查询词典 immersion
- 与 immersion 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The experimental results show that after immersion for 450 d, the samples including limestone exposed to 5% MgSO4 solution at 5 ℃ and 20 ℃ both could produce thaumasite.
试验结果表明:掺加石灰石粉的水泥砂浆试件置于5﹪ MgSO4溶液、5 ℃及20 ℃温度环境下浸泡450 d后,均能生成碳硫硅酸钙。
-
Whangkeumbae and Huangguan Pear were used in the determination of SA immersion, 1mmol/L significantly delayed the degration of starch, titrable acid, vitamin C and cellulose and maitained higher contents of protein and free amino acid under both room and low temperature, and lmmol/L maintained higher content of soluble sugar during storage anaphase under room temperature.
在常温和冷藏条件下,1mmol/L水杨酸处理果实,能够显著抑制黄金梨和黄冠梨果实中淀粉、可滴定酸、维生素C的降解,保持其较高的可溶性蛋白和氨基酸的含量,并保持了常温贮藏后期较高的可溶性糖含量。
-
Spinach, wild rice stem, leek containing oxalic acid are more advisable moment with hot water immersion to go oxalic acid dissolved in order to avoid foods with calcium into insoluble calcium oxalate.
菠菜、茭白、韭菜都含草酸较多,宜先用热水浸泡片刻以溶去草酸,以免与含钙食品结合成难溶的草酸钙。
-
The mission of CAIS is to educate students for academic excellence, moral character and international perspective through immersion in American and Chinese culture and language.
学校的使命是通过在美国和中华文化和语言沉浸式教育教学活动,培养学生卓越的学术表现,道德品质和国际视野。
-
Through experience sharing and authentic environment immersion, we believe that you can learn English with good cheer.
E象限太空号穿梭在无穷尽的网际宇宙中,是一艘载满英语学习资源的太空船,主要任务是帮助所有见习生培养主动学习的能力,解决英语学习上的问题。
-
This article, based on key technique and different objective conditions in terms of geography and geology, such as soft soils, shallow water, and heavy sludge seen in ChangHong tunnel, presents features of key construction technique in ChangHong Project, such as slope stability and bottom settlement control in dry dock, cracks control and freeboard control technique respectively for element fabrication, pile foundation construction, and piles-tube connection technique, such technique like, sludge cleanup in immersion trench, and element sinking/positioning technique together with element joint (including connection to abutment and final joint).
文章根据沉管隧道工程建设的关键技术和宁波常洪隧道工程土软、水浅、淤重等客观地质地理环境条件,介绍了宁波常洪沉管隧道工程的施工技术特点,如干坞边坡稳定和管底基础变形的控制技术、本体防水混凝土管段制作的裂缝和干舷控制技术、管段江中桩基基础的施工和其与管底连接的技术工艺、管段基槽清淤和沉放定位施工技术,以及管段接头连接(包括与岸边段的连接和最终接头)的施工技术等。
-
This article, based on key technique and different objective conditions in terms of geography and geology, such as soft soils, shallow water, and heavy sludge seen in ChangHong tunnel, presents features of key construction technique in ChangHong Project, such as slope stability and bottom settlement control in dry dock, cracks control and freeboard control technique respectively for element fabrication, pile foundation construction, and piles-tube connection technique, such technique like, sludge cleanup in immersion trench, and element sinking/positioning technique together with element joint (including connection to abutment and final joint).
本文根据沉管隧道工程建设的关键技术和宁波常洪隧道工程土软、水浅、淤重等客观地质地理环境条件,介绍了沉管隧道工程的施工技术特点,如干坞边坡稳定和管底基础变形的控制技术、本体防水混凝土管段制作的裂缝和干舷控制技术、管段江中桩基基础的施工和其与管底连接的技术工艺、管段基槽清淤和沉放定位施工技术,以及管段接头连接(包括与岸边段的连接和最终接头)的施工技术等。
-
This article, based on key technique and different objective conditions in terms of geography and geology, such as soft soils, shallow water, and heavy sludge seen in ChangHong tunnel, presents features of key construction technique in ChangHong Project, such as slope stability and bottom settlement control in dry dock, cracks control and freeboard control technique respectively for element fabrication, pile foundation construction, and piles-tube connection technique, such technique like, sludge cleanup in immersion trench, and element sinking/positioning technique together with element joint (including connection to abutment and final joint).
本文根据沉管隧道工程建设的关键技术和宁波常洪隧道工程土软、水浅、淤重等客观地质地理环境条件,介绍了沉管隧道工程的施工技术特点,如干坞边坡稳定和管底基础变形的控制技术、本体防水混凝土管段制作的裂缝和干舷控制技术、管段江中桩基基础的施工和其与管底连接的技术工艺、管段基槽清淤和沉放定位施工技术,以及管段接头连接(包括与岸边段的连接和最终接头)的施工技术等。中国诺宇综合网http://www.siaaa.com
-
This article, based on key technique and different objective conditions in terms of geography and geology, such as soft soils, shallow water, and heavy sludge seen in ChangHong tunnel, presents features of key construction technique in ChangHong Project, such as slope stability and bottom settlement control in dry dock, cracks control and freeboard control technique respectively for element fabrication, pile foundation construction, and piles-tube connection technique, such technique like, sludge cleanup in immersion trench, and element sinking/positioning technique together with element joint (including connection to abutment and final joint).
本文根据沉管隧道工程建设的关键技术和宁波常洪隧道工程土软、水浅、淤重等客观地质地理环境条件,介绍了沉管隧道工程的施工技术特点,如干坞边坡稳定和管底基础变形的控制技术、本体防水混凝土管段制作的裂缝和干舷控制技术、管段江中桩基基础的施工和其与管底连接的技术工艺、管段基槽清淤和沉放定位施工技术,以及管段接头连接(包括与岸边段的连接和最终接头)的施工技术等。中国论文联盟http://www.lwlm.com
-
First use a little hot water to heat the teapot, then put a certain amount of tea leaves into it and fill it with boiling water, put the lid off and drink it after three-minute immersion.
冲泡时,首先用少量沸水温一下紫砂壶,再投入适量茶叶,冲满沸水,加盖浸泡3分钟左右即可饮用。
- 推荐网络例句
-
According to the clear water experiment, aeration performance of the new equipment is good with high total oxygen transfer coefficient and oxygen utilization ratio.
曝气设备的动力效率在叶轮转速为120rpm~150rpm时取得最大值,此时氧利用率和充氧能力也具有较高值。
-
The environmental stability of that world - including its crushing pressures and icy darkness - means that some of its most famous inhabitants have survived for eons as evolutionary throwbacks, their bodies undergoing little change.
稳定的海底环境─包括能把人压扁的压力和冰冷的黑暗─意谓海底某些最知名的栖居生物已以演化返祖的样态活了万世,形体几无变化。
-
When I was in school, the rabbi explained everythingin the Bible two different ways.
当我上学的时候,老师解释《圣经》用两种不同的方法。