同,因此利用μ综合处理鲁棒性能设计时,应根据不同的摄动情况采用不同的结构进行设计:(3)条件数问题和带宽问题是MIMO系统鲁棒性能设计的两个主要问题,指出由于条件数对消的存在使得一般H〓两块问题无法处理MIMO系统的鲁棒性能设计,而μ综合方法则是处理MIMO系统鲁棒性能设计的有效方法,并给出了其处理MIMO系统鲁棒性能设计的一般性方法;(4)提出对于SISO系统H〓两块问题(S/T问题、S/KS问题)的设计指标函数与鲁棒性能设计的μ指标函数在数值上最大差〓倍,因此对于一般SISO系统的鲁棒性能设计可以简单地用一般的H〓的两块问题处理,而避免μ综合设计的复杂过程;(5)本文中提出的结论和算法都利用H〓/μ发展中的典型例子:Doyle-Stein问题,Safonov的战斗机模型,精馏塔对象等进行了设计验证。
-
It proves that tree top leaves suffer from water stress and hydraulic limitation becomes greater with tree height.Water stress influence tree height growth in several aspects:firstly is the influence of exterior water condition,and community average tree height is positive with exterior water condition.Secondly, hydraulic limitation influences individual tree structure and function.Xeromorphic structure,Lower water potential and turgor pressure limit cell division and expansion,which restrict gas exchange and carbon assimilation capability.However,respiration consumption increases with the spread of tree crown.Shortage of nutrient limits carbon investigation on new leave growth and may ultimately limit tree growth.Thus,the main limitation of tree height is water.
水分对树高生长的限制首先是外在的水分状况,群落的总体高度随外界水分状况的变差而变矮;再就是水力限制对单株树木的结构和功能的影响,水势降低、膨压减小使细胞的分裂和扩展受限,旱生型结构加剧水力对气体交换能力的限制、使光合碳同化能力受到限制、而呼吸消耗却随着树木个体的增大而增大,制造营养物质不足、使得营养亏缺、造成投入新枝叶的营养受限,最终限制了树高继续增长。
-
Against the compound transformation problem of existed shield tunnel under construction of foundation pit of the Beixinqiao station in Beijing No.5 subway line, by ANSYS, combining with geological condition and according to the different working condition, three-dimensional numeric models are built and the emulation of the construction process is carried on.
针对北京地铁五号线地铁车站基坑施工条件下既有盾构隧道的复合变形问题,基于ANSYS,结合场地的水文地质和工程地质条件,按照不同的工况建立了三维数值模型,并进行了施工过程的模拟通过对结果的对比和分析,揭示了在不同施工状态下,基坑周围土体、支护结构及既有盾构隧道之间相互作用的过程和机理,以及由此引起的围岩变形的分布与变化规律。
- 相关中文对照歌词
- Condition Critical
- No Condition
- Tată (Father - Romanian Version)
- Te-Am Visat
- Sad Condishun
- Just Dropped In (To See What Condition My Condition Was In)
- Just Dropped In (To See What Condition My Condition Was In)
- Just Dropped In
- What Condition Am I In?
- Strange Condition
- 推荐网络例句
-
Looking to bounce back from defeat against Cesena last weekend, the Calabrian boss will be sticking to his tried and tested 4-3-3, with Lopez and Sedivic joined up front in Giampaolo's absence by either Nanni or Plasmati.
鉴于上周末对切塞纳的比赛中反败为胜,这支南方球队将会更坚持其一贯而有效的4-3-3阵型,洛佩斯和塞德维奇将取代受伤缺席的詹保罗,和纳尼或者帕斯马蒂中的一个搭档锋线。
-
Meanwhile, their exposure to the more freewheeling ways of the West broadened dramatically.
另外,西方较自由的生活方式对年轻人的影响增大。
-
We are fed up with what the garrulous old lady said.
我们已经对那位爱唠叨的老太太所说的话感到厌烦了。