英语人>网络例句>impounding water reservoir 相关的网络例句
impounding water reservoir相关的网络例句

查询词典 impounding water reservoir

与 impounding water reservoir 相关的网络例句 [注:此内容来源于网络,仅供参考]

N transfer Taocha Headwork water diversion project is run by the State Council approved the construction of the national large-scale water conservancy project is a project of N transfer an important part of both the water diversion project Headwork middle main channel Butterfly Valveswater diversion headworks but also Danjiang auxiliary dam reservoir engineering design for the new site redevelopment and build more power stations buildings are mainly cited sewers grvity induced gate stilling basin power plant and management of space and so on.

南水北调中线陶岔渠首枢纽工程是经国务院南水北调办批准建设的国度大型水利工程,是南水北调中线一期工程的重要状干部分,渠首枢纽工程既是南水北调中线输水总干渠的引水渠首,也是丹江水库的副坝,工程设计为新址重建,并增建发电站,建筑物主要有引渠、重力坝、引水闸、消力池、电站厂房和治理用房等。

The H value was calculated to be 0.246 using Shannon-Wiener diversity index method.By aquatic reservoir evaluation criteria, combined with the type and density of zooplankton,it could be clearly determined that the water quality was seriously polluted and eutrophic.4.Comprehensive assessment of water quality:Affected by the influxion of sewage, slow flow velocity,high contents of nitrogen and phosphorus,the quantities of both zooplankton and phytoplankton at 1st point were relatively high,with the appearance of various indicator species of water pollution.

计算Shannon-Wiener多样性指数法得出H值为0.246,通过水库水生生物评价标准,结合浮游动物种类和密度,可以很清楚判定水质为污染严重,已经呈富营养化。4水质综合评价:排污口1号采样点受生活污水的大量排入的影响,且水流流速缓慢,水中氮磷含量高,因而浮游动物和浮游藻类数量都很高,而且出现很多污染生物指示种,综合分析该水层水质属污染严重的富营养化。

Water injected reservoir ; Water coming time ; Recovery ; Water inroad ; Parameter

注水油藏;见水时间;采收率;水侵;参数

However, in some special water areas the utilitization of StreeterPhelps model has some limitation as confirming reaeration coefficient often comes from tests in rivers with fast water flow speed with no consideration of wave effects. Furthermore, in practical research in Three Gorges Reservoir, the changing rule of COD appears abnormally. In some water areas far from pollution source, the value of COD changes with time, but does not follow the exponential attenuation rule. This phenomenon can not be explained by former modified StreeterPhelps model.

StreeterPhelps模型是目前进行河流水质研究常用的物理模型,具有良好的理论和实用价值,然而在某些特定水域,该模型的应用受到限制,主要原因是复氧系数的取定多在水流速度较大情况下得到的,而未考虑水面波动对复氧系数的影响,另外,在实际研究过程中发现三峡库区COD变化的规律出现异常:在离排污口相当远的水域,COD随时间变化趋势并不是指数衰减,而是在某个常值附近微小摆动,以往很多修正过的StreeterPhelps模型都无法解释这个现象。

After operating the method of storing clear water and discharging muddy water in Sanmenxia Reservoir, the main reason for erosion and deposit in riverway is the change of running water level in flood season .

三门峡水库蓄清排浑运行以来,决定潼关以下库区河道冲淤主要是水库运行水位的高低,汛期水库运行水位的高低对潼关高程的升降起着主要的作用,因此汛期潼关高程的变化主要由水库运行水位决定的。

At the same time of changing watershed intrinsic natural relation, people destroyed its crude system. Watershed is faced with more and more serious crisis in water environment and water lack, which result in water quality worsened, more sandiness, reservoir silted.

人类改变流域原有的自然联系的同时,也破坏了流域天然系统,使流域面临着愈演愈烈的水生态环境危机和严重的水资源短缺问题,从而导致流域上游水质恶化,河流含沙量加大,中下游水库淤积严重。

According to the new comprehension of ecological theory and sustainable development, several suggestions, aimed at developing economic and protecting ecosystem, are put forward, such as designing fine ecological structure, installing the monitoring points in the reservoir to get changing data of water, developing taintless industries to protect water with water, playing government role in the ecological protection and so on.

基于对生态学原理和可持续发展的新认识,从区域发展和生态保护入手,对昌乐县水源地保护提出了构建良好生态结构,建立水库长期监测数据库,"以水养水",发展无污染产业,充分发挥政府在水源地保护中的作用等建议。

According to the characteristics of Guanting Reservoir as being long, narrow and shallow, and those of hydrologic、hydrodynamic and water quality diffusion, CE-QUAL-W2 model is used to stimulate the water quality transformation; and the water quality parameters of the model are tested and verified.

根据官厅水库狭长、水浅和水文、水力、水质扩散等特点,采用CE-QUAL-W2模型模拟其水质变化,并对模拟模型水质参数进行验证,将其用于官厅水库水质的预测研究;进而提出官厅水库水污染控制的对策及建议。

The pressure drop along the horizontal wellhole was combined with the critical pressure drop of the bottom water-driven reservoirs, thus the relation between the critical pressure and the critical flow rate when the horizontal well originally put into production was researched,which provide a reference for the design.of the deliverability of the horizontal well used in the bottom water reservoir existing the bottom water coning.

把水平段压降和底水油藏临界压力结合起来,研究了考虑水平段压降时的水平井初期生产的临界压力和临界产量的关系,为存在底水锥进油藏水平井产能设计提供了参考依据。

A part of sliding mass of fording landslide submerges the water level with the operation of reservoir; and the stability factor of landslide has close connection with water pressure of slices below the water level when the transmission coefficient method is used to calculate the stability of landslide.

在水库运营过程中,水库涉水滑坡会有部分滑体没在水下,在采用传力系数法进行滑坡稳定性计算时,滑坡稳定性系数与水下条块的水压力紧密相关。

第52/500页 首页 < ... 48 49 50 51 52 53 54 55 56 ... > 尾页
相关中文对照歌词
40 Water
Hot Water Burn Baby
Wade In The Water
Cool Cool Water
Water Whippin'
Reservoir
I Go Swimming
Water
Water
Wade In The Water
推荐网络例句

Methods Clinical data of 3 cases of bile duct injury during laparoscopic cholecystectomy were analyzed retrospectively.

回顾总结3例LC术中胆管损伤的临床资料,分析3例胆管损伤的原因及对策。

These techniques are applied to the gobang.

本文将这些技术用于五子棋中。

I don't want to add to your trouble.

我不想给你增加麻烦。