查询词典 in condition
- 与 in condition 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The first part is an introduction. It describes the study significance, the purpose, the method and relative study evolvement from home and abroad and so on. The second part is a study basis. It illustrates study theory of financing storehouse and third-party logistics in details, which is a supply chain model theory resulting from logistics theory and financing storehouse theory and the third-party enterprise. The third part introduces impawning loan and its choke point in 3PL se...更多rvice innovation and financing storehouse business operation model. The forth part analyses restrictive factors of medium and small enterprises financing storehouse business in our country, which gives relative suggestions. The fifth part analyses the feasibility for construction of supply chain model based on financing storehouse business in 3PL service innovation, which aims at impawning supervision condition in Zhongchu Development Stock Co., Ltd Nanjing branch.
第一部分是绪论,阐明了本文的研究意义、目的、方法以及国内外的相关研究进展情况等;第二部分是研究基础,详细阐述了研究融通仓和第三方物流的相关理论,分别是物流理论、融通仓理论和第三方物流公司主导的供应链模式理论;第三部分介绍了第三方物流服务创新中质押贷款及其瓶颈,以及融通仓业务的运作模式;第四部分,分析了我国中小企业开展融通仓业务的制约因素,并提出了相关建议;第五部分,针对中储股份南京分公司开展质押监管的情况,分析了在第三方物流服务创新中,构建基于融通仓业务的供应链模式的可行性。
-
Likewise, there was a significant result in the case of investigating whether luteal cells in early stage was affected by hypoxia similarly to those in middle stage, given big difference in the development of cell physiology. In this experiment, luteinized granulosa cells were used to mimic the early stage luteal cells. And luteinized granulosa cells were also cultured under the normoxic conditon and the hypoxic condition individually.
另一方面,由於中期黄体细胞发育已臻成熟,其细胞生理与黄体发育初期已然有所差异,因此本研究亦应用黄体化粒性细胞模拟发育初期之黄体细胞,并培养於正常氧或缺氧条件下,添加PKA讯息传递路径活化剂(oLH或8-bromo-cAMP)测定孕酮生成与相关蛋白质之表现差异。
-
In this his dissertation, the field geological work and modern analysis were finished on the Qulong ore-bearing porphyries. The mineralization chronology, petrology, element and isotopic geochemistry were studied on the porphyries. This dissertation also compare this work in Qulong ore-bearing porphyries with other ore-bearing porphyries in Gangdese belt, in order to probe into dynamical background and mineralization features of the ore belts in the condition of India-Eurasia collision.
在充分搜集、利用前人资料及成果的基础上,本论文力求以地球动力学和现代成矿理论为指导,采用先进的分析测试手段和野外地质工作相结合的方法,通过重点研究驱龙斑岩铜矿床的岩石学、同位素地球化学、常量与微量元素地球化学及成矿年代学,并与冈底斯其它斑岩矿床对比,探讨在印度—欧亚大陆碰撞条件下,冈底斯斑岩铜矿带的大陆动力学背景及成矿规律。
-
Now the Condition of the above-written Guarantee is such that if the Contractor shall duly perform and observe all the terms provisions conditions and stipulations of the said Contract on the Contractor's part to be performed and observed in accordance with the true purport intent and meaning thereof or if on default by the Contractor the Guarantor shall satisfy and discharge the damages sustained by the Employer thereby up to the amount of the above-written Guarantee then this obligation shall be null and void but otherwise shall be and remain in full force and effect but no alteration in terms of the said Contractor or in the extent or nature of the Works to be executed, completed and defects in the Works remedied thereunder and no allowance of time by the Employer of the Engineer under the said Contract nor any forbearance or forgiveness in or respect of any matter or thing concerning the said Contract of the part of the Employer or the said Engineer shall in any way release the Guarantor from any liability under the above-written Guarantee.
现在在之上书面保证的条件是这样如果承包商将执行和适当地将观察前述合同的所有期限供应条件和规定在承包商的零件执行和被观察与真实的主旨意向符合和意思因此或如果在缺省由承包商保人将满足和将释放损失由雇主遭受因此由相当数量在之上书面保证决定然后这义务将是除消并作废的但否则将是和将依然是在充分的力量和作用但没有改变根据前述承包商或在工作被执行,被完成和瑕疵的程度或本质在工作由工程师的雇主补救在其下和没有任一件问题或事容限时间根据前述合同亦不任一忍耐或饶恕或尊敬关于雇主或前述工程师的部份的前述合同在任何情况下发行将保人从任一个责任在在之上书面保证之下。
-
Option One: a multi-polar set of ordinary water pipe installation balancing valve hole ① in charge of water pipe line and the 20-hole HVAC balancing valves installed ② Install a balancing valve in the shaft exit ③ air box installed in each balancing valve ④ In each of the tenants on the installation of balancing valve outlet Option Two: Using the Dynamic Balance valve ① fan coil unit installed in the end of the balancing valve ② air-condition the box at the end of the balancing valve is installed After the economic comparison, the final adoption of the balance valve program ① air box end of the installation of balancing valve and the automatic control valve ② retail and office space within the District, a combination of two or three fan coil balancing valves and automatic control valves, each fan coil outside the district office for personal use of a balance valve and automatic control valve 3, balance valve application summary ① long pipeline DRS installation of large multi-level system price higher than the end of the normal balance valve device a dynamic balance valve.
方案一:多极设置普通水管井间安装平衡阀①在主管线与20个暖通水管井间安装平衡阀②在竖井出口位置安装平衡阀③在每个空调箱上安装平衡阀④在每个租户的出水口上安装平衡阀方案二:使用动态平衡阀①在末端装置风机盘管上安装平衡阀②在末端装置空调箱上安装平衡阀经过经济比较,最终采纳的平衡阀方案是①空调箱末端安装平衡阀及自控阀②零售和内区写字楼两或三个风机盘管合用一个平衡阀及自控阀,外区写字楼每个风机盘管自用一个平衡阀及自控阀 3、平衡阀应用总结①长管线异程大系统多级安装普通平衡阀价格高于末端设备一级动态平衡阀。
-
Option One: a multi-polar set of ordinary water pipe installation balancing valve hole ① in charge of water line and the 20-hole HVAC balancing valves installed ② Install a balancing valve in the shaft exit ③ air box installed in each balancing valve ④ In each of the tenants on the installation of balancing valve outlet Option Two: Using the Dynamic Balance valve ① fan coil unit installed in the end of the balancing valve ② air-condition the box at the end of the balancing valve is installed After the economic comparison, the final adoption of the balance valve program ① air box end of the installation of balancing valve and the automatic control valve ② retail and office space within the District, a combination of two or three fan coil valves Valves and Controls, for personal use outside the district office for each fan coil unit and automatic control valve of a balance valve 3, balance valve application summary ① long pipeline DRS installation of large multi-level system price higher than the end of the normal balance valve device a dynamic balance valve.
方案一:安全阀多极设置普通水管井间安装平衡阀①在主管线与20个暖通水管井间安装平衡阀②在竖井出口位置安装平衡阀③在每个空调箱上安装平衡阀④在每个租户的出水口上安装平衡阀方案二:使用动态平衡阀①在末端装置风机盘管上安装平衡阀②在末端装置空调箱上安装平衡阀经过经济比较,最终采纳的平衡阀方案是①空调箱末端安装平衡阀及自控阀②零售和内区写字楼两或三个风机盘管合用一个平衡阀及自控阀,外区写字楼每个风机盘管自用一个平衡阀及自控阀 3、平衡阀应用总结①长管线异程大系统多级安装普通平衡阀价格高于末端设备一级动态平衡阀。
-
June 28. Having been somewhat refresh'd with the Sleep I had had, and the Fit being entirely off, I got up; and tho' the Fright and Terror of my Dream was very great, yet I consider'd, that the Fit of the Ague wou'd return again the next Day, and now was my Time to get something to refresh and support my self when I should be ill; and the first Thing I did, I fill'd a large square Case Bottle with Water, and set it upon my Table, in Reach of my Bed; and to take off the chill or aguish Disposition of the Water, I put about a Quarter of a Pint of Rum into it, and mix'd them together; then I got me a Piece of the Goat's Flesh, and broil'd it on the Coals, but could eat very little; I walk'd about, but was very weak, and withal very sad and heavy-hearted in the Sense of my miserable Condition; dreading the Return of my Distemper the next Day; at Night I made my Supper of three of the Turtle's Eggs, which I roasted in the Ashes, and eat, as we call it, in the Shell; and this was the first Bit of Meat I had ever ask'd God's Blessing to, even as I cou'd remember, in my whole Life.
这些我在故事一开始就提到了。父亲说,我如果执意采取这种愚蠢的行动,那么,上帝一定不会保佑我。当我将来呼援无门时,我会后悔自己没有听从他的忠告。这时,我大声说,现在,父亲的话果然应验了:上帝已经惩罚了我,谁也不能来救我,谁也不能来听我的呼救了。我拒绝了上天的好意,上天原本对我十分慈悲,把我安排在一个优裕的生活环境中,让我幸福舒适地过日子。可是,我自己却身在福中不知福,又不听父母的话来认识这种福份。我使父母为我的愚蠢行为而痛心,而现在,我自己也为我的愚蠢行为所带来的后果而痛心。本来,父母可以帮助我成家立业,过上舒适的生活;然而,我却拒绝了他们的帮助。现在,我不得不在艰难困苦中挣扎,困难之大,连大自然本身都难以忍受。而且,我孤独无援,没有人安慰我,也没有人照应我,也没有人忠告我。想到这里,我又大喊大叫:&上帝啊,救救我吧!我已走投无路了啊!&多少年来,我第一次发出了祈祷,如果这也可算是祈祷的话。现在,让我重新回到日记上来吧。
-
Base Station type Software versionTypes of carrier frequency board adoptedTypes of combiner adoptedWhether had obtained the network license or notIndoor type or outdoor type Whether the master port is separated from the remote-port The maximum carrier frequency capacity of single cabinet The maximum supportable sector numbers of single cabinetWhether it is dual-carrier frequency board or notMust it be paired configuration if it's dual-carrier frequency board (namely, the type of single carrier frequency station could only configure the dual-carrier frequency on hardware) The maximum achievable configuration of a single station of the single cabinetReceiver sensitivity The maximum expand capacity of a single base station (the maximum number of TRX in configuration / the number of cabinets which is required)(fill in according with the three sectors) Top box transmitted power (given separately a grade one combine and a grade two combine) The maximum output power of amplifier (voice, a single logical carrier frequency) The maximum output power of amplifier (EGPRS, a single logical carrier frequency)Whether it has tower-interfaceWhether it has built-in lightning protectionWhether it support the ultra-long cover / whether it need for software support (give simple description that how hardware and software could achieve this) The supporting condition of EGSM (it should be supported including by the carrier frequency, combiner) Dual-band carrier wave (whether it supports the mixed use of 900 M/1800M in the same cabinet) The commonality of duplicate parts Whether it can built-in transmission unitThe single cabinet size (high × width × deep) Installation method Whether it can place against the wallThe basic frame full-configured weight and the supportable number of carrier frequencyThe expansion frame full-configured weight and the supportable number of carrier frequency
基站型号软件版本号采用载频板型号采用合路器型号是否已取得入网许可室内型or室外型是否是主远端分离单机柜最大载频容量单机柜最大支持的扇区数是否是双载频板如是双载频板,是否必须成对配置(即单载频站型只能硬件配置双载频)单机柜可达到的单站最大配置接收机灵敏度单基站最大扩展能力(最大配置TRX数/需机柜数)(按3扇区填写)机顶发射功率(分别给出一级合路与两级合路)功放最大输出功率功放最大输出功率(EGPRS,单个逻辑载频)有无塔放接口有无内置避雷装置是否支持超远覆盖/是否需要软件支持(简单描述软硬件如何实现)EGSM支持情况(包括载频、合路器均应支持)双频段载波(是否支持900M/1800M在同一机柜内混合使用)备件通用性是否可以内置传输单元单机柜尺寸安装方式可否靠墙放置基本架满配重量及支持载频数扩容架满配重量及支持载频数是否支持基本架与扩容架跨扇区满配功耗满配时重量供电方式机柜进出线方式合路器损耗合路能力:几合一单扇区最大支持几载频合路到一副天线/采用几个合路器单扇区载频达到需要增加一副天线时,是否支持两级合路换以不增加天线如两级合路插损为是否支持基带跳频和合成跳频每单个合路器在从低载频数向高载频数扩容时,是否还需要增加硬件可用性指标MTBFMTTR系统中断服务时间硬件是否支持EGPRS本次报价软件版本号开始支持EGPRS的软件版本号其他特点注: 1 应分别填写出来按照本次报价要求所采用的全部BTS型号和采用的合路器型号 2 列出本报价要求的全部室外型基站与高功放单元
-
The bulb scales had a higher induction rate of 89.3% to 93.3%, better quality and lower decay rate and the best rooting, in which single-scale reproduction coefficient reached 1.14 to 1.19 when cutting in soil from original environment and peat and pearlite (1:1) as medium under the condition of 25℃ and dark, followed by cutting in peat and sand (2:1) and peat and vermiculite and perlite (1:1:1). There were the highest single-scale reproduction coefficient (1.38) when cutting in sand, but the induction rate was lowest (58.7%). The bulb scales was easy to rot and unfit for use in peat.
以原生土、草炭+珍珠岩(1:1)这2种基质最好,诱导率达89.3%93.3%,平均每鳞片繁殖小鳞茎数较高,达1.14~1.19个,产生的小鳞茎质量也较好,而且鳞片腐烂率低,生根效果也最好;草炭+河沙(2:1)及草炭+珍珠岩+蛭石(1:1:1)的扦插效果仅次于草炭+珍珠岩(1:1);河沙扦插鳞片时,平均每鳞片繁殖小鳞茎数最高,达1.38个,但诱导率最低(58.7%),易造成鳞片干萎,草炭则易造成鳞片大量腐烂,均不宜使用。
-
Based on the differences between the design value and the survey of the bridge deck elevation in constructing the pre-stressed and so on working condition, the model parameters are identified by ANN, and the beam camber of different sections are given. The results demonstrated that the ANN is efficient and the theoretical results fit well with that of forecasting the beam camber in construction.In this thesis, aim to the beam axis shape be exactitude for design, the internal force of the beam be appeased by design request, the concept of modem cybernetics is applied, At the same time, the effecting parameter has collected. The paper build the ANN model in predicting the beam camber an construction and discuss indetail the extraction of inputting nodes information when quoting the fundamental principle of ANN model and introducing research process of the improved BNN. According to them, ANN is applied in the construction control of prestressed concrete continuous bridge. It is successful for used in the No. 4 bridge of Xiangfan bridge over-crossing Hanriver brideg. To predict the construction camber of by ANN method is useful and effective.
本文以大桥成桥线形满足设计要求和成桥内力控制在设计容许范围内为目的,运用现代控制理论的思想,引用神经网络基本原理,详细介绍BP神经网络的研究过程,从而建立预应力混凝土连续梁桥施工预拱度的神经网络模型,并详细讨论了模型的神经网络结点信息的提取,在工程实例的基础上进行了数值计武汉理工大学硕士学位论文算,数值表明,将神经网络应用于预应力混凝土连续梁桥施工控制,获得了满意的结果,在预应力混凝土连续梁桥施工控制技术研究方面,具有方便有效、精度高的优点,具有良好的应用前景。
- 相关中文对照歌词
- I'm In No Condition
- What Condition Am I In?
- Just Dropped In (To See What Condition My Condition Was In)
- Just Dropped In (To See What Condition My Condition Was In)
- 推荐网络例句
-
In the United States, chronic alcoholism and hepatitis C are the most common ones.
在美国,慢性酒精中毒,肝炎是最常见的。
-
If you have any questions, you can contact me anytime.
如果有任何问题,你可以随时联系我。
-
Very pretty, but the airport looks more fascinating The other party wisecracked.
很漂亮,不过停机坪更迷人。那人俏皮地答道。